Your address

Maxingstraße 60

1130 Wien · 13. Hietzing

The outline marks the neighbourhood Volkgasse area, with 70 addresses.worksplannedzoning change · projects nearby

The LAGE score

This building

Fair · better than 41 % of all addresses in Vienna

The neighbourhood

Volkgasse area · Good · Vienna average: 65.

ScoreThis buildingNeighbourhoodVienna
LQuietness 32 8787
LAir quality 43 4346
APublic transport 90 9090
GGreen space 94 6953
GNatural hazards 100 100100
EEveryday amenities 79 7997

0–100, higher is better. The neighbourhood and city columns show the average score of all their addresses, scored with the same rules.

LAGE stands for Lärm & Luft (noise & air) · Anbindung (transport links) · Grün & Gefahren (green & hazards) · Erledigungen (everyday errands). How it is calculated →

Set your priorities to see your own LAGE for this building →

The neighbourhood in figures

Loud road facade (≥ 65 dB Lden)
20 % of addresses
Free of mapped noise ≥ 55 dB at the building
19 %
Inside a 30- or 100-year flood area
0 %
Public transport class A or B
94 %
Green & open land within 300 m (average)
26 %
Distance to the nearest park or forest (average)
247 m
Residents
1,022 · about as densely populated as most of Vienna
The neighbourhood report →

Building works and projects nearby

1 project reaches this address. 8 more projects within 1 km.

Works and changes that reach this address

Further away, within 1 km (8)
  • Pipes and cables Maxingstraße von Kreuzung Hanselmayergasse bis Kreuzung Trauttmansdorffgasse pipe laying
    85 m Under construction · works since 6 April 2026, planned until 31 December 2026 Source: Stadt Wien · 7 records · checked 16 October 2026
  • Pipes and cables Montecuccoliplatz ggü. 12 bis Ende des Gustav-Zelibor-Park pipe laying
    152 m Under construction · works since 1 February 2026, planned until 31 December 2026 Source: Stadt Wien · 7 records · checked 16 October 2026
  • Building Stadt Wien - Wiener Wohnen - 13., Elisabethallee 79 - BAUMEISTER
    222 m Contract awarded · contract period 15 April 2024 – 15 January 2029 · end moved 984 days later since first listed Source: TED (EU tenders), Kerndaten (public tenders) · 51 records · checked 16 October 2026· Found automatically. Check with the source.
    History (51)
    1. award published (Kerndaten)
    2. award published (Kerndaten)
    3. award published (Kerndaten)
    4. award published (TED 439912-2025)
    5. tender published (TED 634444-2026)
    6. award published (Kerndaten)
    7. tender published (Kerndaten)
    8. tender published (TED 714566-2026)
  • Public transport Attraktivierung der Verbindungsbahn (ÖBB-Strecke 12201 Wien Hütteldorf - Wien Praterstern, ÖBB-Strecke 12101 Wien Penzing - Abzweigung Hütteldorf, ÖBB-Strecke 10615 Wien Maxing - Wien Matzleinsdorf-Altmannsdorf)
    666 m Approval pending Source: Umweltbundesamt (environmental impact assessment) · checked 16 October 2026 · route © OpenStreetMap contributors
  • Public transport Gleissanierungsoffensive Lainzer Straße 2-94, 1130 Wien, Gleisbau (Wiener Linien) und Straßenbau (MA 28)
    775 m Tendered · contract period 22 February 2027 – 22 December 2027 Source: TED (EU tenders) · checked 16 October 2026· Found automatically. Check with the source.
  • Pipes and cables Lainzer Straße von Hietzinger Hauptstraße und Altgasse bis Stadlergasse pipe laying
    776 m Under construction · works since 24 August 2026, planned until 26 March 2027 Source: Stadt Wien · 7 records · checked 16 October 2026
  • Pipes and cables Wien 13., Lainzer Straße von Altgasse bis Stadlergasse - Wasserrohrauswechslungen - Generalunternehmer
    784 m Contract awarded 10 September 2026 Source: data.gv.at (information requests) · checked 10 October 2026· Found automatically. Check with the source.
  • Zoning change Plandokument 8381: Gebiet zwischen Hummelgasse, Veitingergasse, Lainzer Straße, Jagdschloßgasse, Steinlechnergasse, Versorgungsheimstraße, Linienzug 1-3, Preyer
    942 m Zoning in progress 1 June 2026 Source: data.gv.at (information requests) · checked 10 October 2026

From the City of Vienna (construction sites that affect traffic, zoning procedures, building freezes, planned U-Bahn, tram and major roads), public tenders, the Freedom of Information register and environmental impact assessments. We have recorded these sources every day since 10 October 2026. A moved end date shows as a delay. Private building sites appear only where they affect traffic or were tendered publicly.

The address in figures

Noise

Loudest facade (day–evening–night level)
road 65–69 dB
Quiet side
yes

Getting around

Public transport class
B
Nearest stop
Wien Montecuccoliplatz, 3 min walk, every 2 min
Frequent service (every 10 min or more often)
Wien Montecuccoliplatz, 3 min walk, every 2 min

On foot

Supermarket
4 min
Pharmacy
15 min
Doctor's practice
4 min
Crèche
6 min
Kindergarten
3 min
Primary school
15 min
Middle school
19 min
Playground
4 min

Green and air

Green and open land within 300 m
47 %
Nearest park
Maxingpark, 2 min walk
Nearest forest
unnamed, 4 min walk
NO₂ / PM2.5, modelled 2022
27.2 / 12.1 µg/m³
Heat days per year, now → around 2050
–

Hazards and rules

Flooding
outside mapped flood areas
Zoning
residential
Protection zones
UNESCO World Heritage

Residents

Residents within 300 m
1,442 · about as densely populated as most of Vienna
Who lives in the neighbourhood
a typical age mix for Vienna

Prices

Apartments, average €/m² by building age
€ 4,100–5,905 (the Hietzing district)

The full report explains every figure, chapter by chapter, with what to check before you sign →

Sources: BEV cadastre and address register, Stadt Wien OGD (zoning, flood and protection zones, facility registers), BMLUK noise and flood maps, WLV hazard zones, ÖROK ÖV-Güteklassen 2025, European Environment Agency, Statistik Austria, © OpenStreetMap contributors. CC BY 4.0 / ODbL. Lagecheck processed the data. All sources and licences →