Your address

Mauthnergasse 4

1090 Wien · 9. Alsergrund

The outline marks the neighbourhood Kinderspitalgasse area, with 80 addresses.worksplannedzoning change · projects nearby

The LAGE score

This building

Modest · better than 33 % of all addresses in Vienna

The neighbourhood

Kinderspitalgasse area · Weak · Vienna average: 65.

ScoreThis buildingNeighbourhoodVienna
LQuietness 67 1787
LAir quality 27 2746
APublic transport 100 10090
GGreen space 38 3153
GNatural hazards 100 100100
EEveryday amenities 100 10097

0–100, higher is better. The neighbourhood and city columns show the average score of all their addresses, scored with the same rules.

LAGE stands for Lärm & Luft (noise & air) · Anbindung (transport links) · Grün & Gefahren (green & hazards) · Erledigungen (everyday errands). How it is calculated →

Set your priorities to see your own LAGE for this building →

The neighbourhood in figures

Loud road facade (≥ 65 dB Lden)
85 % of addresses
Free of mapped noise ≥ 55 dB at the building
0 %
Inside a 30- or 100-year flood area
0 %
Public transport class A or B
100 %
Green & open land within 300 m (average)
2 %
Distance to the nearest park or forest (average)
290 m
Protection zone (Schutzzone)
34 %
Residents
842 · more densely populated than most of Vienna
The neighbourhood report →

Building works and projects nearby

This address lies beyond the reach of every construction site, zoning change and planned line. 12 more projects within 1 km.

Further away, within 1 km (12)
  • Roads and bridges Albertgasse von Kreuzung Josef-Matthias-Hauer-Platz und Josefstädter Straße bis Kreuzung Florianigas road works
    129 m Under construction · works since 12 October 2026, planned until 1 September 2027 Source: Stadt Wien · 14 records · checked 16 October 2026
  • Building Florianigasse 2- 210 Baumeisterarbeiten
    387 m Contract awarded · contract period 23 March 2026 – 23 January 2028 Source: TED (EU tenders) · 20 records · checked 10 October 2026· Found automatically. Check with the source.
    History (20)
    1. award published (TED 126123-2026)
    2. award published (TED 126473-2026)
    3. award published (TED 126642-2026)
    4. award published (TED 191101-2026)
    5. award published (TED 192384-2026)
    6. award published (TED 278223-2026)
    7. award published (TED 278477-2026)
    8. award published (TED 278637-2026)
  • Building Baumeisterarbeiten (Raumbereitstellung für das Arbeitsmedizinische Zentrum, Fenstersanierung, Brandschutz, WADG und IKT), Amtshaus 1080 Wien, Schlesingerplatz 2-4
    390 m Contract awarded · contract period 4 December 2023 – 31 March 2028 · end moved 238 days later since first listed Source: TED (EU tenders), Kerndaten (public tenders) · 56 records · checked 10 October 2026· Found automatically. Check with the source.
    History (56)
    1. award published (Kerndaten)
    2. award published (TED 543608-2025)
    3. award published (Kerndaten)
    4. award published (TED 611483-2025)
    5. award published (Kerndaten)
    6. tender published (TED 42642-2026)
    7. award published (TED 221985-2026)
    8. award published (Kerndaten)
  • Building 1080 Wien, Laudongasse 15-19, Sanierung des Palais Schönborn (VKM WIEN) - Mauerwerkstrockenlegung und Abbruch inkl. TGA-Anteil
    483 m Contract awarded · contract period 16 January 2025 – 31 October 2026 · end moved 219 days later since first listed Source: TED (EU tenders), Kerndaten (public tenders) · 27 records · checked 10 October 2026· Found automatically. Check with the source.
    History (27)
    1. award published (TED 420996-2025)
    2. tender published (TED 428933-2025)
    3. award published (Kerndaten)
    4. award published (TED 2989-2026)
    5. award published (Kerndaten)
    6. award published (Kerndaten)
    7. award published (TED 646469-2026)
    8. award published (TED 648130-2026)
  • Public transport U5, 5. Ausbauphase
    499 m Planned · opening planned for 2035 Source: Stadt Wien · 42 records · checked 16 October 2026
  • Pipes and cables Martinstraße von Kreuzung Leo-Slezak-Gasse bis Kreuzung Blumengasse pipe laying
    512 m Under construction · works since 5 October 2026, planned until 18 December 2026 Source: Stadt Wien · 7 records · checked 16 October 2026
  • Building Baumeisterarbeiten, Schule 1180 Wien, Klettenhofergasse 3
    541 m Contract awarded 26 May 2026 Source: data.gv.at (information requests) · checked 10 October 2026· Found automatically. Check with the source.
  • Building 25-011.843 Campus Quantum Cube – 02a Rohbau STB Hülle dicht
    583 m Contract awarded · contract period 28 May 2026 – 22 December 2027 Source: TED (EU tenders) · 2 records · checked 10 October 2026· Found automatically. Check with the source.
    History (2)
    1. tender published (TED 248273-2026)
    2. award published (TED 563058-2026)
  • Building 1090 Wien, Sensengasse 2a-Universitätszahnklinik Wien - Schaden Akustikdecke- Baumeisterarbeiten
    658 m Contract awarded 26 May 2026 Source: Kerndaten (public tenders) · 16 records · checked 10 October 2026· Found automatically. Check with the source.
    History (16)
    1. award published (Kerndaten)
    2. award published (Kerndaten)
    3. award published (Kerndaten)
    4. award published (Kerndaten)
    5. award published (Kerndaten)
    6. award published (Kerndaten)
    7. award published (Kerndaten)
    8. award published (Kerndaten)
  • Building 1080 Wien, Landesgerichtsstraße 9a-11 und Wickenburggasse 18-20, Funktions- und Bestandssanierung des Justizzentrums für Strafsachen Wien, Baumeisterarbeiten, Teil-GU
    681 m Contract awarded 22 July 2026 Source: Kerndaten (public tenders) · 39 records · checked 10 October 2026· Found automatically. Check with the source.
    History (39)
    1. award published (Kerndaten)
    2. award published (Kerndaten)
    3. award published (Kerndaten)
    4. award published (Kerndaten)
    5. award published (Kerndaten)
    6. award published (Kerndaten)
    7. award published (Kerndaten)
    8. award published (Kerndaten)
  • Building 08., Schlösselgasse 14 - Baumeisterarbeiten
    693 m Contract awarded · contract period 15 June 2026 – 15 August 2029 · end moved 338 days later since first listed Source: TED (EU tenders), Kerndaten (public tenders) · 22 records · checked 16 October 2026· Found automatically. Check with the source.
    History (22)
    1. tender published (TED 132388-2026)
    2. tender published (TED 133526-2026)
    3. tender published (TED 136073-2026)
    4. tender published (TED 144892-2026)
    5. tender published (TED 672752-2026)
    6. award published (Kerndaten)
    7. tender published (Kerndaten)
    8. award published (TED 703150-2026)
  • Building 1090 Wien, Michelbeuerngasse 6-10, HLMW 9, Abbrucharbeiten
    764 m Contract awarded 24 September 2025 Source: Kerndaten (public tenders) · 10 records · checked 10 October 2026· Found automatically. Check with the source.
    History (10)
    1. award published (Kerndaten)
    2. award published (Kerndaten)
    3. award published (Kerndaten)
    4. award published (Kerndaten)
    5. award published (Kerndaten)
    6. award published (Kerndaten)
    7. award published (Kerndaten)
    8. award published (Kerndaten)

