Your address

Nottendorfer Gasse 29

1030 Wien · 3. Landstraße

The outline marks the neighbourhood Nottendorfer Gasse area, with 29 addresses.worksplannedzoning change · projects nearby

The LAGE score

This building

Modest · better than 27 % of all addresses in Vienna

The neighbourhood

Nottendorfer Gasse area · Weak · Vienna average: 65.

ScoreThis buildingNeighbourhoodVienna
LQuietness 67 2087
LAir quality 31 3146
APublic transport 100 10090
GGreen space 28 3353
GNatural hazards 100 100100
EEveryday amenities 91 9197

0–100, higher is better. The neighbourhood and city columns show the average score of all their addresses, scored with the same rules.

LAGE stands for Lärm & Luft (noise & air) · Anbindung (transport links) · Grün & Gefahren (green & hazards) · Erledigungen (everyday errands). How it is calculated →

Set your priorities to see your own LAGE for this building →

The neighbourhood in figures

Loud road facade (≥ 65 dB Lden)
72 % of addresses
Free of mapped noise ≥ 55 dB at the building
0 %
Inside a 30- or 100-year flood area
0 %
Public transport class A or B
100 %
Green & open land within 300 m (average)
4 %
Distance to the nearest park or forest (average)
331 m
Residents
377 · less densely populated than most of Vienna
The neighbourhood report →

Building works and projects nearby

This address lies beyond the reach of every construction site, zoning change and planned line. 12 more projects within 1 km.

Further away, within 1 km (12)
  • Roads and bridges Baumeister Hydrant, Amtshaus 1030 Wien, Karl-Farkas-Gasse 16
    398 m Contract awarded · contract period 8 September 2025 – 18 December 2026 Source: TED (EU tenders), Kerndaten (public tenders), data.gv.at (information requests) · 74 records · checked 10 October 2026· Found automatically. Check with the source.
    History (74)
    1. award published (Kerndaten)
    2. tender published (TED 510740-2026)
    3. award published (TED 554498-2026)
    4. award published (Kerndaten)
    5. award published (TED 639320-2026)
    6. award published (Kerndaten)
    7. award published (TED 656318-2026)
    8. award published (Kerndaten)
  • Roads and bridges A4 (Ostautobahn) von Knoten Prater bis Landesgrenze (beide Richtungsfahrbahnen) road works
    591 m Under construction · works since 23 July 2024, planned until 14 December 2026 Source: Stadt Wien · 7 records · checked 16 October 2026
  • Building 03., Guglgasse 7-9_Baumeisterarbeiten Umbau Beratungszone EG
    593 m Contract awarded 21 August 2025 Source: Kerndaten (public tenders) · 9 records · checked 10 October 2026· Found automatically. Check with the source.
    History (9)
    1. award published (Kerndaten)
    2. award published (Kerndaten)
    3. award published (Kerndaten)
    4. award published (Kerndaten)
    5. award published (Kerndaten)
    6. award published (Kerndaten)
    7. award published (Kerndaten)
    8. award published (Kerndaten)
  • New quarter Gasometervorfeld UNIQA Döblerhofstraße 10A
    622 m Approved 2024 Source: Stadt Wien · checked 16 October 2026
  • Building 1030 Wien, Schlachthausgasse 43/Viehmarktgasse 1, Universität Wien, BIOZ - Neubau Biologiezentrum St. Marx - Erweiterung HKLS Installationen Glashaus
    682 m Contract awarded 2 September 2026 Source: Kerndaten (public tenders) · 4 records · checked 10 October 2026· Found automatically. Check with the source.
    History (4)
    1. award published (Kerndaten)
    2. award published (Kerndaten)
    3. award published (Kerndaten)
    4. award published (Kerndaten)
  • Roads and bridges 11., Simmeringer Hauptstraße v. Litfaßstr. b. Zippererstr.
    716 m Contract awarded · contract period 19 May 2026 – 19 May 2027 Source: TED (EU tenders) · 3 records · checked 10 October 2026· Found automatically. Check with the source.
    History (3)
    1. tender published (TED 142501-2026)
    2. tender published (TED 213718-2026)
    3. award published (TED 352920-2026)
  • Roads and bridges Landstraßer Hauptstraße von Emmerich-Teuber-Platz und Juchgasse und Apostelgasse bis Schlachthausgas road works
    748 m Under construction · works since 9 March 2026, planned until 31 August 2027 Source: Stadt Wien, TED (EU tenders) · 9 records · checked 16 October 2026
    History (3)
    1. tender published (TED 760400-2025)
    2. award published (TED 94160-2026)
    3. listed by the city
  • Pipes and cables Wien 3., Landstraßer Hauptstraße von Schlachthausgasse bis Juchgasse - Wasserrohrauswechslung - Rohrlegerarbeiten
    753 m Contract awarded · contract period 28 April 2026 – 13 April 2027 Source: TED (EU tenders), Kerndaten (public tenders), data.gv.at (information requests) · 5 records · checked 10 October 2026· Found automatically. Check with the source.
    History (5)
    1. tender published (TED 140941-2026)
    2. tender published (TED 141271-2026)
    3. award published (IFG)
    4. award published (Kerndaten)
    5. award published (Kerndaten)
  • Building 1110 Wien, Molitorgasse 15 / Dopplergasse 2 – Thermische Wohnhaussanierung – Baumeisterarbeiten
    777 m Tendered · contract period 1 November 2026 – 2 November 2029 Source: TED (EU tenders) · 9 records · checked 10 October 2026· Found automatically. Check with the source.
    History (9)
    1. tender published (TED 493514-2026)
    2. tender published (TED 493614-2026)
    3. tender published (TED 493720-2026)
    4. tender published (TED 493761-2026)
    5. tender published (TED 567796-2026)
    6. tender published (TED 571047-2026)
    7. tender published (TED 586114-2026)
    8. tender published (TED 599936-2026)
  • Building 11., Guglgasse 15-17_Innenausbau inkl. Abbruch
    778 m Contract awarded 21 August 2025 Source: Kerndaten (public tenders) · 2 records · checked 10 October 2026· Found automatically. Check with the source.
    History (2)
    1. award published (Kerndaten)
    2. award published (Kerndaten)
  • Roads and bridges Simmeringer Hauptstraße von Litfaßstraße bis Zippererstraße road works
    794 m Under construction · works since 18 May 2026, planned until 28 May 2027 Source: Stadt Wien · 7 records · checked 16 October 2026
  • New quarter Hallergasse
    867 m Approved 2019 Source: Stadt Wien · checked 16 October 2026

