Your address
Margaretenplatz 9
1050 Wien · 5. Margareten
The LAGE score
This building
Weak · better than 17 % of all addresses in Vienna
The neighbourhood
Schönbrunner Straße / Strobachgasse area · Weak · Vienna average: 65.
| Score | This building | Neighbourhood | Vienna |
|---|---|---|---|
| LQuietness | 17 | 17 | 87 |
| LAir quality | 34 | 34 | 46 |
| APublic transport | 100 | 100 | 90 |
| GGreen space | 49 | 47 | 53 |
| GNatural hazards | 100 | 100 | 100 |
| EEveryday amenities | 100 | 100 | 97 |
0–100, higher is better. The neighbourhood and city columns show the average score of all their addresses, scored with the same rules.
LAGE stands for Lärm & Luft (noise & air) · Anbindung (transport links) · Grün & Gefahren (green & hazards) · Erledigungen (everyday errands). How it is calculated →
Set your priorities to see your own LAGE for this building →
The neighbourhood in figures
- Loud road facade (≥ 65 dB Lden)
- 69 % of addresses
- Free of mapped noise ≥ 55 dB at the building
- 2 %
- Inside a 30- or 100-year flood area
- 0 %
- Public transport class A or B
- 100 %
- Green & open land within 300 m (average)
- 9 %
- Distance to the nearest park or forest (average)
- 170 m
- Protection zone (Schutzzone)
- 61 %
- Residents
- 843 · more densely populated than most of Vienna
Building works and projects nearby
1 new station is planned within walking distance. 12 more projects within 1 km.
New stations nearby
-
Public transport New station Pilgramgasse (U2)348 m U2, 4. Ausbauphase · Under construction · opening planned for 2030 Source: Stadt Wien · 42 records · checked 16 October 2026
Further away, within 1 km (12)
-
Zoning change Bacherplatz221 m Zoning in progress · draft on public display 14 October 2026 – 25 November 2026; building freeze until 14 May 2027 Source: Stadt Wien · 2 records · checked 16 October 2026
History (2)
- building freeze announced
- procedure stage: Öffentliche Auflage
-
Pipes and cables Zentagasse 22 bis 46 pipe laying273 m Under construction · works since 31 August 2026, planned until 30 October 2026 Source: Stadt Wien · 7 records · checked 16 October 2026
-
Public transport Rechte Wienzeile von Kreuzung Ramperstorffergasse bis Kreuzung Pilgramgasse und Pilgrambrücke U-Bahn construction303 m Under construction · works since 28 February 2021, planned until 31 May 2028 · part of U2, 4. Ausbauphase Source: Stadt Wien, TED (EU tenders) · 10 records · checked 16 October 2026
History (4)
- award published (TED 475971-2022)
- tender published (TED 829936-2025)
- tender published (TED 585716-2026)
- listed by the city
-
Zoning change Plandokument 8489: Gebiet zwischen Castelligasse, Gartengasse, Linienzug 1-3, Linienzug 3-4 (Viktor-Christ-Gasse) und Zentagasse326 m Zoning in progress 8 June 2026 Source: data.gv.at (information requests) · checked 10 October 2026
-
Public transport U-Bahn-Linie U2, Bauabschnitte U2/17-U2/21; Konstruktiver Ingenieurbau, Tunnelbau, Gleisbau408 m Contract awarded 16 September 2025 · part of U2, 4. Ausbauphase Source: TED (EU tenders) · 7 records · checked 10 October 2026· Found automatically. Check with the source.
History (7)
- tender published (TED 116012-2019)
- notice changed (TED 142519-2019)
- award published (TED 28914-2021)
- award published (TED 21980-2022)
- award published (TED 239588-2022)
- award published (TED 606170-2022)
- award published (TED 680150-2025)
-
Pipes and cables Linke Wienzeile 90-92 sewer works474 m Under construction · works since 19 May 2026, planned until 18 December 2026 Source: Stadt Wien · 7 records · checked 16 October 2026
-
Building Stadt Wien - Wiener Wohnen - 04., Preßgasse 7 - Baumeister479 m Contract awarded 27 November 2025 Source: Kerndaten (public tenders) · 10 records · checked 10 October 2026· Found automatically. Check with the source.
