Your address
Murbangasse 6
1100 Wien · 10. Favoriten
The LAGE score
This building
Modest · better than 33 % of all addresses in Vienna
The neighbourhood
Oberlaaer Straße / Doerenkampgasse area · Modest · Vienna average: 65.
| Score | This building | Neighbourhood | Vienna |
|---|---|---|---|
| LQuietness | 59 | 32 | 87 |
| LAir quality | 33 | 55 | 46 |
| APublic transport | 78 | 90 | 90 |
| GGreen space | 56 | 46 | 53 |
| GNatural hazards | 100 | 100 | 100 |
| EEveryday amenities | 86 | 79 | 97 |
0–100, higher is better. The neighbourhood and city columns show the average score of all their addresses, scored with the same rules.
LAGE stands for Lärm & Luft (noise & air) · Anbindung (transport links) · Grün & Gefahren (green & hazards) · Erledigungen (everyday errands). How it is calculated →
Set your priorities to see your own LAGE for this building →
The neighbourhood in figures
- Loud road facade (≥ 65 dB Lden)
- 42 % of addresses
- Free of mapped noise ≥ 55 dB at the building
- 15 %
- Inside a 30- or 100-year flood area
- 0 %
- Public transport class A or B
- 60 %
- Green & open land within 300 m (average)
- 10 %
- Distance to the nearest park or forest (average)
- 219 m
- Residents
- 33 · very thinly populated for Vienna
Building works and projects nearby
1 new station is planned within walking distance. 5 more projects within 1 km.
New stations nearby
-
Public transport New station Himberger Straße (U1)380 m U1 · Planned · opening planned for 2040 Source: Stadt Wien · 21 records · checked 16 October 2026
Further away, within 1 km (5)
-
Public transport Zweigleisiger Ausbau der Pottendorfer Linie Abschnitt Wien Meidling - Abzweigung Altmannsdorf (ÖBB Strecken, 10601, 10615, 10616)490 m Approved 2021 Source: Umweltbundesamt (environmental impact assessment) · checked 16 October 2026 · route © OpenStreetMap contributors
-
Roads and bridges IFG_10_838 Untergrunderkundungen Städtebau- und Straßenbauvorhaben Rothneusiedl747 m Contract awarded 25 February 2026 Source: data.gv.at (information requests) · checked 10 October 2026· Found automatically. Check with the source.
-
Building 10., Franz-Koci-Straße 2-6873 m Contract awarded · contract period 15 March 2026 – 28 November 2028 · end moved 182 days later since first listed Source: TED (EU tenders) · 20 records · checked 10 October 2026· Found automatically. Check with the source.
History (20)
- award published (TED 170759-2026)
- award published (TED 200707-2026)
- award published (TED 207062-2026)
- award published (TED 216375-2026)
- award published (TED 384430-2026)
- award published (TED 448384-2026)
- tender published (TED 547209-2026)
- award published (TED 623777-2026)
-
Building 10., Wendstattgasse 7 Stiegen 1-8+10936 m Contract awarded · contract period 15 June 2026 – 28 September 2029 · end moved 286 days later since first listed Source: TED (EU tenders) · 25 records · checked 16 October 2026· Found automatically. Check with the source.
History (25)
- tender published (TED 256967-2026)
- award published (TED 379770-2026)
- award published (TED 435441-2026)
- award published (TED 438029-2026)
- award published (TED 480435-2026)
- award published (TED 626353-2026)
- award published (TED 706985-2026)
- award published (TED 709535-2026)
-
New quarter 10., Rothneusiedl955 m Planned · 10000 flats Source: Stadt Wien · checked 16 October 2026
From the City of Vienna (construction sites that affect traffic, zoning procedures, building freezes, planned U-Bahn, tram and major roads), public tenders, the Freedom of Information register and environmental impact assessments. We have recorded these sources every day since 10 October 2026. A moved end date shows as a delay. Private building sites appear only where they affect traffic or were tendered publicly.
All projects in Vienna → Know of a project that is missing? Tell us
The address in figures
Noise
- Loudest facade (day–evening–night level)
- road 55–59 dB, rail 65–69 dB
- Quiet side
- yes
Getting around
- Public transport class
- C
- Nearest stop
- Wien Sulzengasse, 4 min walk, every 8 min
- Frequent service (every 10 min or more often)
- Wien Sulzengasse, 4 min walk, every 8 min
On foot
- Supermarket
- 9 min
- Pharmacy
- 10 min
- Doctor's practice
- 11 min
- Crèche
- 6 min
- Kindergarten
- 6 min
- Primary school
- 8 min
- Middle school
- 13 min
- Playground
- 5 min
Green and air
- Green and open land within 300 m
- 15 %
- Nearest park
- Parkanlage Per-Albin-Hansson-Straße, 3 min walk
- Nearest forest
- unnamed, 3 min walk
- NO₂ / PM2.5, modelled 2022
- 30.1 / 11.0 µg/m³
- Heat days per year, now → around 2050
- –
Hazards and rules
- Flooding
- outside mapped flood areas
- Zoning
- commercial
- Protection zones
- outside all zones
Residents
- Residents within 300 m
- 72 · very thinly populated for Vienna
- Who lives in the neighbourhood
- younger residents than in most of Vienna; more children; fewer older people
Prices
- Apartments, average €/m² by building age
- € 3,024–4,354 (the Favoriten district)
The full report explains every figure, chapter by chapter, with what to check before you sign →
Sources: BEV cadastre and address register, Stadt Wien OGD (zoning, flood and protection zones, facility registers), BMLUK noise and flood maps, WLV hazard zones, ÖROK ÖV-Güteklassen 2025, European Environment Agency, Statistik Austria, © OpenStreetMap contributors. CC BY 4.0 / ODbL. Lagecheck processed the data. All sources and licences →