Your address

Nordbahnstraße 50

1020 Wien · 2. Leopoldstadt

The outline marks the neighbourhood Heinestraße area, with 48 addresses.worksplannedzoning change · projects nearby

The LAGE score

This building

Weak · better than 14 % of all addresses in Vienna

The neighbourhood

Heinestraße area · Modest · Vienna average: 65.

ScoreThis buildingNeighbourhoodVienna
LQuietness 17 5387
LAir quality 32 3246
APublic transport 100 10090
GGreen space 42 3753
GNatural hazards 100 100100
EEveryday amenities 100 10097

0–100, higher is better. The neighbourhood and city columns show the average score of all their addresses, scored with the same rules.

LAGE stands for Lärm & Luft (noise & air) · Anbindung (transport links) · Grün & Gefahren (green & hazards) · Erledigungen (everyday errands). How it is calculated →

Set your priorities to see your own LAGE for this building →

The neighbourhood in figures

Loud road facade (≥ 65 dB Lden)
50 % of addresses
Free of mapped noise ≥ 55 dB at the building
0 %
Inside a 30- or 100-year flood area
0 %
Public transport class A or B
100 %
Green & open land within 300 m (average)
6 %
Distance to the nearest park or forest (average)
286 m
Protection zone (Schutzzone)
27 %
Residents
1,073 · more densely populated than most of Vienna
The neighbourhood report →

Building works and projects nearby

2 projects reach this address. 12 more projects within 1 km.

Works and changes that reach this address

Further away, within 1 km (12)
  • Roads and bridges Praterstern von Kreuzung Franzensbrückenstraße bis Kreuzung Hauptallee works on a special structure
    170 m Under construction · works since 14 September 2026, planned until 30 November 2026 Source: Stadt Wien · 7 records · checked 16 October 2026
  • Pipes and cables Nordbahnstraße von Alliiertenstraße bis Am Tabor pipe laying
    372 m Under construction · works since 26 July 2026, planned until 1 November 2026 Source: Stadt Wien · 7 records · checked 16 October 2026
  • Building A23 Südosttangente Wien, GE Kn Prater - ASt Handelskai, km 10,596 - km 12,287
    435 m Contract awarded · contract period 8 July 2024 – 31 October 2031 Source: TED (EU tenders) · 24 records · checked 10 October 2026· Found automatically. Check with the source.
    History (24)
    1. award published (TED 197646-2026)
    2. award published (TED 204964-2026)
    3. award published (TED 218285-2026)
    4. award published (TED 239657-2026)
    5. award published (TED 287541-2026)
    6. award published (TED 411646-2026)
    7. award published (TED 524521-2026)
    8. award published (TED 644329-2026)
  • Pipes and cables Kanalsanierung und Hybridanlage - Schule Wien 2, Vereinsgasse 29
    561 m Contract awarded 12 December 2025 Source: data.gv.at (information requests) · checked 10 October 2026· Found automatically. Check with the source.
  • Public transport Linie 29: Augarten
    681 m Planned Source: Stadt Wien · 7 records · checked 16 October 2026
  • Roads and bridges Schüttelstraße von 9 bis 3 works on a special structure
    778 m Under construction · works since 14 September 2026, planned until 15 November 2026 Source: Stadt Wien · 7 records · checked 16 October 2026
  • Building 20., Nordwestbahnhof – Phase A.2
    783 m Tendered · 100 flats Source: Stadt Wien · checked 16 October 2026
  • Roads and bridges (ProVia-ID 116375) Technische Freimachung Wien Nordwestbahnhof; Abbrucharbeiten
    783 m Contract awarded · contract period 2 September 2024 – 1 September 2028 Source: TED (EU tenders) · 2 records · checked 10 October 2026· Found automatically. Check with the source.
    History (2)
    1. tender published (TED 281451-2024)
    2. award published (TED 492315-2024)
  • Building Heizung, Klimatechnik, Lüftung und Sanitär
    820 m Tendered · contract period 30 March 2026 – 28 June 2027 Source: TED (EU tenders) · 3 records · checked 10 October 2026· Found automatically. Check with the source.
    History (3)
    1. tender published (TED 629712-2025)
    2. tender published (TED 701861-2025)
    3. tender published (TED 705095-2025)
  • Pipes and cables Ausstellungsstraße von 21 bis 23 pipe laying
    840 m Under construction · works since 7 June 2026, planned until 31 March 2027 Source: Stadt Wien · 7 records · checked 16 October 2026
  • Building Generalunternehmerleistungen, Amtshaus 1020 Wien, Karmelitergasse 9, Generalinstandsetzung inkl. Dachgeschossausbau
    857 m Tendered · contract period 28 July 2027 – 19 July 2029 Source: TED (EU tenders) · checked 10 October 2026· Found automatically. Check with the source.
  • Building BAUI.IM6009: Technische Freimachung Wien Nordwestbahnhof - Abbrucharbeiten
    901 m Contract awarded 28 September 2026 Source: Kerndaten (public tenders) · 4 records · checked 12 October 2026· Found automatically. Check with the source.
    History (4)
    1. award published (Kerndaten)
    2. award published (Kerndaten)
    3. award published (Kerndaten)
    4. award published (Kerndaten)

From the City of Vienna (construction sites that affect traffic, zoning procedures, building freezes, planned U-Bahn, tram and major roads), public tenders, the Freedom of Information register and environmental impact assessments. We have recorded these sources every day since 10 October 2026. A moved end date shows as a delay. Private building sites appear only where they affect traffic or were tendered publicly.

The address in figures

Noise

Loudest facade (day–evening–night level)
road 70–74 dB, rail 60–64 dB
Quiet side
yes

Getting around

Public transport class
A
Nearest stop
Wien Mühlfeldgasse, 1 min walk, every 6 min
Frequent service (every 10 min or more often)
Wien Mühlfeldgasse, 1 min walk, every 6 min

On foot

Supermarket
3 min
Pharmacy
2 min
Doctor's practice
3 min
Crèche
2 min
Kindergarten
2 min
Primary school
6 min
Middle school
7 min
Playground
3 min

Green and air

Green and open land within 300 m
8 %
Nearest park
Franziska-Löw-Park, 4 min walk
Nearest forest
unnamed, 10 min walk
NO₂ / PM2.5, modelled 2022
30.4 / 11.6 µg/m³
Heat days per year, now → around 2050
–

Hazards and rules

Flooding
outside mapped flood areas
Zoning
core / mixed use
Protection zones
old-town zone

Residents

Residents within 300 m
5,095 · more densely populated than most of Vienna
Who lives in the neighbourhood
a typical age mix for Vienna

Prices

Apartments, average €/m² by building age
€ 4,603–6,369 (the Leopoldstadt district)

The full report explains every figure, chapter by chapter, with what to check before you sign →

Sources: BEV cadastre and address register, Stadt Wien OGD (zoning, flood and protection zones, facility registers), BMLUK noise and flood maps, WLV hazard zones, ÖROK ÖV-Güteklassen 2025, European Environment Agency, Statistik Austria, © OpenStreetMap contributors. CC BY 4.0 / ODbL. Lagecheck processed the data. All sources and licences →