Your address

Liniengasse 50 - 52

1060 Wien · 6. Mariahilf

The outline marks the neighbourhood Liniengasse area, with 80 addresses.worksplannedzoning change · projects nearby

The LAGE score

This building

Good · better than 70 % of all addresses in Vienna

The neighbourhood

Liniengasse area · Fair · Vienna average: 65.

ScoreThis buildingNeighbourhoodVienna
LQuietness 87 7587
LAir quality 46 4646
APublic transport 100 10090
GGreen space 41 3853
GNatural hazards 100 100100
EEveryday amenities 100 10097

0–100, higher is better. The neighbourhood and city columns show the average score of all their addresses, scored with the same rules.

LAGE stands for Lärm & Luft (noise & air) · Anbindung (transport links) · Grün & Gefahren (green & hazards) · Erledigungen (everyday errands). How it is calculated →

Set your priorities to see your own LAGE for this building →

The neighbourhood in figures

Loud road facade (≥ 65 dB Lden)
20 % of addresses
Free of mapped noise ≥ 55 dB at the building
1 %
Inside a 30- or 100-year flood area
0 %
Public transport class A or B
100 %
Green & open land within 300 m (average)
6 %
Distance to the nearest park or forest (average)
237 m
Residents
1,764 · more densely populated than most of Vienna
The neighbourhood report →

Building works and projects nearby

This address lies beyond the reach of every construction site, zoning change and planned line. 12 more projects within 1 km.

Further away, within 1 km (12)
  • Building Generalunternehmerleistungen für die Generalsanierung einer Schule in der Mittelgasse 24 / Spalowskygasse 5, 1060 Wien; Zusatzleistungen hinsichtlich eines Dachausbaus
    154 m Contract awarded 4 November 2024 Source: TED (EU tenders) · checked 10 October 2026· Found automatically. Check with the source.
  • Building MOLL - Mollardgasse 87 - brandschutztechnische Verbesserungsmaßnahmen - Gewerk Baumeister
    258 m Contract awarded 24 October 2024 Source: Kerndaten (public tenders) · 9 records · checked 10 October 2026· Found automatically. Check with the source.
    History (9)
    1. award published (Kerndaten)
    2. award published (Kerndaten)
    3. award published (Kerndaten)
    4. award published (Kerndaten)
    5. award published (Kerndaten)
    6. award published (Kerndaten)
    7. award published (Kerndaten)
    8. award published (Kerndaten)
  • Zoning change Plandokument 8414: Gebiet zwischen Ullmannstraße, Karl-Walther-Gasse, Graumanngasse und Pfeiffergasse
    337 m Zoning in progress 18 May 2026 Source: data.gv.at (information requests) · checked 10 October 2026
  • Building KH BHS - MR - Baumeister
    462 m Tendered · contract period 1 March 2027 – 30 June 2028 Source: TED (EU tenders) · 3 records · checked 10 October 2026· Found automatically. Check with the source.
    History (3)
    1. tender published (TED 523155-2026)
    2. tender published (TED 523852-2026)
    3. tender published (TED 525201-2026)
  • Roads and bridges Mariahilfer Straße von Linzer Straße und Anschützgasse und Zollernsperggasse bis Sperrgasse und Talg road works
    510 m Under construction · works since 13 April 2026, planned until 30 April 2027 Source: Stadt Wien, TED (EU tenders), Kerndaten (public tenders) · 30 records · checked 16 October 2026
    History (10)
    1. award published (Kerndaten)
    2. tender published (TED 862003-2025)
    3. tender published (TED 247267-2026)
    4. award published (TED 256589-2026)
    5. award published (Kerndaten)
    6. award published (Kerndaten)
    7. award published (TED 552509-2026)
    8. listed by the city
  • Building 1060 Wien, Webg. 2a - Sanierung, Bestandssanierung, Generalsanierung ME 4 / Top 10
    624 m Contract awarded 16 June 2025 Source: Kerndaten (public tenders) · checked 10 October 2026· Found automatically. Check with the source.
  • Building 07., Apollogasse
    743 m Planned · developer competition 2020 · 159 flats Source: Stadt Wien · checked 16 October 2026
  • Building 1150 Wien Avedikstr - Tausch von ca 85 lfm Fernheizleitungen - Tiefbauarbeiten und Fernheizleitungstausch
    824 m Contract awarded 19 September 2025 Source: Kerndaten (public tenders) · checked 10 October 2026· Found automatically. Check with the source.
  • Public transport U-Bahn-Linie U2, Bauabschnitte U2/17-U2/21; Konstruktiver Ingenieurbau, Tunnelbau, Gleisbau
    864 m Contract awarded 16 September 2025 · part of U2, 4. Ausbauphase Source: TED (EU tenders) · 7 records · checked 10 October 2026· Found automatically. Check with the source.
    History (7)
    1. tender published (TED 116012-2019)
    2. notice changed (TED 142519-2019)
    3. award published (TED 28914-2021)
    4. award published (TED 21980-2022)
    5. award published (TED 239588-2022)
    6. award published (TED 606170-2022)
    7. award published (TED 680150-2025)
  • Building Mein Gesundheitszentrum Neubau - Teil-Generalunternehmer Rohbau
    923 m Tendered · contract period 15 September 2026 – 4 December 2030 Source: TED (EU tenders) · 6 records · checked 16 October 2026· Found automatically. Check with the source.
    History (6)
    1. tender published (TED 465942-2026)
    2. tender published (TED 487766-2026)
    3. tender published (TED 490200-2026)
    4. tender published (TED 496163-2026)
    5. tender published (TED 593204-2026)
    6. tender published (TED 704637-2026)
  • Zoning change Bacherplatz
    954 m Zoning in progress · draft on public display 14 October 2026 – 25 November 2026; building freeze until 14 May 2027 Source: Stadt Wien · 2 records · checked 16 October 2026
    History (2)
    1. building freeze announced
    2. procedure stage: Öffentliche Auflage
  • Building GU Baumeisterarbeiten, Berufsschule 1120 Wien, Längenfeldgasse 13-15
    986 m Contract awarded · contract period 26 May 2025 – 1 October 2027 Source: TED (EU tenders), Kerndaten (public tenders) · 18 records · checked 10 October 2026· Found automatically. Check with the source.
    History (18)
    1. award published (TED 480164-2025)
    2. award published (Kerndaten)
    3. tender published (TED 58925-2026)
    4. tender published (TED 103387-2026)
    5. award published (TED 317420-2026)
    6. award published (Kerndaten)
    7. award published (TED 329842-2026)
    8. award published (Kerndaten)

