Your address

Linzer Straße 237A

1140 Wien · 14. Penzing

The outline marks the neighbourhood Linzer Straße / Zehetnergasse area, with 54 addresses.worksplannedzoning change · projects nearby

The LAGE score

This building

Modest · better than 20 % of all addresses in Vienna

The neighbourhood

Linzer Straße / Zehetnergasse area · Weak · Vienna average: 65.

ScoreThis buildingNeighbourhoodVienna
LQuietness 17 1787
LAir quality 42 2446
APublic transport 90 9090
GGreen space 54 5453
GNatural hazards 100 100100
EEveryday amenities 97 9797

0–100, higher is better. The neighbourhood and city columns show the average score of all their addresses, scored with the same rules.

LAGE stands for Lärm & Luft (noise & air) · Anbindung (transport links) · Grün & Gefahren (green & hazards) · Erledigungen (everyday errands). How it is calculated →

Set your priorities to see your own LAGE for this building →

The neighbourhood in figures

Loud road facade (≥ 65 dB Lden)
89 % of addresses
Free of mapped noise ≥ 55 dB at the building
0 %
Inside a 30- or 100-year flood area
0 %
Public transport class A or B
98 %
Green & open land within 300 m (average)
12 %
Distance to the nearest park or forest (average)
110 m
Residents
975 · more densely populated than most of Vienna
The neighbourhood report →

Building works and projects nearby

1 project reaches this address. 11 more projects within 1 km.

Works and changes that reach this address

Further away, within 1 km (11)
  • Pipes and cables Hadikgasse von ggü. 162 bis ggü. 172 sewer works
    360 m Under construction · works since 22 June 2025, planned until 31 December 2027 Source: Stadt Wien · 7 records · checked 16 October 2026
  • Building Bauträgerwettbewerb für Baugruppen
    406 m Planned · developer competition 2020 Source: Stadt Wien · checked 16 October 2026
  • Building Stadt Wien - Wiener Wohnen - 14., Hütteldorfer Straße 268-274 - Baumeister
    427 m Contract awarded · contract period 23 July 2024 – 28 September 2028 · end moved 1436 days later since first listed Source: TED (EU tenders) · 24 records · checked 10 October 2026· Found automatically. Check with the source.
    History (24)
    1. award published (TED 468738-2026)
    2. award published (TED 470183-2026)
    3. award published (TED 470239-2026)
    4. award published (TED 470297-2026)
    5. award published (TED 470525-2026)
    6. award published (TED 471319-2026)
    7. award published (TED 471674-2026)
    8. award published (TED 509727-2026)
  • Zoning change Plandokument 8436: Gebiet zwischen Hietzinger Kai, Fleschgasse, Auhofstraße und St.-Veit-Gasse
    526 m Zoning in progress 25 November 2025 Source: data.gv.at (information requests) · checked 10 October 2026
  • Roads and bridges (ProVia-ID 131281) Attraktivierung der Verbindungsbahn; Baumeisterarbeiten Baulos Mitte
    653 m Contract awarded · contract period 8 September 2025 – 10 May 2030 Source: TED (EU tenders) · 8 records · checked 10 October 2026· Found automatically. Check with the source.
    History (8)
    1. tender published (TED 128478-2025)
    2. tender published (TED 227365-2025)
    3. award published (TED 542988-2025)
    4. tender published (TED 56300-2026)
    5. tender published (TED 77108-2026)
    6. tender published (TED 183076-2026)
    7. tender published (TED 211874-2026)
    8. award published (TED 592567-2026)
  • Building Bildungsdirektion für Wien - Teil-Generalunternehmerarbeiten für WC-Gruppen Sanierung in 1140 Wien, Linzerstraße 146
    695 m Contract awarded 8 June 2026 Source: Kerndaten (public tenders) · 5 records · checked 10 October 2026· Found automatically. Check with the source.
    History (5)
    1. award published (Kerndaten)
    2. award published (Kerndaten)
    3. award published (Kerndaten)
    4. award published (Kerndaten)
    5. award published (Kerndaten)
  • Building Teil-GU Baumeisterarbeiten: Lüftungsanlage und NSHV Pav.3 Mein Hanusch-Krankenhaus, Heinrich-Collin-Straße 30,1140 Wien
    712 m Contract awarded 7 November 2024 Source: Kerndaten (public tenders) · 24 records · checked 10 October 2026· Found automatically. Check with the source.
    History (24)
    1. award published (Kerndaten)
    2. award published (Kerndaten)
    3. award published (Kerndaten)
    4. award published (Kerndaten)
    5. award published (Kerndaten)
    6. award published (Kerndaten)
    7. award published (Kerndaten)
    8. award published (Kerndaten)
  • Zoning change Hackinger Straße
    718 m Zoning in progress · building freeze since 7 May 2025 Source: Stadt Wien · checked 16 October 2026
  • Pipes and cables V15 Wientalquerung Düker 1. HL, 13., Preindlgasse 35
    749 m Tendered · contract period 20 July 2026 – 20 December 2026 Source: TED (EU tenders) · checked 10 October 2026· Found automatically. Check with the source.
  • Pipes and cables Hietzinger Kai Kreuzung Braunschweiggasse water main works
    823 m Under construction · works since 11 October 2026, planned until 27 November 2026 Source: Stadt Wien · 7 records · checked 16 October 2026
  • Pipes and cables Hietzinger Kai Kreuzung Hietzinger Kai und Braunschweiggasse sewer works
    823 m Under construction · works since 29 July 2026, planned until 13 November 2026 Source: Stadt Wien · 7 records · checked 16 October 2026

From the City of Vienna (construction sites that affect traffic, zoning procedures, building freezes, planned U-Bahn, tram and major roads), public tenders, the Freedom of Information register and environmental impact assessments. We have recorded these sources every day since 10 October 2026. A moved end date shows as a delay. Private building sites appear only where they affect traffic or were tendered publicly.

The address in figures

Noise

Loudest facade (day–evening–night level)
road 70–74 dB, rail 60–64 dB
Quiet side
yes

Getting around

Public transport class
B
Nearest stop
Wien Zehetnergasse, 1 min walk, every 5 min
Frequent service (every 10 min or more often)
Wien Zehetnergasse, 1 min walk, every 5 min

On foot

Supermarket
2 min
Pharmacy
4 min
Doctor's practice
3 min
Crèche
5 min
Kindergarten
5 min
Primary school
5 min
Middle school
15 min
Playground
3 min

Green and air

Green and open land within 300 m
12 %
Nearest park
Gustav-Klimt-Park, 1 min walk
Nearest forest
–
NO₂ / PM2.5, modelled 2022
27.4 / 11.6 µg/m³
Heat days per year, now → around 2050
–

Hazards and rules

Flooding
outside mapped flood areas
Zoning
core / mixed use
Protection zones
outside all zones

Residents

Residents within 300 m
3,320 · about as densely populated as most of Vienna
Who lives in the neighbourhood
younger residents than in most of Vienna; more people between 15 and 29; fewer children and older people

Prices

Apartments, average €/m² by building age
€ 3,694–5,796 (the Penzing district)

The full report explains every figure, chapter by chapter, with what to check before you sign →

Sources: BEV cadastre and address register, Stadt Wien OGD (zoning, flood and protection zones, facility registers), BMLUK noise and flood maps, WLV hazard zones, ÖROK ÖV-Güteklassen 2025, European Environment Agency, Statistik Austria, © OpenStreetMap contributors. CC BY 4.0 / ODbL. Lagecheck processed the data. All sources and licences →