From the City of Vienna (construction sites that affect traffic, zoning procedures, building freezes, planned U-Bahn, tram and major roads), public tenders, the Freedom of Information register and environmental impact assessments. We have recorded these sources every day since 10 October 2026. A moved end date shows as a delay. Private building sites appear only where they affect traffic or were tendered publicly.

The address in figures

Noise

Loudest facade (day–evening–night level)
road 60–64 dB
Quiet side
yes

Getting around

Public transport class
A
Nearest stop
Wien Hermine-Jursa-Gasse, 2 min walk, every 10 min
Frequent service (every 10 min or more often)
Wien Hermine-Jursa-Gasse, 2 min walk, every 10 min

On foot

Supermarket
4 min
Pharmacy
5 min
Doctor's practice
9 min
Crèche
5 min
Kindergarten
5 min
Primary school
13 min
Middle school
14 min
Playground
8 min

Green and air

Green and open land within 300 m
1 %
Nearest park
Stadtwildnis, 5 min walk
Nearest forest
unnamed, 10 min walk
NO₂ / PM2.5, modelled 2022
30.8 / 11.7 µg/m³
Heat days per year, now → around 2050
–

Hazards and rules

Flooding
outside mapped flood areas
Zoning
commercial
Protection zones
outside all zones

Residents

Residents within 300 m
377 · very thinly populated for Vienna
Who lives in the neighbourhood
more older people and people between 15 and 29; fewer children

Prices

Apartments, average €/m² by building age
€ 4,538–5,655 (the Landstraße district)

The full report explains every figure, chapter by chapter, with what to check before you sign →

Sources: BEV cadastre and address register, Stadt Wien OGD (zoning, flood and protection zones, facility registers), BMLUK noise and flood maps, WLV hazard zones, ÖROK ÖV-Güteklassen 2025, European Environment Agency, Statistik Austria, © OpenStreetMap contributors. CC BY 4.0 / ODbL. Lagecheck processed the data. All sources and licences →