Your address

Ramperstorffergasse 51

1050 Wien · 5. Margareten

The outline marks the neighbourhood Margaretenstraße / Schwarzhorngasse area, with 111 addresses.worksplannedzoning change · projects nearby

The LAGE score

This building

Modest · better than 18 % of all addresses in Vienna

The neighbourhood

Margaretenstraße / Schwarzhorngasse area · Modest · Vienna average: 65.

ScoreThis buildingNeighbourhoodVienna
LQuietness 17 3987
LAir quality 34 3446
APublic transport 100 9090
GGreen space 55 5353
GNatural hazards 100 100100
EEveryday amenities 100 10097

0–100, higher is better. The neighbourhood and city columns show the average score of all their addresses, scored with the same rules.

LAGE stands for Lärm & Luft (noise & air) · Anbindung (transport links) · Grün & Gefahren (green & hazards) · Erledigungen (everyday errands). How it is calculated →

Set your priorities to see your own LAGE for this building →

The neighbourhood in figures

Loud road facade (≥ 65 dB Lden)
51 % of addresses
Free of mapped noise ≥ 55 dB at the building
1 %
Inside a 30- or 100-year flood area
0 %
Public transport class A or B
100 %
Green & open land within 300 m (average)
11 %
Distance to the nearest park or forest (average)
88 m
Residents
1,908 · very densely populated for Vienna
The neighbourhood report →

Building works and projects nearby

3 projects reach this address. 1 new station is planned within walking distance. 12 more projects within 1 km.

New stations nearby

Works and changes that reach this address

Further away, within 1 km (12)
  • Pipes and cables Zentagasse 22 bis 46 pipe laying
    132 m Under construction · works since 31 August 2026, planned until 30 October 2026 Source: Stadt Wien · 7 records · checked 16 October 2026
  • Building WWSPEN-Wohnhaus Spengergasse 45 - Totalsanierung – Umbau und Aufstockung - Generalunternehmer
    181 m Contract awarded · contract period 27 March 2025 – 15 February 2027 Source: TED (EU tenders), Kerndaten (public tenders) · 3 records · checked 10 October 2026· Found automatically. Check with the source.
    History (3)
    1. tender published (TED 636999-2024)
    2. award published (TED 210517-2025)
    3. award published (Kerndaten)
  • Public transport Rechte Wienzeile von Kreuzung Ramperstorffergasse bis Kreuzung Pilgramgasse und Pilgrambrücke U-Bahn construction
    288 m Under construction · works since 28 February 2021, planned until 31 May 2028 · part of U2, 4. Ausbauphase Source: Stadt Wien, TED (EU tenders) · 10 records · checked 16 October 2026
    History (4)
    1. award published (TED 475971-2022)
    2. tender published (TED 829936-2025)
    3. tender published (TED 585716-2026)
    4. listed by the city
  • Public transport Siebenbrunnengasse von Kreuzung Siebenbrunnenplatz und Reinprechtsdorfer Straße bis 44 U-Bahn construction
    332 m Under construction · works since 28 February 2021, planned until 31 December 2026 · part of U2, 4. Ausbauphase Source: Stadt Wien · 7 records · checked 16 October 2026
  • Public transport U-Bahn-Linie U2, Bauabschnitte U2/17-U2/21; Konstruktiver Ingenieurbau, Tunnelbau, Gleisbau
    385 m Contract awarded 16 September 2025 · part of U2, 4. Ausbauphase Source: TED (EU tenders) · 7 records · checked 10 October 2026· Found automatically. Check with the source.
    History (7)
    1. tender published (TED 116012-2019)
    2. notice changed (TED 142519-2019)
    3. award published (TED 28914-2021)
    4. award published (TED 21980-2022)
    5. award published (TED 239588-2022)
    6. award published (TED 606170-2022)
    7. award published (TED 680150-2025)
  • Building 1050 Wien, Reinprechtsdorfer Str. 24-26, Baumeister Teil GU, abgehängte Decke, Bauphase 2025 und 2026
    423 m Contract awarded 8 April 2026 Source: Kerndaten (public tenders) · 10 records · checked 10 October 2026· Found automatically. Check with the source.
    History (10)
    1. award published (Kerndaten)
    2. award published (Kerndaten)
    3. award published (Kerndaten)
    4. award published (Kerndaten)
    5. award published (Kerndaten)
    6. award published (Kerndaten)
    7. award published (Kerndaten)
    8. award published (Kerndaten)
  • Pipes and cables Linke Wienzeile 90-92 sewer works
    656 m Under construction · works since 19 May 2026, planned until 18 December 2026 Source: Stadt Wien · 7 records · checked 16 October 2026
  • Building 1060 Wien, Webg. 2a - Sanierung, Bestandssanierung, Generalsanierung ME 4 / Top 10
    704 m Contract awarded 16 June 2025 Source: Kerndaten (public tenders) · checked 10 October 2026· Found automatically. Check with the source.
  • Building 1050 Wien, Kriehubergasse 26, Zubau Turnsaalzentrum, Fenstersanierung Bestand
    734 m Contract awarded · contract period 3 March 2025 – 2 July 2027 Source: TED (EU tenders), Kerndaten (public tenders) · 56 records · checked 10 October 2026· Found automatically. Check with the source.
    History (56)
    1. award published (Kerndaten)
    2. tender published (TED 749897-2025)
    3. tender published (TED 783968-2025)
    4. award published (TED 166000-2026)
    5. award published (TED 166602-2026)
    6. award published (Kerndaten)
    7. award published (Kerndaten)
    8. award published (Kerndaten)
  • Building KH BHS - MR - Baumeister
    831 m Tendered · contract period 1 March 2027 – 30 June 2028 Source: TED (EU tenders) · 3 records · checked 10 October 2026· Found automatically. Check with the source.
    History (3)
    1. tender published (TED 523155-2026)
    2. tender published (TED 523852-2026)
    3. tender published (TED 525201-2026)
  • Roads and bridges Wende- und Abstellanlage Matzleinsdorfer Platz
    848 m Contract awarded · since 10 January 2024 Source: TED (EU tenders) · 5 records · checked 10 October 2026· Found automatically. Check with the source.
    History (5)
    1. tender published (TED 204996-2022)
    2. tender published (TED 375263-2023)
    3. award published (TED 607779-2023)
    4. tender published (TED 310837-2024)
    5. tender published (TED 243424-2025)
  • Public transport Matzleinsdorfer Platz 3-4 bis 5 U-Bahn construction
    871 m Under construction · works since 27 March 2022, planned until 31 December 2028 · part of U2, 4. Ausbauphase Source: Stadt Wien · 7 records · checked 16 October 2026

