Your address
Prater 114
1020 Wien · 2. Leopoldstadt
The LAGE score
This building
Very good · better than 100 % of all addresses in Vienna
The neighbourhood
Prater area · Good · Vienna average: 65.
| Score | This building | Neighbourhood | Vienna |
|---|---|---|---|
| LQuietness | 95 | 95 | 87 |
| LAir quality | 55 | 55 | 46 |
| APublic transport | 90 | 90 | 90 |
| GGreen space | 93 | 68 | 53 |
| GNatural hazards | 100 | 100 | 100 |
| EEveryday amenities | 99 | 100 | 97 |
0–100, higher is better. The neighbourhood and city columns show the average score of all their addresses, scored with the same rules.
LAGE stands for Lärm & Luft (noise & air) · Anbindung (transport links) · Grün & Gefahren (green & hazards) · Erledigungen (everyday errands). How it is calculated →
Set your priorities to see your own LAGE for this building →
The neighbourhood in figures
- Loud road facade (≥ 65 dB Lden)
- 10 % of addresses
- Free of mapped noise ≥ 55 dB at the building
- 64 %
- Inside a 30- or 100-year flood area
- 0 %
- Public transport class A or B
- 99 %
- Green & open land within 300 m (average)
- 21 %
- Distance to the nearest park or forest (average)
- 120 m
- Residents
- 399 · about as densely populated as most of Vienna
Building works and projects nearby
1 project reaches this address. 12 more projects within 1 km.
Works and changes that reach this address
-
Building A23 Südosttangente Wien, GE Kn Prater - ASt Handelskai, km 10,596 - km 12,287on this street Contract awarded · contract period 8 July 2024 – 31 October 2031 Source: TED (EU tenders) · 24 records · checked 10 October 2026· Found automatically. Check with the source.
History (24)
- award published (TED 197646-2026)
- award published (TED 204964-2026)
- award published (TED 218285-2026)
- award published (TED 239657-2026)
- award published (TED 287541-2026)
- award published (TED 411646-2026)
- award published (TED 524521-2026)
- award published (TED 644329-2026)
Further away, within 1 km (12)
-
Building 1020 Wien Böcklinstraße 1- Dekarbonisierung Raus aus Gas Baumeisterarbeiten_Teil-GU375 m Contract awarded 30 June 2025 Source: Kerndaten (public tenders) · 2 records · checked 10 October 2026· Found automatically. Check with the source.
History (2)
- award published (Kerndaten)
- award published (Kerndaten)
-
Pipes and cables Ausstellungsstraße von 21 bis 23 pipe laying375 m Under construction · works since 7 June 2026, planned until 31 March 2027 Source: Stadt Wien · 7 records · checked 16 October 2026
-
Roads and bridges Schüttelstraße von 9 bis 3 works on a special structure514 m Under construction · works since 14 September 2026, planned until 15 November 2026 Source: Stadt Wien · 7 records · checked 16 October 2026
-
Roads and bridges Praterstern von Kreuzung Franzensbrückenstraße bis Kreuzung Hauptallee works on a special structure600 m Under construction · works since 14 September 2026, planned until 30 November 2026 Source: Stadt Wien · 7 records · checked 16 October 2026
-
Roads and bridges (ProVia-ID 140655) SBW-St; Bau; Baumeisterarbeiten Wien Mitte - Baumeisterarbeiten Wien Mitte - Praterstern (M14,16,17,20,21,22,32,33,38)625 m Contract awarded 31 May 2026 Source: TED (EU tenders), Kerndaten (public tenders) · 11 records · checked 15 October 2026· Found automatically. Check with the source.
History (11)
- award published (Kerndaten)
- award published (TED 375124-2026)
- award published (Kerndaten)
- award published (Kerndaten)
- award published (Kerndaten)
- tender published (Kerndaten)
- tender published (Kerndaten)
- tender published (Kerndaten)
-
Building VIECON Messe Wien - Audiovisuelle Systeme (AVS)631 m Contract awarded · contract period 1 January 2027 – 31 December 2031 Source: TED (EU tenders) · 2 records · checked 10 October 2026· Found automatically. Check with the source.
History (2)
- tender published (TED 63809-2026)
- award published (TED 574128-2026)
-
Building 1020 Wien, Welthandelsplatz 1, WU - Campus - Errichtung einer gebrauchsfertigen PV- Anlage809 m Tendered 6 December 2024 Source: TED (EU tenders) · checked 10 October 2026· Found automatically. Check with the source.
