Your address
Lessinggasse 9
1020 Wien · 2. Leopoldstadt
The LAGE score
This building
Good · better than 70 % of all addresses in Vienna
The neighbourhood
Taborstraße / Vereinsgasse area · Fair · Vienna average: 65.
| Score | This building | Neighbourhood | Vienna |
|---|---|---|---|
| LQuietness | 67 | 59 | 87 |
| LAir quality | 37 | 37 | 46 |
| APublic transport | 100 | 100 | 90 |
| GGreen space | 67 | 61 | 53 |
| GNatural hazards | 100 | 100 | 100 |
| EEveryday amenities | 100 | 100 | 97 |
0–100, higher is better. The neighbourhood and city columns show the average score of all their addresses, scored with the same rules.
LAGE stands for Lärm & Luft (noise & air) · Anbindung (transport links) · Grün & Gefahren (green & hazards) · Erledigungen (everyday errands). How it is calculated →
Set your priorities to see your own LAGE for this building →
The neighbourhood in figures
- Loud road facade (≥ 65 dB Lden)
- 49 % of addresses
- Free of mapped noise ≥ 55 dB at the building
- 0 %
- Inside a 30- or 100-year flood area
- 0 %
- Public transport class A or B
- 100 %
- Green & open land within 300 m (average)
- 18 %
- Distance to the nearest park or forest (average)
- 140 m
- Protection zone (Schutzzone)
- 53 %
- Residents
- 733 · more densely populated than most of Vienna
Building works and projects nearby
This address lies beyond the reach of every construction site, zoning change and planned line. 12 more projects within 1 km.
Further away, within 1 km (12)
-
Pipes and cables Kanalsanierung und Hybridanlage - Schule Wien 2, Vereinsgasse 2991 m Contract awarded 12 December 2025 Source: data.gv.at (information requests) · checked 10 October 2026· Found automatically. Check with the source.
-
Building Heizung, Klimatechnik, Lüftung und Sanitär212 m Tendered · contract period 30 March 2026 – 28 June 2027 Source: TED (EU tenders) · 3 records · checked 10 October 2026· Found automatically. Check with the source.
History (3)
- tender published (TED 629712-2025)
- tender published (TED 701861-2025)
- tender published (TED 705095-2025)
-
Building 20., Nordwestbahnhof – Phase A.2332 m Tendered · 100 flats Source: Stadt Wien · checked 16 October 2026
-
Roads and bridges (ProVia-ID 116375) Technische Freimachung Wien Nordwestbahnhof; Abbrucharbeiten379 m Contract awarded · contract period 2 September 2024 – 1 September 2028 Source: TED (EU tenders) · 2 records · checked 10 October 2026· Found automatically. Check with the source.
History (2)
- tender published (TED 281451-2024)
- award published (TED 492315-2024)
-
Building BAUI.IM6009: Technische Freimachung Wien Nordwestbahnhof - Abbrucharbeiten404 m Contract awarded 28 September 2026 Source: Kerndaten (public tenders) · 4 records · checked 12 October 2026· Found automatically. Check with the source.
History (4)
- award published (Kerndaten)
- award published (Kerndaten)
- award published (Kerndaten)
- award published (Kerndaten)
-
Building PPP-Projekt Bildungscampus Nordwestbahnhof (BC NWBHF Planung, Errichtung, Finanzierung und Verfügbarhaltung) Adresse: 20., Rebhanngasse404 m Contract awarded · since 1 June 2026 Source: TED (EU tenders) · 2 records · checked 10 October 2026· Found automatically. Check with the source.
History (2)
- tender published (TED 587888-2024)
- award published (TED 326240-2026)
-
Pipes and cables Nordbahnstraße von Alliiertenstraße bis Am Tabor pipe laying419 m Under construction · works since 26 July 2026, planned until 1 November 2026 Source: Stadt Wien · 7 records · checked 16 October 2026
-
Public transport Linie 29: Augarten522 m Planned Source: Stadt Wien · 7 records · checked 16 October 2026
-
New quarter 20., Nordwestbahnhof – Phase A.1536 m Planned · developer competition 2025 · 520 flats Source: Stadt Wien · checked 16 October 2026
-
Public transport ÖBB Wohnprogramm, 1020 Wien, Mühlfeldgasse 15 & 16 - Generalunternehmerleistungen Bau540 m Contract awarded 23 June 2025 Source: Kerndaten (public tenders) · checked 10 October 2026· Found automatically. Check with the source.
-
New quarter Nordwestbahnstraße 59-39613 m Approved 2022 Source: Stadt Wien · checked 16 October 2026
-
Building Stadt Wien - Wiener Wohnen - 02., Miesbachgasse 15 - Dach654 m Contract awarded · since 4 February 2025 Source: TED (EU tenders), Kerndaten (public tenders) · 33 records · checked 10 October 2026· Found automatically. Check with the source.
History (33)
- award published (TED 154504-2025)
- award published (TED 161893-2025)
- award published (Kerndaten)
- award published (TED 444666-2025)
- award published (Kerndaten)
- tender published (TED 676291-2025)
- award published (Kerndaten)
- award published (TED 234839-2026)
From the City of Vienna (construction sites that affect traffic, zoning procedures, building freezes, planned U-Bahn, tram and major roads), public tenders, the Freedom of Information register and environmental impact assessments. We have recorded these sources every day since 10 October 2026. A moved end date shows as a delay. Private building sites appear only where they affect traffic or were tendered publicly.
All projects in Vienna → Know of a project that is missing? Tell us
The address in figures
Noise
- Loudest facade (day–evening–night level)
- road 60–64 dB
- Quiet side
- yes
Getting around
- Public transport class
- A
- Nearest stop
- Wien Am Tabor, 2 min walk, every 3 min
- Frequent service (every 10 min or more often)
- Wien Am Tabor, 2 min walk, every 3 min
On foot
- Supermarket
- 2 min
- Pharmacy
- 2 min
- Doctor's practice
- 2 min
- Crèche
- 2 min
- Kindergarten
- 2 min
- Primary school
- 2 min
- Middle school
- 3 min
- Playground
- 3 min
Green and air
- Green and open land within 300 m
- 22 %
- Nearest park
- Augarten, 2 min walk
- Nearest forest
- unnamed, 5 min walk
- NO₂ / PM2.5, modelled 2022
- 28.9 / 11.6 µg/m³
- Heat days per year, now → around 2050
- –
Hazards and rules
- Flooding
- outside mapped flood areas
- Zoning
- residential
- Protection zones
- outside all zones
Residents
- Residents within 300 m
- 5,754 · more densely populated than most of Vienna
- Who lives in the neighbourhood
- a typical age mix for Vienna
Prices
- Apartments, average €/m² by building age
- € 4,603–6,369 (the Leopoldstadt district)
The full report explains every figure, chapter by chapter, with what to check before you sign →
Sources: BEV cadastre and address register, Stadt Wien OGD (zoning, flood and protection zones, facility registers), BMLUK noise and flood maps, WLV hazard zones, ÖROK ÖV-Güteklassen 2025, European Environment Agency, Statistik Austria, © OpenStreetMap contributors. CC BY 4.0 / ODbL. Lagecheck processed the data. All sources and licences →