From the City of Vienna (construction sites that affect traffic, zoning procedures, building freezes, planned U-Bahn, tram and major roads), public tenders, the Freedom of Information register and environmental impact assessments. We have recorded these sources every day since 10 October 2026. A moved end date shows as a delay. Private building sites appear only where they affect traffic or were tendered publicly.

The address in figures

Noise

Loudest facade (day–evening–night level)
road 55–59 dB, rail 55–59 dB
Quiet side
yes

Getting around

Public transport class
A
Nearest stop
Wien Gumpendorfer Straße, 3 min walk, every 1 min
Frequent service (every 10 min or more often)
Wien Gumpendorfer Straße, 3 min walk, every 1 min

On foot

Supermarket
2 min
Pharmacy
4 min
Doctor's practice
1 min
Crèche
1 min
Kindergarten
1 min
Primary school
4 min
Middle school
4 min
Playground
3 min

Green and air

Green and open land within 300 m
6 %
Nearest park
Fritz-Imhoff-Park, 3 min walk
Nearest forest
–
NO₂ / PM2.5, modelled 2022
26.1 / 11.0 µg/m³
Heat days per year, now → around 2050
–

Hazards and rules

Flooding
outside mapped flood areas
Zoning
residential
Protection zones
outside all zones

Residents

Residents within 300 m
6,669 · more densely populated than most of Vienna
Who lives in the neighbourhood
fewer children

Prices

Apartments, average €/m² by building age
€ 4,708–5,445 (the Mariahilf district)

The full report explains every figure, chapter by chapter, with what to check before you sign →

Sources: BEV cadastre and address register, Stadt Wien OGD (zoning, flood and protection zones, facility registers), BMLUK noise and flood maps, WLV hazard zones, ÖROK ÖV-Güteklassen 2025, European Environment Agency, Statistik Austria, © OpenStreetMap contributors. CC BY 4.0 / ODbL. Lagecheck processed the data. All sources and licences →