Your address

Neubaugürtel 23A

1150 Wien · 15. Rudolfsheim-Fünfhaus

The outline marks the neighbourhood Löhrgasse area, with 39 addresses.worksplannedzoning change · projects nearby

The LAGE score

This building

Weak · better than 2 % of all addresses in Vienna

The neighbourhood

Löhrgasse area · Weak · Vienna average: 65.

ScoreThis buildingNeighbourhoodVienna
LQuietness 5 587
LAir quality 13 1346
APublic transport 100 10090
GGreen space 52 5253
GNatural hazards 100 100100
EEveryday amenities 100 10097

0–100, higher is better. The neighbourhood and city columns show the average score of all their addresses, scored with the same rules.

LAGE stands for Lärm & Luft (noise & air) · Anbindung (transport links) · Grün & Gefahren (green & hazards) · Erledigungen (everyday errands). How it is calculated →

Set your priorities to see your own LAGE for this building →

The neighbourhood in figures

Loud road facade (≥ 65 dB Lden)
82 % of addresses
Free of mapped noise ≥ 55 dB at the building
0 %
Inside a 30- or 100-year flood area
0 %
Public transport class A or B
100 %
Green & open land within 300 m (average)
9 %
Distance to the nearest park or forest (average)
66 m
Residents
630 · more densely populated than most of Vienna
The neighbourhood report →

Building works and projects nearby

This address lies beyond the reach of every construction site, zoning change and planned line. 10 more projects within 1 km.

Further away, within 1 km (10)
  • Building 07., Apollogasse
    396 m Planned · developer competition 2020 · 159 flats Source: Stadt Wien · checked 16 October 2026
  • Building 1070 Wien, Neustiftgasse 95-99, Dämmung oberste Geschoßdecke - Baumeisterarbeiten
    644 m Contract awarded 8 January 2025 Source: Kerndaten (public tenders) · 4 records · checked 10 October 2026· Found automatically. Check with the source.
    History (4)
    1. award published (Kerndaten)
    2. award published (Kerndaten)
    3. award published (Kerndaten)
    4. award published (Kerndaten)
  • Public transport Märzstraße 49 bis Kreuzung Huglgasse sowie Kreuzung Huglgasse bis Kreuzung Hütteldorfer Straße track works
    798 m Under construction · works since 14 September 2026, planned until 15 November 2026 Source: Stadt Wien · 7 records · checked 16 October 2026
  • Building Mein Gesundheitszentrum Neubau - Teil-Generalunternehmer Rohbau
    841 m Tendered · contract period 15 September 2026 – 4 December 2030 Source: TED (EU tenders) · 6 records · checked 16 October 2026· Found automatically. Check with the source.
    History (6)
    1. tender published (TED 465942-2026)
    2. tender published (TED 487766-2026)
    3. tender published (TED 490200-2026)
    4. tender published (TED 496163-2026)
    5. tender published (TED 593204-2026)
    6. tender published (TED 704637-2026)
  • Roads and bridges Albertgasse von Kreuzung Josef-Matthias-Hauer-Platz und Josefstädter Straße bis Kreuzung Florianigas road works
    861 m Under construction · works since 12 October 2026, planned until 1 September 2027 Source: Stadt Wien · 14 records · checked 16 October 2026
  • Roads and bridges Burggasse 67 road works
    912 m Under construction · works since 27 July 2026, planned until 30 October 2026 Source: Stadt Wien · 7 records · checked 16 October 2026
  • Building Stadt Wien - Wiener Wohnen - 08., Pfeilgasse 47-49 - Baumeister
    929 m Contract awarded · contract period 19 February 2025 – 1 May 2027 Source: TED (EU tenders), Kerndaten (public tenders) · 36 records · checked 10 October 2026· Found automatically. Check with the source.
    History (36)
    1. award published (TED 318339-2025)
    2. award published (Kerndaten)
    3. award published (TED 435301-2025)
    4. award published (TED 435576-2025)
    5. award published (Kerndaten)
    6. award published (Kerndaten)
    7. award published (TED 622720-2025)
    8. award published (Kerndaten)
  • Building 15., Loeschenkohlgasse 30-32
    938 m Contract awarded · contract period 14 August 2025 – 1 October 2027 Source: TED (EU tenders) · 18 records · checked 10 October 2026· Found automatically. Check with the source.
    History (18)
    1. tender published (TED 688999-2024)
    2. award published (TED 96993-2025)
    3. award published (TED 118600-2025)
    4. award published (TED 137192-2025)
    5. award published (TED 172916-2025)
    6. award published (TED 368070-2025)
    7. award published (TED 402718-2025)
    8. award published (TED 431101-2025)
  • Roads and bridges Mariahilfer Straße von Linzer Straße und Anschützgasse und Zollernsperggasse bis Sperrgasse und Talg road works
    958 m Under construction · works since 13 April 2026, planned until 30 April 2027 Source: Stadt Wien, TED (EU tenders), Kerndaten (public tenders) · 30 records · checked 16 October 2026
    History (10)
    1. award published (Kerndaten)
    2. tender published (TED 862003-2025)
    3. tender published (TED 247267-2026)
    4. award published (TED 256589-2026)
    5. award published (Kerndaten)
    6. award published (Kerndaten)
    7. award published (TED 552509-2026)
    8. listed by the city
  • Building Generalunternehmerleistungen für die Generalsanierung einer Schule in der Mittelgasse 24 / Spalowskygasse 5, 1060 Wien; Zusatzleistungen hinsichtlich eines Dachausbaus
    966 m Contract awarded 4 November 2024 Source: TED (EU tenders) · checked 10 October 2026· Found automatically. Check with the source.

From the City of Vienna (construction sites that affect traffic, zoning procedures, building freezes, planned U-Bahn, tram and major roads), public tenders, the Freedom of Information register and environmental impact assessments. We have recorded these sources every day since 10 October 2026. A moved end date shows as a delay. Private building sites appear only where they affect traffic or were tendered publicly.

The address in figures

Noise

Loudest facade (day–evening–night level)
road ≥ 75 dB, rail 60–64 dB
Quiet side
yes

Getting around

Public transport class
A
Nearest stop
Wien Urban-Loritz-Platz, 1 min walk, every 1 min
Frequent service (every 10 min or more often)
Wien Urban-Loritz-Platz, 1 min walk, every 1 min

On foot

Supermarket
1 min
Pharmacy
2 min
Doctor's practice
3 min
Crèche
4 min
Kindergarten
3 min
Primary school
4 min
Middle school
4 min
Playground
2 min

Green and air

Green and open land within 300 m
10 %
Nearest park
Emil-Maurer-Park, 1 min walk
Nearest forest
–
NO₂ / PM2.5, modelled 2022
36.0 / 11.3 µg/m³
Heat days per year, now → around 2050
–

Hazards and rules

Flooding
outside mapped flood areas
Zoning
core / mixed use
Protection zones
outside all zones

Residents

Residents within 300 m
4,483 · more densely populated than most of Vienna
Who lives in the neighbourhood
younger residents than in most of Vienna; more people between 15 and 29; fewer children and older people

Prices

Apartments, average €/m² by building age
€ 3,591–4,905 (the Rudolfsheim-Fünfhaus district)

The full report explains every figure, chapter by chapter, with what to check before you sign →

Sources: BEV cadastre and address register, Stadt Wien OGD (zoning, flood and protection zones, facility registers), BMLUK noise and flood maps, WLV hazard zones, ÖROK ÖV-Güteklassen 2025, European Environment Agency, Statistik Austria, © OpenStreetMap contributors. CC BY 4.0 / ODbL. Lagecheck processed the data. All sources and licences →