Your address

Rennweg 6

1030 Wien · 3. Landstraße

The outline marks the neighbourhood Rennweg / Prinz-Eugen-Straße area, with 32 addresses.worksplannedzoning change · projects nearby

The LAGE score

This building

Weak · better than 8 % of all addresses in Vienna

The neighbourhood

Rennweg / Prinz-Eugen-Straße area · Weak · Vienna average: 65.

ScoreThis buildingNeighbourhoodVienna
LQuietness 5 587
LAir quality 27 3146
APublic transport 90 10090
GGreen space 100 9853
GNatural hazards 100 100100
EEveryday amenities 100 10097

0–100, higher is better. The neighbourhood and city columns show the average score of all their addresses, scored with the same rules.

LAGE stands for Lärm & Luft (noise & air) · Anbindung (transport links) · Grün & Gefahren (green & hazards) · Erledigungen (everyday errands). How it is calculated →

Set your priorities to see your own LAGE for this building →

The neighbourhood in figures

Loud road facade (≥ 65 dB Lden)
88 % of addresses
Free of mapped noise ≥ 55 dB at the building
6 %
Inside a 30- or 100-year flood area
0 %
Public transport class A or B
97 %
Green & open land within 300 m (average)
43 %
Distance to the nearest park or forest (average)
40 m
Protection zone (Schutzzone)
91 %
Residents
227 · about as densely populated as most of Vienna
The neighbourhood report →

Building works and projects nearby

This address lies beyond the reach of every construction site, zoning change and planned line. 12 more projects within 1 km.

Further away, within 1 km (12)
  • Building 1030 Wien, Rennweg 14 - Gewächshaus, Zufahrt EPO - Baumeisterarbeiten
    316 m Contract awarded 19 May 2025 Source: Kerndaten (public tenders) · 5 records · checked 10 October 2026· Found automatically. Check with the source.
    History (5)
    1. award published (Kerndaten)
    2. award published (Kerndaten)
    3. award published (Kerndaten)
    4. award published (Kerndaten)
    5. award published (Kerndaten)
  • Building 1030 Wien, Marokkanergasse 4, Brandschutzmaßnahmen, Baumeisterarbeiten / Abbrucharbeiten
    389 m Contract awarded 23 June 2026 Source: Kerndaten (public tenders) · 10 records · checked 10 October 2026· Found automatically. Check with the source.
    History (10)
    1. award published (Kerndaten)
    2. award published (Kerndaten)
    3. award published (Kerndaten)
    4. award published (Kerndaten)
    5. award published (Kerndaten)
    6. award published (Kerndaten)
    7. award published (Kerndaten)
    8. award published (Kerndaten)
  • Pipes and cables (ProVia-ID 146380) Schnellbahn Wien AMU210; HF Montagen Tunnelfunk Wiener Schnellbahn Stammstrecke (Wien HBF-Wien Mitte-St.Marx)
    452 m Contract awarded · contract period 1 September 2026 – 31 December 2027 Source: TED (EU tenders) · checked 10 October 2026· Found automatically. Check with the source.
  • Public transport Rennweg von 33A bis 37 track works
    471 m Under construction · works since 30 September 2026, planned until 15 November 2026 Source: Stadt Wien · 7 records · checked 16 October 2026
  • Roads and bridges Arbeiterkammer Wien - Plößlgasse 13 – Baugrubensicherung (Spezialtiefbau), Tiefenbohrungen
    472 m Contract awarded · contract period 3 May 2027 – 3 January 2028 Source: TED (EU tenders), Kerndaten (public tenders) · 4 records · checked 13 October 2026· Found automatically. Check with the source.
    History (4)
    1. award published (Kerndaten)
    2. award published (Kerndaten)
    3. tender published (Kerndaten)
    4. tender published (TED 675946-2026)
  • Building Wien 4., Belvederegasse ONr. 2-42 - Wasserrohrauswechslung - Erd- u. Baumeisterarbeiten
    525 m Contract awarded 10 September 2026 Source: data.gv.at (information requests) · checked 10 October 2026· Found automatically. Check with the source.
  • Zoning change Besucherzentrum Belvedere
    527 m Zoning in progress · draft on public display 12 August 2026 – 23 September 2026; building freeze until 12 March 2027 Source: Stadt Wien · 2 records · checked 16 October 2026
    History (2)
    1. building freeze announced
    2. procedure stage: Nach öffentlicher Auflage
  • Building 1030 Wien, Ungargasse 69, Baumeisterarbeiten 2023
    541 m Contract awarded 21 April 2026 Source: Kerndaten (public tenders) · 30 records · checked 10 October 2026· Found automatically. Check with the source.
    History (30)
    1. award published (Kerndaten)
    2. award published (Kerndaten)
    3. award published (Kerndaten)
    4. award published (Kerndaten)
    5. award published (Kerndaten)
    6. award published (Kerndaten)
    7. award published (Kerndaten)
    8. award published (Kerndaten)
  • Building Lothringerstraße 3 bis 5 site set-up for a building project
    573 m Under construction · works since 2 February 2025, planned until 31 December 2027 Source: Stadt Wien · 7 records · checked 16 October 2026
  • New quarter Karlsplatz
    577 m Approved 2018 Source: Stadt Wien · checked 16 October 2026
  • Building 1040 Wien, Karlsplatz 13- Technische Universität Wien - Fass.-san.-A-Fe Neu(Holz) Mitteltrakt Hof 2 A08)-Baumeisterarbeiten
    577 m Contract awarded 25 March 2026 Source: Kerndaten (public tenders) · 19 records · checked 10 October 2026· Found automatically. Check with the source.
    History (19)
    1. award published (Kerndaten)
    2. award published (Kerndaten)
    3. award published (Kerndaten)
    4. award published (Kerndaten)
    5. award published (Kerndaten)
    6. award published (Kerndaten)
    7. award published (Kerndaten)
    8. award published (Kerndaten)
  • Building 1040 Wien, Argentinierstraße 8/Paniglg. 1-3 - Baumeisterarbeiten
    634 m Contract awarded 24 September 2026 Source: Kerndaten (public tenders) · 4 records · checked 10 October 2026· Found automatically. Check with the source.
    History (4)
    1. award published (Kerndaten)
    2. award published (Kerndaten)
    3. award published (Kerndaten)
    4. award published (Kerndaten)

