Your address

Museumsplatz T

1070 Wien · 7. Neubau

The outline marks the neighbourhood Karl-Schweighofer-Gasse area, with 42 addresses.worksplannedzoning change · projects nearby

The LAGE score

This building

Weak · better than 7 % of all addresses in Vienna

The neighbourhood

Karl-Schweighofer-Gasse area · Modest · Vienna average: 65.

ScoreThis buildingNeighbourhoodVienna
LQuietness 5 1787
LAir quality 51 5146
APublic transport 100 10090
GGreen space 39 3353
GNatural hazards 100 100100
EEveryday amenities 100 10097

0–100, higher is better. The neighbourhood and city columns show the average score of all their addresses, scored with the same rules.

LAGE stands for Lärm & Luft (noise & air) · Anbindung (transport links) · Grün & Gefahren (green & hazards) · Erledigungen (everyday errands). How it is calculated →

Set your priorities to see your own LAGE for this building →

The neighbourhood in figures

Loud road facade (≥ 65 dB Lden)
62 % of addresses
Free of mapped noise ≥ 55 dB at the building
0 %
Inside a 30- or 100-year flood area
0 %
Public transport class A or B
100 %
Green & open land within 300 m (average)
5 %
Distance to the nearest park or forest (average)
334 m
Protection zone (Schutzzone)
100 %
Residents
278 · about as densely populated as most of Vienna
The neighbourhood report →

Building works and projects nearby

This address lies beyond the reach of every construction site, zoning change and planned line. 12 more projects within 1 km.

Further away, within 1 km (12)
  • Building 1060 Wien, Getreidemarkt 9- Baumeisterarbeiten (Zaunsanierung)
    209 m Contract awarded 2 September 2026 Source: Kerndaten (public tenders) · 13 records · checked 10 October 2026· Found automatically. Check with the source.
    History (13)
    1. award published (Kerndaten)
    2. award published (Kerndaten)
    3. award published (Kerndaten)
    4. award published (Kerndaten)
    5. award published (Kerndaten)
    6. award published (Kerndaten)
    7. award published (Kerndaten)
    8. award published (Kerndaten)
  • Public transport Volksgartenstraße 2 U-Bahn construction
    307 m Under construction · works since 28 February 2021, planned until 31 December 2029 Source: Stadt Wien · 7 records · checked 16 October 2026
  • Roads and bridges 6., Windmühlgasse u.a.
    352 m Contract awarded · contract period 1 September 2026 – 22 October 2027 Source: TED (EU tenders) · 3 records · checked 10 October 2026· Found automatically. Check with the source.
    History (3)
    1. tender published (TED 451515-2026)
    2. tender published (TED 518208-2026)
    3. award published (TED 672839-2026)
  • Building E90094/196/0-Dion7/2025, 1070 Wien, Stiftgasse 2-2A, Stift Kaserne, Obj. 001 - Mosertrakt, Instandsetzung - Trockenlegung, Baumeisterarbeiten
    376 m Contract awarded 3 February 2026 Source: Kerndaten (public tenders) · 3 records · checked 10 October 2026· Found automatically. Check with the source.
    History (3)
    1. award published (Kerndaten)
    2. award published (Kerndaten)
    3. award published (Kerndaten)
  • Building 1010 Wien, Schmerlingplatz 10-11, Justizpalast - Gebäudekühlung - Einleitung der Fernkälte - hochbauliche Arbeiten
    382 m Contract awarded 14 May 2025 Source: Kerndaten (public tenders) · 7 records · checked 10 October 2026· Found automatically. Check with the source.
    History (7)
    1. award published (Kerndaten)
    2. award published (Kerndaten)
    3. award published (Kerndaten)
    4. award published (Kerndaten)
    5. award published (Kerndaten)
    6. award published (Kerndaten)
    7. award published (Kerndaten)
  • Roads and bridges Burggasse 25 bis 45 road works
    431 m Under construction · works since 27 July 2026, planned until 30 October 2026 Source: Stadt Wien · 7 records · checked 16 October 2026
  • Public transport Mariahilfer Straße von Stiftgasse bis Erika-Weinzierl-Platz und Kirchengasse track works
    447 m Under construction · works since 28 February 2021, planned until 31 December 2029 Source: Stadt Wien · 7 records · checked 16 October 2026
  • Public transport Kirchengasse 1 bis 30 U-Bahn construction
    600 m Under construction · works since 28 February 2021, planned until 31 December 2029 · part of U2, 4. Ausbauphase Source: Stadt Wien · 7 records · checked 16 October 2026
  • Building Naschmarkt – Ost – Marktraum vorbereitende Maßnahmen Bauphase 1A
    606 m Tendered · contract period 23 October 2024 – 21 February 2027 Source: TED (EU tenders) · 4 records · checked 10 October 2026· Found automatically. Check with the source.
    History (4)
    1. tender published (TED 512553-2024)
    2. tender published (TED 661131-2024)
    3. tender published (TED 718666-2024)
    4. tender published (TED 513099-2026)
  • Public transport U2, 4. Ausbauphase
    618 m Under construction · opening planned for 2030 Source: Stadt Wien · 42 records · checked 16 October 2026
  • Building 04., Rechte Wienzeile 25-27
    701 m Contract awarded · contract period 15 March 2025 – 2 April 2028 · end moved 47 days later since first listed Source: TED (EU tenders) · 24 records · checked 10 October 2026· Found automatically. Check with the source.
    History (24)
    1. award published (TED 149259-2025)
    2. award published (TED 187214-2025)
    3. tender published (TED 239094-2025)
    4. award published (TED 269220-2025)
    5. award published (TED 321786-2025)
    6. tender published (TED 471650-2025)
    7. award published (TED 535946-2025)
    8. award published (TED 34015-2026)
  • Building 1010 Wien, Minoritenplatz 9, Generalsanierung Minoritenplatz 9, Lüftungsinstallationen
    716 m Contract awarded · contract period 1 March 2025 – 1 March 2029 · end moved 396 days later since first listed Source: TED (EU tenders), Kerndaten (public tenders) · 144 records · checked 15 October 2026· Found automatically. Check with the source.
    History (144)
    1. award published (Kerndaten)
    2. award published (Kerndaten)
    3. tender published (Kerndaten)
    4. tender published (Kerndaten)
    5. tender published (Kerndaten)
    6. award published (TED 678286-2026)
    7. award published (TED 678734-2026)
    8. award published (TED 680297-2026)

