Your address

Lerchenfelder Straße 7

1070 Wien · 7. Neubau

The outline marks the neighbourhood Neustiftgasse / Lerchenfelder Straße area, with 32 addresses.worksplannedzoning change · projects nearby

The LAGE score

This building

Weak · better than 4 % of all addresses in Vienna

The neighbourhood

Neustiftgasse / Lerchenfelder Straße area · Modest · Vienna average: 65.

ScoreThis buildingNeighbourhoodVienna
LQuietness 5 3287
LAir quality 25 2546
APublic transport 100 10090
GGreen space 53 5253
GNatural hazards 100 100100
EEveryday amenities 100 10097

0–100, higher is better. The neighbourhood and city columns show the average score of all their addresses, scored with the same rules.

LAGE stands for Lärm & Luft (noise & air) · Anbindung (transport links) · Grün & Gefahren (green & hazards) · Erledigungen (everyday errands). How it is calculated →

Set your priorities to see your own LAGE for this building →

The neighbourhood in figures

Loud road facade (≥ 65 dB Lden)
91 % of addresses
Free of mapped noise ≥ 55 dB at the building
0 %
Inside a 30- or 100-year flood area
0 %
Public transport class A or B
100 %
Green & open land within 300 m (average)
11 %
Distance to the nearest park or forest (average)
109 m
Protection zone (Schutzzone)
97 %
Residents
836 · more densely populated than most of Vienna
The neighbourhood report →

Building works and projects nearby

2 new stations are planned within walking distance. 12 more projects within 1 km.

New stations nearby

Further away, within 1 km (12)
  • Roads and bridges Burggasse 25 bis 45 road works
    263 m Under construction · works since 27 July 2026, planned until 30 October 2026 Source: Stadt Wien · 7 records · checked 16 October 2026
  • Building 1010 Wien, Schmerlingplatz 10-11, Justizpalast - Gebäudekühlung - Einleitung der Fernkälte - hochbauliche Arbeiten
    288 m Contract awarded 14 May 2025 Source: Kerndaten (public tenders) · 7 records · checked 10 October 2026· Found automatically. Check with the source.
    History (7)
    1. award published (Kerndaten)
    2. award published (Kerndaten)
    3. award published (Kerndaten)
    4. award published (Kerndaten)
    5. award published (Kerndaten)
    6. award published (Kerndaten)
    7. award published (Kerndaten)
  • Public transport Volksgartenstraße 2 U-Bahn construction
    333 m Under construction · works since 28 February 2021, planned until 31 December 2029 Source: Stadt Wien · 7 records · checked 16 October 2026
  • Roads and bridges Landesgerichtsstraße 6 bis Felderstraße road works
    383 m Under construction · works since 14 September 2026, planned until 1 November 2026 Source: Stadt Wien · 7 records · checked 16 October 2026
  • Roads and bridges Burggasse 67 road works
    472 m Under construction · works since 27 July 2026, planned until 30 October 2026 Source: Stadt Wien · 7 records · checked 16 October 2026
  • Building Baumeisterarbeiten Fassadeninstandsetzung, Amtshaus 1010 Wien, Lichtenfelsgasse 2, HOF 2
    482 m Contract awarded 7 July 2026 Source: data.gv.at (information requests) · 2 records · checked 10 October 2026· Found automatically. Check with the source.
    History (2)
    1. award published (IFG)
    2. award published (IFG)
  • Building E90094/196/0-Dion7/2025, 1070 Wien, Stiftgasse 2-2A, Stift Kaserne, Obj. 001 - Mosertrakt, Instandsetzung - Trockenlegung, Baumeisterarbeiten
    516 m Contract awarded 3 February 2026 Source: Kerndaten (public tenders) · 3 records · checked 10 October 2026· Found automatically. Check with the source.
    History (3)
    1. award published (Kerndaten)
    2. award published (Kerndaten)
    3. award published (Kerndaten)
  • Public transport Kirchengasse 1 bis 30 U-Bahn construction
    524 m Under construction · works since 28 February 2021, planned until 31 December 2029 · part of U2, 4. Ausbauphase Source: Stadt Wien · 7 records · checked 16 October 2026
  • Public transport U-Bahn-Linie U2, Bauabschnitt U2/22 "Rathaus" und U-Bahn-Linie U5, Bauabschnitt U5/2 "Frankhplatz"
    574 m Contract awarded 5 June 2024 · part of U2, 4. Ausbauphase Source: TED (EU tenders) · 86 records · checked 10 October 2026· Found automatically. Check with the source.
    History (86)
    1. award published (TED 462671-2026)
    2. award published (TED 463367-2026)
    3. award published (TED 537334-2026)
    4. award published (TED 538501-2026)
    5. award published (TED 538906-2026)
    6. award published (TED 539471-2026)
    7. award published (TED 539695-2026)
    8. award published (TED 540130-2026)
  • Public transport Stahlbauarbeiten U-Bahn-Linie U2 Bauabschnitt U2/17 „TVM-Vortriebe“, U2/19 „Reinprechtsdorfer Straße“, U2/20„Pilgramgasse“, U2/21 „Neubaugasse“ und U2/22 „Rathaus“
    574 m Contract awarded · since 1 January 2026 · part of U2, 4. Ausbauphase Source: TED (EU tenders) · 9 records · checked 10 October 2026· Found automatically. Check with the source.
    History (9)
    1. award published (TED 653337-2023)
    2. tender published (TED 181319-2025)
    3. tender published (TED 525131-2025)
    4. tender published (TED 817496-2025)
    5. award published (TED 288442-2026)
    6. tender published (TED 393288-2026)
    7. tender published (TED 445680-2026)
    8. award published (TED 550551-2026)
  • Building Florianigasse 2- 210 Baumeisterarbeiten
    607 m Contract awarded · contract period 23 March 2026 – 23 January 2028 Source: TED (EU tenders) · 20 records · checked 10 October 2026· Found automatically. Check with the source.
    History (20)
    1. award published (TED 126123-2026)
    2. award published (TED 126473-2026)
    3. award published (TED 126642-2026)
    4. award published (TED 191101-2026)
    5. award published (TED 192384-2026)
    6. award published (TED 278223-2026)
    7. award published (TED 278477-2026)
    8. award published (TED 278637-2026)
  • Building 1070 Wien, Neustiftgasse 95-99, Dämmung oberste Geschoßdecke - Baumeisterarbeiten
    613 m Contract awarded 8 January 2025 Source: Kerndaten (public tenders) · 4 records · checked 10 October 2026· Found automatically. Check with the source.
    History (4)
    1. award published (Kerndaten)
    2. award published (Kerndaten)
    3. award published (Kerndaten)
    4. award published (Kerndaten)