From the City of Vienna (construction sites that affect traffic, zoning procedures, building freezes, planned U-Bahn, tram and major roads), public tenders, the Freedom of Information register and environmental impact assessments. We have recorded these sources every day since 10 October 2026. A moved end date shows as a delay. Private building sites appear only where they affect traffic or were tendered publicly.

The address in figures

Noise

Loudest facade (day–evening–night level)
road ≥ 75 dB, rail 65–69 dB
Quiet side
yes

Getting around

Public transport class
B
Nearest stop
Wien Unteres Belvedere, 2 min walk, every 7 min
Frequent service (every 10 min or more often)
Wien Unteres Belvedere, 2 min walk, every 7 min

On foot

Supermarket
1 min
Pharmacy
3 min
Doctor's practice
4 min
Crèche
6 min
Kindergarten
6 min
Primary school
5 min
Middle school
9 min
Playground
6 min

Green and air

Green and open land within 300 m
48 %
Nearest park
Belvedere, 1 min walk
Nearest forest
–
NO₂ / PM2.5, modelled 2022
31.9 / 11.6 µg/m³
Heat days per year, now → around 2050
–

Hazards and rules

Flooding
outside mapped flood areas
Zoning
open land
Protection zones
old-town zone, UNESCO World Heritage

Residents

Residents within 300 m
2,006 · about as densely populated as most of Vienna
Who lives in the neighbourhood
more older people; fewer people between 15 and 29

Prices

Apartments, average €/m² by building age
€ 4,538–5,655 (the Landstraße district)

The full report explains every figure, chapter by chapter, with what to check before you sign →

Sources: BEV cadastre and address register, Stadt Wien OGD (zoning, flood and protection zones, facility registers), BMLUK noise and flood maps, WLV hazard zones, ÖROK ÖV-Güteklassen 2025, European Environment Agency, Statistik Austria, © OpenStreetMap contributors. CC BY 4.0 / ODbL. Lagecheck processed the data. All sources and licences →