History (10)
- award published (Kerndaten)
- award published (Kerndaten)
- award published (Kerndaten)
- award published (Kerndaten)
- award published (Kerndaten)
- award published (Kerndaten)
- award published (Kerndaten)
- award published (Kerndaten)
-
Building Naschmarkt – Ost – Marktraum vorbereitende Maßnahmen Bauphase 1A546 m Tendered · contract period 23 October 2024 – 21 February 2027 Source: TED (EU tenders) · 4 records · checked 10 October 2026· Found automatically. Check with the source.
History (4)
- tender published (TED 512553-2024)
- tender published (TED 661131-2024)
- tender published (TED 718666-2024)
- tender published (TED 513099-2026)
-
Building WWSPEN-Wohnhaus Spengergasse 45 - Totalsanierung – Umbau und Aufstockung - Generalunternehmer575 m Contract awarded · contract period 27 March 2025 – 15 February 2027 Source: TED (EU tenders), Kerndaten (public tenders) · 3 records · checked 10 October 2026· Found automatically. Check with the source.
History (3)
- tender published (TED 636999-2024)
- award published (TED 210517-2025)
- award published (Kerndaten)
-
Public transport Bacherplatz von Arbeitergasse bis Schwarzhorngasse U-Bahn construction615 m Under construction · works since 28 February 2021, planned until 31 December 2028 · part of U2, 4. Ausbauphase Source: Stadt Wien · 7 records · checked 16 October 2026
-
Building 04., Rechte Wienzeile 25-27683 m Contract awarded · contract period 15 March 2025 – 2 April 2028 · end moved 47 days later since first listed Source: TED (EU tenders) · 24 records · checked 10 October 2026· Found automatically. Check with the source.
History (24)
- award published (TED 149259-2025)
- award published (TED 187214-2025)
- tender published (TED 239094-2025)
- award published (TED 269220-2025)
- award published (TED 321786-2025)
- tender published (TED 471650-2025)
- award published (TED 535946-2025)
- award published (TED 34015-2026)
-
Public transport Siebenbrunnengasse von Kreuzung Siebenbrunnenplatz und Reinprechtsdorfer Straße bis 44 U-Bahn construction723 m Under construction · works since 28 February 2021, planned until 31 December 2026 · part of U2, 4. Ausbauphase Source: Stadt Wien · 7 records · checked 16 October 2026
From the City of Vienna (construction sites that affect traffic, zoning procedures, building freezes, planned U-Bahn, tram and major roads), public tenders, the Freedom of Information register and environmental impact assessments. We have recorded these sources every day since 10 October 2026. A moved end date shows as a delay. Private building sites appear only where they affect traffic or were tendered publicly.
All projects in Vienna → Know of a project that is missing? Tell us
The address in figures
Noise
- Loudest facade (day–evening–night level)
- road 70–74 dB
- Quiet side
- yes
Getting around
- Public transport class
- A
- Nearest stop
- Wien Ziegelofengasse, 2 min walk, every 4 min
- Frequent service (every 10 min or more often)
- Wien Ziegelofengasse, 2 min walk, every 4 min
On foot
- Supermarket
- 1 min
- Pharmacy
- 1 min
- Doctor's practice
- 1 min
- Crèche
- 2 min
- Kindergarten
- 2 min
- Primary school
- 8 min
- Middle school
- 7 min
- Playground
- 2 min
Green and air
- Green and open land within 300 m
- 11 %
- Nearest park
- Willi-Frank-Park, 3 min walk
- Nearest forest
- –
- NO₂ / PM2.5, modelled 2022
- 29.7 / 11.7 µg/m³
- Heat days per year, now → around 2050
- –
Hazards and rules
- Flooding
- outside mapped flood areas
- Zoning
- residential
- Protection zones
- old-town zone
Residents
- Residents within 300 m
- 6,080 · more densely populated than most of Vienna
- Who lives in the neighbourhood
- fewer children
Prices
- Apartments, average €/m² by building age
- € 4,325–5,370 (the Margareten district)
The full report explains every figure, chapter by chapter, with what to check before you sign →
Sources: BEV cadastre and address register, Stadt Wien OGD (zoning, flood and protection zones, facility registers), BMLUK noise and flood maps, WLV hazard zones, ÖROK ÖV-Güteklassen 2025, European Environment Agency, Statistik Austria, © OpenStreetMap contributors. CC BY 4.0 / ODbL. Lagecheck processed the data. All sources and licences →