Your address
Mollardgasse 27
1060 Wien · 6. Mariahilf
The LAGE score
This building
Modest · better than 26 % of all addresses in Vienna
The neighbourhood
Linke Wienzeile / Mollardgasse area · Weak · Vienna average: 65.
| Score | This building | Neighbourhood | Vienna |
|---|---|---|---|
| LQuietness | 87 | 17 | 87 |
| LAir quality | 16 | 34 | 46 |
| APublic transport | 100 | 100 | 90 |
| GGreen space | 37 | 41 | 53 |
| GNatural hazards | 100 | 85 | 100 |
| EEveryday amenities | 100 | 100 | 97 |
0–100, higher is better. The neighbourhood and city columns show the average score of all their addresses, scored with the same rules.
LAGE stands for Lärm & Luft (noise & air) · Anbindung (transport links) · Grün & Gefahren (green & hazards) · Erledigungen (everyday errands). How it is calculated →
Set your priorities to see your own LAGE for this building →
The neighbourhood in figures
- Loud road facade (≥ 65 dB Lden)
- 69 % of addresses
- Free of mapped noise ≥ 55 dB at the building
- 0 %
- Inside a 30- or 100-year flood area
- 2 %
- Public transport class A or B
- 100 %
- Green & open land within 300 m (average)
- 5 %
- Distance to the nearest park or forest (average)
- 171 m
- Protection zone (Schutzzone)
- 43 %
- Residents
- 1,141 · more densely populated than most of Vienna
Building works and projects nearby
2 projects reach this address. 1 new station is planned within walking distance. 12 more projects within 1 km.
New stations nearby
-
Public transport New station Pilgramgasse (U2)175 m U2, 4. Ausbauphase · Under construction · opening planned for 2030 Source: Stadt Wien · 42 records · checked 16 October 2026
Works and changes that reach this address
-
Public transport U-Bahn-Linie U2, Bauabschnitte U2/17-U2/21; Konstruktiver Ingenieurbau, Tunnelbau, Gleisbau100 m Contract awarded 16 September 2025 · part of U2, 4. Ausbauphase Source: TED (EU tenders) · 7 records · checked 10 October 2026· Found automatically. Check with the source.
History (7)
- tender published (TED 116012-2019)
- notice changed (TED 142519-2019)
- award published (TED 28914-2021)
- award published (TED 21980-2022)
- award published (TED 239588-2022)
- award published (TED 606170-2022)
- award published (TED 680150-2025)
-
Public transport Rechte Wienzeile von Kreuzung Ramperstorffergasse bis Kreuzung Pilgramgasse und Pilgrambrücke U-Bahn construction174 m Under construction · works since 28 February 2021, planned until 31 May 2028 · part of U2, 4. Ausbauphase Source: Stadt Wien, TED (EU tenders) · 10 records · checked 16 October 2026
History (4)
- award published (TED 475971-2022)
- tender published (TED 829936-2025)
- tender published (TED 585716-2026)
- listed by the city
Further away, within 1 km (12)
-
Zoning change Bacherplatz185 m Zoning in progress · draft on public display 14 October 2026 – 25 November 2026; building freeze until 14 May 2027 Source: Stadt Wien · 2 records · checked 16 October 2026
History (2)
- building freeze announced
- procedure stage: Öffentliche Auflage
-
Building 1060 Wien, Webg. 2a - Sanierung, Bestandssanierung, Generalsanierung ME 4 / Top 10300 m Contract awarded 16 June 2025 Source: Kerndaten (public tenders) · checked 10 October 2026· Found automatically. Check with the source.
-
Pipes and cables Linke Wienzeile 90-92 sewer works385 m Under construction · works since 19 May 2026, planned until 18 December 2026 Source: Stadt Wien · 7 records · checked 16 October 2026
-
Building WWSPEN-Wohnhaus Spengergasse 45 - Totalsanierung – Umbau und Aufstockung - Generalunternehmer406 m Contract awarded · contract period 27 March 2025 – 15 February 2027 Source: TED (EU tenders), Kerndaten (public tenders) · 3 records · checked 10 October 2026· Found automatically. Check with the source.
History (3)
- tender published (TED 636999-2024)
- award published (TED 210517-2025)
- award published (Kerndaten)
-
Pipes and cables Zentagasse 22 bis 46 pipe laying431 m Under construction · works since 31 August 2026, planned until 30 October 2026 Source: Stadt Wien · 7 records · checked 16 October 2026
-
Building KH BHS - MR - Baumeister447 m Tendered · contract period 1 March 2027 – 30 June 2028 Source: TED (EU tenders) · 3 records · checked 10 October 2026· Found automatically. Check with the source.