From the City of Vienna (construction sites that affect traffic, zoning procedures, building freezes, planned U-Bahn, tram and major roads), public tenders, the Freedom of Information register and environmental impact assessments. We have recorded these sources every day since 10 October 2026. A moved end date shows as a delay. Private building sites appear only where they affect traffic or were tendered publicly.

The address in figures

Noise

Loudest facade (day–evening–night level)
road 70–74 dB
Quiet side
no

Getting around

Public transport class
A
Nearest stop
Wien Museumsquartier, 3 min walk, every 3 min
Frequent service (every 10 min or more often)
Wien Museumsquartier, 3 min walk, every 3 min

On foot

Supermarket
3 min
Pharmacy
4 min
Doctor's practice
3 min
Crèche
2 min
Kindergarten
2 min
Primary school
6 min
Middle school
12 min
Playground
4 min

Green and air

Green and open land within 300 m
8 %
Nearest park
Burggarten, 5 min walk
Nearest forest
–
NO₂ / PM2.5, modelled 2022
32.7 / 11.6 µg/m³
Heat days per year, now → around 2050
–

Hazards and rules

Flooding
outside mapped flood areas
Zoning
open land
Protection zones
old-town zone, UNESCO World Heritage

Residents

Residents within 300 m
1,223 · about as densely populated as most of Vienna
Who lives in the neighbourhood
older residents than in most of Vienna; more older people

Prices

Apartments, average €/m² by building age
€ 4,849–6,214 (the Neubau district)

The full report explains every figure, chapter by chapter, with what to check before you sign →

Sources: BEV cadastre and address register, Stadt Wien OGD (zoning, flood and protection zones, facility registers), BMLUK noise and flood maps, WLV hazard zones, ÖROK ÖV-Güteklassen 2025, European Environment Agency, Statistik Austria, © OpenStreetMap contributors. CC BY 4.0 / ODbL. Lagecheck processed the data. All sources and licences →