-
Building 02., Radingerstraße 21 - Baumeister- und Fenstertauscharbeiten874 m Contract awarded 21 September 2026 Source: Kerndaten (public tenders) · 7 records · checked 15 October 2026· Found automatically. Check with the source.
History (7)
- award published (Kerndaten)
- award published (Kerndaten)
- award published (Kerndaten)
- award published (Kerndaten)
- award published (Kerndaten)
- award published (Kerndaten)
- tender published (Kerndaten)
-
Building Wien 2., Wittelsbachstr. v. Rotundenbrücke b. Böcklinstraße u. 3., Plateau Rasumofskyg. / Rotundenbrücke / Weißgerberlände - Erd- u. Baumeisterarbeiten914 m Contract awarded 17 August 2026 Source: data.gv.at (information requests) · 2 records · checked 10 October 2026· Found automatically. Check with the source.
History (2)
- award published (IFG)
- award published (IFG)
-
Building 1020 Wien, Wittelsbachstraße 5, Thermische Sanierung inkl. Dekabonisierung, Bundes-Blindeninstitut, Baumeister Teil-GU914 m Contract awarded 25 September 2026 Source: Kerndaten (public tenders) · 3 records · checked 10 October 2026· Found automatically. Check with the source.
History (3)
- award published (Kerndaten)
- award published (Kerndaten)
- award published (Kerndaten)
-
Pipes and cables Wittelsbachstraße von Kreuzung Schüttelstraße und Rotundenbrücke bis Kreuzung Böcklinstraße pipe laying944 m Under construction · works since 14 September 2026, planned until 31 January 2027 Source: Stadt Wien · 7 records · checked 16 October 2026
-
Building Stadt Wien - Wiener Wohnen - 03., Lorbeergasse 6- Baumeister952 m Contract awarded 23 July 2025 Source: Kerndaten (public tenders) · 6 records · checked 10 October 2026· Found automatically. Check with the source.
History (6)
- award published (Kerndaten)
- award published (Kerndaten)
- award published (Kerndaten)
- award published (Kerndaten)
- award published (Kerndaten)
- award published (Kerndaten)
From the City of Vienna (construction sites that affect traffic, zoning procedures, building freezes, planned U-Bahn, tram and major roads), public tenders, the Freedom of Information register and environmental impact assessments. We have recorded these sources every day since 10 October 2026. A moved end date shows as a delay. Private building sites appear only where they affect traffic or were tendered publicly.
All projects in Vienna → Know of a project that is missing? Tell us
The address in figures
Noise
- Loudest facade (day–evening–night level)
- below 55 dB
- Quiet side
- –
Getting around
- Public transport class
- B
- Nearest stop
- Wien Welthandelsplatz, 6 min walk, every 34 min
- Frequent service (every 10 min or more often)
- Wien Kurzbauergasse, 7 min walk, every 10 min
On foot
- Supermarket
- 7 min
- Pharmacy
- 6 min
- Doctor's practice
- 6 min
- Crèche
- 6 min
- Kindergarten
- 6 min
- Primary school
- 10 min
- Middle school
- 10 min
- Playground
- 2 min
Green and air
- Green and open land within 300 m
- 37 %
- Nearest park
- Prater, 1 min walk
- Nearest forest
- unnamed, 3 min walk
- NO₂ / PM2.5, modelled 2022
- 23.5 / 12.0 µg/m³
- Heat days per year, now → around 2050
- –
Hazards and rules
- Flooding
- outside mapped flood areas
- Zoning
- special use
- Protection zones
- outside all zones
Residents
- Residents within 300 m
- 50 · very thinly populated for Vienna
- Who lives in the neighbourhood
- younger residents than in most of Vienna; more people between 15 and 29; fewer children and older people
Prices
- Apartments, average €/m² by building age
- € 4,603–6,369 (the Leopoldstadt district)
The full report explains every figure, chapter by chapter, with what to check before you sign →
Sources: BEV cadastre and address register, Stadt Wien OGD (zoning, flood and protection zones, facility registers), BMLUK noise and flood maps, WLV hazard zones, ÖROK ÖV-Güteklassen 2025, European Environment Agency, Statistik Austria, © OpenStreetMap contributors. CC BY 4.0 / ODbL. Lagecheck processed the data. All sources and licences →