Your address
Ruzickagasse 51
1230 Wien · 23. Liesing
The LAGE score
This building
Fair · better than 41 % of all addresses in Vienna
The neighbourhood
Ruzickagasse area · Fair · Vienna average: 65.
| Score | This building | Neighbourhood | Vienna |
|---|---|---|---|
| LQuietness | 75 | 87 | 87 |
| LAir quality | 52 | 52 | 46 |
| APublic transport | 90 | 90 | 90 |
| GGreen space | 28 | 33 | 53 |
| GNatural hazards | 100 | 100 | 100 |
| EEveryday amenities | 97 | 96 | 97 |
0–100, higher is better. The neighbourhood and city columns show the average score of all their addresses, scored with the same rules.
LAGE stands for Lärm & Luft (noise & air) · Anbindung (transport links) · Grün & Gefahren (green & hazards) · Erledigungen (everyday errands). How it is calculated →
Set your priorities to see your own LAGE for this building →
The neighbourhood in figures
- Loud road facade (≥ 65 dB Lden)
- 17 % of addresses
- Free of mapped noise ≥ 55 dB at the building
- 30 %
- Inside a 30- or 100-year flood area
- 0 %
- Public transport class A or B
- 98 %
- Green & open land within 300 m (average)
- 2 %
- Distance to the nearest park or forest (average)
- 264 m
- Protection zone (Schutzzone)
- 2 %
- Residents
- 860 · about as densely populated as most of Vienna
Building works and projects nearby
This address lies beyond the reach of every construction site, zoning change and planned line. 8 more projects within 1 km.
Further away, within 1 km (8)
-
Pipes and cables Endresstraße von 24-26 bis ggü. 24-26 pipe laying341 m Under construction · works since 28 June 2026, planned until 27 November 2026 Source: Stadt Wien · 7 records · checked 16 October 2026
-
Building Errichtung von Aufzugsanlagen für die neue Schwimmhalle341 m Contract awarded · contract period 1 September 2025 – 29 October 2027 Source: TED (EU tenders) · 10 records · checked 10 October 2026· Found automatically. Check with the source.
History (10)
- tender published (TED 447195-2025)
- tender published (TED 456614-2025)
- tender published (TED 501066-2025)
- tender published (TED 508680-2025)
- tender published (TED 509817-2025)
- tender published (TED 510561-2025)
- award published (TED 691560-2025)
- award published (TED 694055-2025)
-
Pipes and cables Knotzenbachgasse von Kreuzung Endresstraße und Khemetergasse bis Kreuzung Dirmhirngasse pipe laying373 m Under construction · works since 28 June 2026, planned until 27 November 2026 Source: Stadt Wien · 7 records · checked 16 October 2026
-
Building 23., Marktgemeindegasse 44-50620 m Contract awarded · contract period 18 August 2025 – 10 July 2027 · end moved 56 days later since first listed Source: TED (EU tenders) · 22 records · checked 10 October 2026· Found automatically. Check with the source.
History (22)
- award published (TED 373205-2025)
- award published (TED 409709-2025)
- award published (TED 416651-2025)
- award published (TED 424852-2025)
- award published (TED 462356-2025)
- award published (TED 641353-2025)
- award published (TED 695097-2025)
- award published (TED 193717-2026)
-
Building Wien 23., Wastlgasse, Lainergasse, Pantlitschkogasse, Tullnertalgasse, Stieglergasse, Atzgersdorfer Straße - Erd- u. Baumeisterarbeiten728 m Contract awarded 17 August 2026 Source: data.gv.at (information requests) · checked 10 October 2026· Found automatically. Check with the source.
-
New quarter Hödlgasse798 m Approved 2018 Source: Stadt Wien · checked 16 October 2026
-
Building 13., Am Rosenberg 1818 m Contract awarded · contract period 21 April 2025 – 21 December 2026 Source: TED (EU tenders) · 34 records · checked 10 October 2026· Found automatically. Check with the source.
History (34)
- award published (TED 540474-2023)
- tender published (TED 541945-2023)
- award published (TED 587786-2023)
- award published (TED 627988-2023)
- tender published (TED 273114-2024)
- tender published (TED 319131-2024)
- tender published (TED 704172-2024)
- award published (TED 262968-2025)
-
New quarter Ziedlergasse 21984 m Approved 2018 Source: Stadt Wien · checked 16 October 2026
From the City of Vienna (construction sites that affect traffic, zoning procedures, building freezes, planned U-Bahn, tram and major roads), public tenders, the Freedom of Information register and environmental impact assessments. We have recorded these sources every day since 10 October 2026. A moved end date shows as a delay. Private building sites appear only where they affect traffic or were tendered publicly.
All projects in Vienna → Know of a project that is missing? Tell us
The address in figures
Noise
- Loudest facade (day–evening–night level)
- road 55–59 dB
- Quiet side
- no
Getting around
- Public transport class
- B
- Nearest stop
- Wien Taglieberstraße, 1 min walk, every 5 min
- Frequent service (every 10 min or more often)
- Wien Taglieberstraße, 1 min walk, every 5 min
On foot
- Supermarket
- 7 min
- Pharmacy
- 6 min
- Doctor's practice
- 5 min
- Crèche
- 7 min
- Kindergarten
- 3 min
- Primary school
- 5 min
- Middle school
- 12 min
- Playground
- 5 min
Green and air
- Green and open land within 300 m
- 1 %
- Nearest park
- Parkanlage Pölleritzergasse, 5 min walk
- Nearest forest
- –
- NO₂ / PM2.5, modelled 2022
- 24.3 / 10.7 µg/m³
- Heat days per year, now → around 2050
- –
Hazards and rules
- Flooding
- outside mapped flood areas
- Zoning
- residential
- Protection zones
- outside all zones
Residents
- Residents within 300 m
- 1,806 · about as densely populated as most of Vienna
- Who lives in the neighbourhood
- older residents than in most of Vienna; more older people; fewer people between 15 and 29
Prices
- Apartments, average €/m² by building age
- € 3,251–4,810 (the Liesing district)
The full report explains every figure, chapter by chapter, with what to check before you sign →
Sources: BEV cadastre and address register, Stadt Wien OGD (zoning, flood and protection zones, facility registers), BMLUK noise and flood maps, WLV hazard zones, ÖROK ÖV-Güteklassen 2025, European Environment Agency, Statistik Austria, © OpenStreetMap contributors. CC BY 4.0 / ODbL. Lagecheck processed the data. All sources and licences →