Your address

Lerchenfelder Straße 29

1070 Wien · 7. Neubau

The outline marks the neighbourhood Neustiftgasse / Burggasse area, with 56 addresses.worksplannedzoning change · projects nearby

The LAGE score

This building

Weak · better than 5 % of all addresses in Vienna

The neighbourhood

Neustiftgasse / Burggasse area · Weak · Vienna average: 65.

ScoreThis buildingNeighbourhoodVienna
LQuietness 5 1787
LAir quality 31 3146
APublic transport 100 10090
GGreen space 48 4153
GNatural hazards 100 100100
EEveryday amenities 100 10097

0–100, higher is better. The neighbourhood and city columns show the average score of all their addresses, scored with the same rules.

LAGE stands for Lärm & Luft (noise & air) · Anbindung (transport links) · Grün & Gefahren (green & hazards) · Erledigungen (everyday errands). How it is calculated →

Set your priorities to see your own LAGE for this building →

The neighbourhood in figures

Loud road facade (≥ 65 dB Lden)
100 % of addresses
Free of mapped noise ≥ 55 dB at the building
0 %
Inside a 30- or 100-year flood area
0 %
Public transport class A or B
100 %
Green & open land within 300 m (average)
10 %
Distance to the nearest park or forest (average)
304 m
Protection zone (Schutzzone)
100 %
Residents
1,141 · more densely populated than most of Vienna
The neighbourhood report →

Building works and projects nearby

1 project reaches this address. 12 more projects within 1 km.

Works and changes that reach this address

Further away, within 1 km (12)
  • Roads and bridges Burggasse 25 bis 45 road works
    298 m Under construction · works since 27 July 2026, planned until 30 October 2026 Source: Stadt Wien · 7 records · checked 16 October 2026
  • Roads and bridges Burggasse 67 road works
    307 m Under construction · works since 27 July 2026, planned until 30 October 2026 Source: Stadt Wien · 7 records · checked 16 October 2026
  • Building 1070 Wien, Neustiftgasse 95-99, Dämmung oberste Geschoßdecke - Baumeisterarbeiten
    429 m Contract awarded 8 January 2025 Source: Kerndaten (public tenders) · 4 records · checked 10 October 2026· Found automatically. Check with the source.
    History (4)
    1. award published (Kerndaten)
    2. award published (Kerndaten)
    3. award published (Kerndaten)
    4. award published (Kerndaten)
  • Building 1010 Wien, Schmerlingplatz 10-11, Justizpalast - Gebäudekühlung - Einleitung der Fernkälte - hochbauliche Arbeiten
    471 m Contract awarded 14 May 2025 Source: Kerndaten (public tenders) · 7 records · checked 10 October 2026· Found automatically. Check with the source.
    History (7)
    1. award published (Kerndaten)
    2. award published (Kerndaten)
    3. award published (Kerndaten)
    4. award published (Kerndaten)
    5. award published (Kerndaten)
    6. award published (Kerndaten)
    7. award published (Kerndaten)
  • Public transport Kirchengasse 1 bis 30 U-Bahn construction
    473 m Under construction · works since 28 February 2021, planned until 31 December 2029 · part of U2, 4. Ausbauphase Source: Stadt Wien · 7 records · checked 16 October 2026
  • Roads and bridges Landesgerichtsstraße 6 bis Felderstraße road works
    496 m Under construction · works since 14 September 2026, planned until 1 November 2026 Source: Stadt Wien · 7 records · checked 16 October 2026
  • Public transport Volksgartenstraße 2 U-Bahn construction
    512 m Under construction · works since 28 February 2021, planned until 31 December 2029 Source: Stadt Wien · 7 records · checked 16 October 2026
  • Building E90094/196/0-Dion7/2025, 1070 Wien, Stiftgasse 2-2A, Stift Kaserne, Obj. 001 - Mosertrakt, Instandsetzung - Trockenlegung, Baumeisterarbeiten
    551 m Contract awarded 3 February 2026 Source: Kerndaten (public tenders) · 3 records · checked 10 October 2026· Found automatically. Check with the source.
    History (3)
    1. award published (Kerndaten)
    2. award published (Kerndaten)
    3. award published (Kerndaten)
  • Public transport U5, 4. Ausbauphase
    583 m Planned · opening planned for 2030 Source: Stadt Wien · 21 records · checked 16 October 2026
  • Roads and bridges Albertgasse von Kreuzung Josef-Matthias-Hauer-Platz und Josefstädter Straße bis Kreuzung Florianigas road works
    602 m Under construction · works since 12 October 2026, planned until 1 September 2027 Source: Stadt Wien · 14 records · checked 16 October 2026
  • Building Florianigasse 2- 210 Baumeisterarbeiten
    612 m Contract awarded · contract period 23 March 2026 – 23 January 2028 Source: TED (EU tenders) · 20 records · checked 10 October 2026· Found automatically. Check with the source.
    History (20)
    1. award published (TED 126123-2026)
    2. award published (TED 126473-2026)
    3. award published (TED 126642-2026)
    4. award published (TED 191101-2026)
    5. award published (TED 192384-2026)
    6. award published (TED 278223-2026)
    7. award published (TED 278477-2026)
    8. award published (TED 278637-2026)
  • Building Baumeisterarbeiten Fassadeninstandsetzung, Amtshaus 1010 Wien, Lichtenfelsgasse 2, HOF 2
    620 m Contract awarded 7 July 2026 Source: data.gv.at (information requests) · 2 records · checked 10 October 2026· Found automatically. Check with the source.
    History (2)
    1. award published (IFG)
    2. award published (IFG)

From the City of Vienna (construction sites that affect traffic, zoning procedures, building freezes, planned U-Bahn, tram and major roads), public tenders, the Freedom of Information register and environmental impact assessments. We have recorded these sources every day since 10 October 2026. A moved end date shows as a delay. Private building sites appear only where they affect traffic or were tendered publicly.

The address in figures

Noise

Loudest facade (day–evening–night level)
road ≥ 75 dB, rail 65–69 dB
Quiet side
yes

Getting around

Public transport class
A
Nearest stop
Wien Piaristengasse, 1 min walk, every 9 min
Frequent service (every 10 min or more often)
Wien Piaristengasse, 1 min walk, every 9 min

On foot

Supermarket
2 min
Pharmacy
2 min
Doctor's practice
4 min
Crèche
3 min
Kindergarten
3 min
Primary school
3 min
Middle school
8 min
Playground
5 min

Green and air

Green and open land within 300 m
10 %
Nearest park
unnamed, 3 min walk
Nearest forest
–
NO₂ / PM2.5, modelled 2022
30.6 / 11.2 µg/m³
Heat days per year, now → around 2050
–

Hazards and rules

Flooding
outside mapped flood areas
Zoning
residential
Protection zones
old-town zone

Residents

Residents within 300 m
6,487 · more densely populated than most of Vienna
Who lives in the neighbourhood
fewer children

Prices

Apartments, average €/m² by building age
€ 4,849–6,214 (the Neubau district)

The full report explains every figure, chapter by chapter, with what to check before you sign →

Sources: BEV cadastre and address register, Stadt Wien OGD (zoning, flood and protection zones, facility registers), BMLUK noise and flood maps, WLV hazard zones, ÖROK ÖV-Güteklassen 2025, European Environment Agency, Statistik Austria, © OpenStreetMap contributors. CC BY 4.0 / ODbL. Lagecheck processed the data. All sources and licences →