History (3)
- tender published (TED 523155-2026)
- tender published (TED 523852-2026)
- tender published (TED 525201-2026)
-
Zoning change Plandokument 8489: Gebiet zwischen Castelligasse, Gartengasse, Linienzug 1-3, Linienzug 3-4 (Viktor-Christ-Gasse) und Zentagasse529 m Zoning in progress 8 June 2026 Source: data.gv.at (information requests) · checked 10 October 2026
-
Public transport Bacherplatz von Arbeitergasse bis Schwarzhorngasse U-Bahn construction539 m Under construction · works since 28 February 2021, planned until 31 December 2028 · part of U2, 4. Ausbauphase Source: Stadt Wien · 7 records · checked 16 October 2026
-
Building 1060 Wien, Amerlingstraße 6 / Küchenumbau / Baumeisterarbeiten640 m Contract awarded 27 May 2025 Source: Kerndaten (public tenders) · 12 records · checked 10 October 2026· Found automatically. Check with the source.
History (12)
- award published (Kerndaten)
- award published (Kerndaten)
- award published (Kerndaten)
- award published (Kerndaten)
- award published (Kerndaten)
- award published (Kerndaten)
- award published (Kerndaten)
- award published (Kerndaten)
-
Public transport Siebenbrunnengasse von Kreuzung Siebenbrunnenplatz und Reinprechtsdorfer Straße bis 44 U-Bahn construction660 m Under construction · works since 28 February 2021, planned until 31 December 2026 · part of U2, 4. Ausbauphase Source: Stadt Wien · 7 records · checked 16 October 2026
-
Building 1050 Wien, Reinprechtsdorfer Str. 24-26, Baumeister Teil GU, abgehängte Decke, Bauphase 2025 und 2026706 m Contract awarded 8 April 2026 Source: Kerndaten (public tenders) · 10 records · checked 10 October 2026· Found automatically. Check with the source.
History (10)
- award published (Kerndaten)
- award published (Kerndaten)
- award published (Kerndaten)
- award published (Kerndaten)
- award published (Kerndaten)
- award published (Kerndaten)
- award published (Kerndaten)
- award published (Kerndaten)
-
Building MOLL - Mollardgasse 87 - brandschutztechnische Verbesserungsmaßnahmen - Gewerk Baumeister758 m Contract awarded 24 October 2024 Source: Kerndaten (public tenders) · 9 records · checked 10 October 2026· Found automatically. Check with the source.
History (9)
- award published (Kerndaten)
- award published (Kerndaten)
- award published (Kerndaten)
- award published (Kerndaten)
- award published (Kerndaten)
- award published (Kerndaten)
- award published (Kerndaten)
- award published (Kerndaten)
From the City of Vienna (construction sites that affect traffic, zoning procedures, building freezes, planned U-Bahn, tram and major roads), public tenders, the Freedom of Information register and environmental impact assessments. We have recorded these sources every day since 10 October 2026. A moved end date shows as a delay. Private building sites appear only where they affect traffic or were tendered publicly.
All projects in Vienna → Know of a project that is missing? Tell us
The address in figures
Noise
- Loudest facade (day–evening–night level)
- road 55–59 dB
- Quiet side
- yes
Getting around
- Public transport class
- A
- Nearest stop
- Wien Pilgramgasse, 4 min walk, every 1 min
- Frequent service (every 10 min or more often)
- Wien Pilgramgasse, 4 min walk, every 1 min
On foot
- Supermarket
- 4 min
- Pharmacy
- 3 min
- Doctor's practice
- 3 min
- Crèche
- 3 min
- Kindergarten
- 3 min
- Primary school
- 6 min
- Middle school
- 7 min
- Playground
- 4 min
Green and air
- Green and open land within 300 m
- 5 %
- Nearest park
- Scheupark, 4 min walk
- Nearest forest
- –
- NO₂ / PM2.5, modelled 2022
- 35.3 / 11.8 µg/m³
- Heat days per year, now → around 2050
- –
Hazards and rules
- Flooding
- outside mapped flood areas
- Zoning
- core / mixed use
- Protection zones
- outside all zones
Residents
- Residents within 300 m
- 5,870 · more densely populated than most of Vienna
- Who lives in the neighbourhood
- younger residents than in most of Vienna; more people between 15 and 29; fewer children and older people
Prices
- Apartments, average €/m² by building age
- € 4,708–5,445 (the Mariahilf district)
The full report explains every figure, chapter by chapter, with what to check before you sign →
Sources: BEV cadastre and address register, Stadt Wien OGD (zoning, flood and protection zones, facility registers), BMLUK noise and flood maps, WLV hazard zones, ÖROK ÖV-Güteklassen 2025, European Environment Agency, Statistik Austria, © OpenStreetMap contributors. CC BY 4.0 / ODbL. Lagecheck processed the data. All sources and licences →