From the City of Vienna (construction sites that affect traffic, zoning procedures, building freezes, planned U-Bahn, tram and major roads), public tenders, the Freedom of Information register and environmental impact assessments. We have recorded these sources every day since 10 October 2026. A moved end date shows as a delay. Private building sites appear only where they affect traffic or were tendered publicly.

The address in figures

Noise

Loudest facade (day–evening–night level)
road 60–64 dB, rail 55–59 dB
Quiet side
yes

Getting around

Public transport class
A
Nearest stop
Wien Brünnlbadgasse, 1 min walk, every 3 min
Frequent service (every 10 min or more often)
Wien Brünnlbadgasse, 1 min walk, every 3 min

On foot

Supermarket
1 min
Pharmacy
2 min
Doctor's practice
1 min
Crèche
5 min
Kindergarten
3 min
Primary school
2 min
Middle school
10 min
Playground
2 min

Green and air

Green and open land within 300 m
3 %
Nearest park
Gerda-Matejka-Felden-Park, 2 min walk
Nearest forest
–
NO₂ / PM2.5, modelled 2022
23.1 / 11.3 µg/m³
Heat days per year, now → around 2050
–

Hazards and rules

Flooding
outside mapped flood areas
Zoning
residential
Protection zones
outside all zones

Residents

Residents within 300 m
5,516 · more densely populated than most of Vienna
Who lives in the neighbourhood
younger residents than in most of Vienna; more people between 15 and 29; fewer older people

Prices

Apartments, average €/m² by building age
€ 4,750–6,404 (the Alsergrund district)

The full report explains every figure, chapter by chapter, with what to check before you sign →

Sources: BEV cadastre and address register, Stadt Wien OGD (zoning, flood and protection zones, facility registers), BMLUK noise and flood maps, WLV hazard zones, ÖROK ÖV-Güteklassen 2025, European Environment Agency, Statistik Austria, © OpenStreetMap contributors. CC BY 4.0 / ODbL. Lagecheck processed the data. All sources and licences →