From the City of Vienna (construction sites that affect traffic, zoning procedures, building freezes, planned U-Bahn, tram and major roads), public tenders, the Freedom of Information register and environmental impact assessments. We have recorded these sources every day since 10 October 2026. A moved end date shows as a delay. Private building sites appear only where they affect traffic or were tendered publicly.

The address in figures

Noise

Loudest facade (day–evening–night level)
road 70–74 dB
Quiet side
yes

Getting around

Public transport class
A
Nearest stop
Wien Bacherplatz, 1 min walk, every 4 min
Frequent service (every 10 min or more often)
Wien Bacherplatz, 1 min walk, every 4 min

On foot

Supermarket
4 min
Pharmacy
4 min
Doctor's practice
2 min
Crèche
3 min
Kindergarten
3 min
Primary school
1 min
Middle school
2 min
Playground
2 min

Green and air

Green and open land within 300 m
12 %
Nearest park
Bacherpark, 1 min walk
Nearest forest
–
NO₂ / PM2.5, modelled 2022
29.7 / 11.7 µg/m³
Heat days per year, now → around 2050
–

Hazards and rules

Flooding
outside mapped flood areas
Zoning
residential
Protection zones
outside all zones

Residents

Residents within 300 m
6,569 · more densely populated than most of Vienna
Who lives in the neighbourhood
younger residents than in most of Vienna; fewer children and older people

Prices

Apartments, average €/m² by building age
€ 4,325–5,370 (the Margareten district)

The full report explains every figure, chapter by chapter, with what to check before you sign →

Sources: BEV cadastre and address register, Stadt Wien OGD (zoning, flood and protection zones, facility registers), BMLUK noise and flood maps, WLV hazard zones, ÖROK ÖV-Güteklassen 2025, European Environment Agency, Statistik Austria, © OpenStreetMap contributors. CC BY 4.0 / ODbL. Lagecheck processed the data. All sources and licences →