Your address
Morizgasse 6
1060 Wien · 6. Mariahilf
The LAGE score
This building
Modest · better than 24 % of all addresses in Vienna
The neighbourhood
Dominikanergasse area · Modest · Vienna average: 65.
| Score | This building | Neighbourhood | Vienna |
|---|---|---|---|
| LQuietness | 67 | 67 | 87 |
| LAir quality | 16 | 16 | 46 |
| APublic transport | 100 | 100 | 90 |
| GGreen space | 42 | 39 | 53 |
| GNatural hazards | 100 | 100 | 100 |
| EEveryday amenities | 100 | 100 | 97 |
0–100, higher is better. The neighbourhood and city columns show the average score of all their addresses, scored with the same rules.
LAGE stands for Lärm & Luft (noise & air) · Anbindung (transport links) · Grün & Gefahren (green & hazards) · Erledigungen (everyday errands). How it is calculated →
Set your priorities to see your own LAGE for this building →
The neighbourhood in figures
- Loud road facade (≥ 65 dB Lden)
- 42 % of addresses
- Free of mapped noise ≥ 55 dB at the building
- 2 %
- Inside a 30- or 100-year flood area
- 0 %
- Public transport class A or B
- 100 %
- Green & open land within 300 m (average)
- 4 %
- Distance to the nearest park or forest (average)
- 183 m
- Protection zone (Schutzzone)
- 14 %
- Residents
- 1,112 · more densely populated than most of Vienna
Building works and projects nearby
This address lies beyond the reach of every construction site, zoning change and planned line. 12 more projects within 1 km.
Further away, within 1 km (12)
-
Building MOLL - Mollardgasse 87 - brandschutztechnische Verbesserungsmaßnahmen - Gewerk Baumeister210 m Contract awarded 24 October 2024 Source: Kerndaten (public tenders) · 9 records · checked 10 October 2026· Found automatically. Check with the source.
History (9)
- award published (Kerndaten)
- award published (Kerndaten)
- award published (Kerndaten)
- award published (Kerndaten)
- award published (Kerndaten)
- award published (Kerndaten)
- award published (Kerndaten)
- award published (Kerndaten)
-
Building KH BHS - MR - Baumeister281 m Tendered · contract period 1 March 2027 – 30 June 2028 Source: TED (EU tenders) · 3 records · checked 10 October 2026· Found automatically. Check with the source.
History (3)
- tender published (TED 523155-2026)
- tender published (TED 523852-2026)
- tender published (TED 525201-2026)
-
Building 1060 Wien, Webg. 2a - Sanierung, Bestandssanierung, Generalsanierung ME 4 / Top 10381 m Contract awarded 16 June 2025 Source: Kerndaten (public tenders) · checked 10 October 2026· Found automatically. Check with the source.
-
Building Generalunternehmerleistungen für die Generalsanierung einer Schule in der Mittelgasse 24 / Spalowskygasse 5, 1060 Wien; Zusatzleistungen hinsichtlich eines Dachausbaus450 m Contract awarded 4 November 2024 Source: TED (EU tenders) · checked 10 October 2026· Found automatically. Check with the source.
-
Zoning change Plandokument 8414: Gebiet zwischen Ullmannstraße, Karl-Walther-Gasse, Graumanngasse und Pfeiffergasse526 m Zoning in progress 18 May 2026 Source: data.gv.at (information requests) · checked 10 October 2026
-
Public transport U-Bahn-Linie U2, Bauabschnitte U2/17-U2/21; Konstruktiver Ingenieurbau, Tunnelbau, Gleisbau579 m Contract awarded 16 September 2025 · part of U2, 4. Ausbauphase Source: TED (EU tenders) · 7 records · checked 10 October 2026· Found automatically. Check with the source.