From the City of Vienna (construction sites that affect traffic, zoning procedures, building freezes, planned U-Bahn, tram and major roads), public tenders, the Freedom of Information register and environmental impact assessments. We have recorded these sources every day since 10 October 2026. A moved end date shows as a delay. Private building sites appear only where they affect traffic or were tendered publicly.

The address in figures

Noise

Loudest facade (day–evening–night level)
road ≥ 75 dB, rail 60–64 dB
Quiet side
yes

Getting around

Public transport class
A
Nearest stop
Wien Auerspergstraße, 2 min walk, every 7 min
Frequent service (every 10 min or more often)
Wien Auerspergstraße, 2 min walk, every 7 min

On foot

Supermarket
1 min
Pharmacy
4 min
Doctor's practice
4 min
Crèche
1 min
Kindergarten
1 min
Primary school
5 min
Middle school
10 min
Playground
2 min

Green and air

Green and open land within 300 m
10 %
Nearest park
unnamed, 1 min walk
Nearest forest
–
NO₂ / PM2.5, modelled 2022
32.5 / 11.5 µg/m³
Heat days per year, now → around 2050
–

Hazards and rules

Flooding
outside mapped flood areas
Zoning
core / mixed use
Protection zones
old-town zone, UNESCO World Heritage

Residents

Residents within 300 m
4,287 · more densely populated than most of Vienna
Who lives in the neighbourhood
fewer children

Prices

Apartments, average €/m² by building age
€ 4,849–6,214 (the Neubau district)

The full report explains every figure, chapter by chapter, with what to check before you sign →

Sources: BEV cadastre and address register, Stadt Wien OGD (zoning, flood and protection zones, facility registers), BMLUK noise and flood maps, WLV hazard zones, ÖROK ÖV-Güteklassen 2025, European Environment Agency, Statistik Austria, © OpenStreetMap contributors. CC BY 4.0 / ODbL. Lagecheck processed the data. All sources and licences →