History (7)
- tender published (TED 116012-2019)
- notice changed (TED 142519-2019)
- award published (TED 28914-2021)
- award published (TED 21980-2022)
- award published (TED 239588-2022)
- award published (TED 606170-2022)
- award published (TED 680150-2025)
-
Zoning change Bacherplatz580 m Zoning in progress · draft on public display 14 October 2026 – 25 November 2026; building freeze until 14 May 2027 Source: Stadt Wien · 2 records · checked 16 October 2026
History (2)
- building freeze announced
- procedure stage: Öffentliche Auflage
-
Building WWSPEN-Wohnhaus Spengergasse 45 - Totalsanierung – Umbau und Aufstockung - Generalunternehmer704 m Contract awarded · contract period 27 March 2025 – 15 February 2027 Source: TED (EU tenders), Kerndaten (public tenders) · 3 records · checked 10 October 2026· Found automatically. Check with the source.
History (3)
- tender published (TED 636999-2024)
- award published (TED 210517-2025)
- award published (Kerndaten)
-
Public transport Rechte Wienzeile von Kreuzung Ramperstorffergasse bis Kreuzung Pilgramgasse und Pilgrambrücke U-Bahn construction709 m Under construction · works since 28 February 2021, planned until 31 May 2028 · part of U2, 4. Ausbauphase Source: Stadt Wien, TED (EU tenders) · 10 records · checked 16 October 2026
History (4)
- award published (TED 475971-2022)
- tender published (TED 829936-2025)
- tender published (TED 585716-2026)
- listed by the city
-
Public transport U2, 4. Ausbauphase715 m Under construction · opening planned for 2030 Source: Stadt Wien · 42 records · checked 16 October 2026
-
Public transport Bacherplatz von Arbeitergasse bis Schwarzhorngasse U-Bahn construction824 m Under construction · works since 28 February 2021, planned until 31 December 2028 · part of U2, 4. Ausbauphase Source: Stadt Wien · 7 records · checked 16 October 2026
-
Public transport Siebenbrunnengasse von Kreuzung Siebenbrunnenplatz und Reinprechtsdorfer Straße bis 44 U-Bahn construction833 m Under construction · works since 28 February 2021, planned until 31 December 2026 · part of U2, 4. Ausbauphase Source: Stadt Wien · 7 records · checked 16 October 2026
From the City of Vienna (construction sites that affect traffic, zoning procedures, building freezes, planned U-Bahn, tram and major roads), public tenders, the Freedom of Information register and environmental impact assessments. We have recorded these sources every day since 10 October 2026. A moved end date shows as a delay. Private building sites appear only where they affect traffic or were tendered publicly.
All projects in Vienna → Know of a project that is missing? Tell us
The address in figures
Noise
- Loudest facade (day–evening–night level)
- road 60–64 dB
- Quiet side
- yes
Getting around
- Public transport class
- A
- Nearest stop
- Wien Sonnenuhrgasse, 2 min walk, every 8 min
- Frequent service (every 10 min or more often)
- Wien Sonnenuhrgasse, 2 min walk, every 8 min
On foot
- Supermarket
- 1 min
- Pharmacy
- 4 min
- Doctor's practice
- 2 min
- Crèche
- 3 min
- Kindergarten
- 1 min
- Primary school
- 1 min
- Middle school
- 4 min
- Playground
- 3 min
Green and air
- Green and open land within 300 m
- 6 %
- Nearest park
- Bruno-Kreisky-Park, 3 min walk
- Nearest forest
- –
- NO₂ / PM2.5, modelled 2022
- 35.3 / 11.8 µg/m³
- Heat days per year, now → around 2050
- –
Hazards and rules
- Flooding
- outside mapped flood areas
- Zoning
- residential
- Protection zones
- outside all zones
Residents
- Residents within 300 m
- 6,000 · more densely populated than most of Vienna
- Who lives in the neighbourhood
- younger residents than in most of Vienna
Prices
- Apartments, average €/m² by building age
- € 4,708–5,445 (the Mariahilf district)
The full report explains every figure, chapter by chapter, with what to check before you sign →
Sources: BEV cadastre and address register, Stadt Wien OGD (zoning, flood and protection zones, facility registers), BMLUK noise and flood maps, WLV hazard zones, ÖROK ÖV-Güteklassen 2025, European Environment Agency, Statistik Austria, © OpenStreetMap contributors. CC BY 4.0 / ODbL. Lagecheck processed the data. All sources and licences →