Your address

Scheidlstraße 31

1180 Wien · 18. Währing

The outline marks the neighbourhood Scheidlstraße area, with 111 addresses.worksplannedzoning change · projects nearby

The LAGE score

This building

Fair · better than 47 % of all addresses in Vienna

The neighbourhood

Scheidlstraße area · Fair · Vienna average: 65.

ScoreThis buildingNeighbourhoodVienna
LQuietness 87 8787
LAir quality 40 4046
APublic transport 90 10090
GGreen space 33 3553
GNatural hazards 100 100100
EEveryday amenities 100 10097

0–100, higher is better. The neighbourhood and city columns show the average score of all their addresses, scored with the same rules.

LAGE stands for Lärm & Luft (noise & air) · Anbindung (transport links) · Grün & Gefahren (green & hazards) · Erledigungen (everyday errands). How it is calculated →

Set your priorities to see your own LAGE for this building →

The neighbourhood in figures

Loud road facade (≥ 65 dB Lden)
11 % of addresses
Free of mapped noise ≥ 55 dB at the building
1 %
Inside a 30- or 100-year flood area
0 %
Public transport class A or B
100 %
Green & open land within 300 m (average)
6 %
Distance to the nearest park or forest (average)
367 m
Residents
396 · about as densely populated as most of Vienna
The neighbourhood report →

Building works and projects nearby

This address lies beyond the reach of every construction site, zoning change and planned line. 11 more projects within 1 km.

Further away, within 1 km (11)
  • Pipes and cables Lidlgasse 1 bis 7 pipe laying
    389 m Under construction · works since 13 July 2026, planned until 17 September 2027 Source: Stadt Wien · 7 records · checked 16 October 2026
  • Building Transportrohrstrang 5. HL-BA02 PH01 DN/ID 800 - 1170 Wien, Wattgasse - Lidlgasse 1-7
    396 m Tendered · contract period 23 February 2026 – 1 September 2027 Source: TED (EU tenders) · 4 records · checked 10 October 2026· Found automatically. Check with the source.
    History (4)
    1. tender published (TED 798007-2025)
    2. tender published (TED 839822-2025)
    3. tender published (TED 108964-2026)
    4. tender published (TED 158861-2026)
  • Building 1180 Wien, Bastiengasse 26, Funktionsadaptierung und Sanierung des historischen Bestandes Semmelweisareal Haus 1, Gefährlicher Abbruch
    580 m Contract awarded 24 June 2026 Source: Kerndaten (public tenders) · 31 records · checked 10 October 2026· Found automatically. Check with the source.
    History (31)
    1. award published (Kerndaten)
    2. award published (Kerndaten)
    3. award published (Kerndaten)
    4. award published (Kerndaten)
    5. award published (Kerndaten)
    6. award published (Kerndaten)
    7. award published (Kerndaten)
    8. award published (Kerndaten)
  • Building Stadt Wien - Wiener Wohnen - 18., Hockegasse 9 - Baumeister
    624 m Contract awarded 10 February 2025 Source: Kerndaten (public tenders) · 7 records · checked 10 October 2026· Found automatically. Check with the source.
    History (7)
    1. award published (Kerndaten)
    2. award published (Kerndaten)
    3. award published (Kerndaten)
    4. award published (Kerndaten)
    5. award published (Kerndaten)
    6. award published (Kerndaten)
    7. award published (Kerndaten)
  • Zoning change Gersthofer Straße
    631 m Zoning in progress · draft on public display 6 May 2026 – 17 June 2026; building freeze until 6 December 2026 Source: Stadt Wien · 2 records · checked 16 October 2026
    History (2)
    1. building freeze announced
    2. procedure stage: Vor Genehmigt
  • Building 1180 Wien, Bastiengasse 36, Funktionsadaptierung und Sanierung des historischen Bestandes Semmelweisareal Haus 1, Baumeisterarbeiten
    698 m Contract awarded · contract period 15 July 2024 – 16 October 2026 Source: TED (EU tenders) · 18 records · checked 10 October 2026· Found automatically. Check with the source.
    History (18)
    1. tender published (TED 508153-2024)
    2. award published (TED 648303-2024)
    3. tender published (TED 718469-2024)
    4. award published (TED 59140-2025)
    5. tender published (TED 346904-2025)
    6. award published (TED 407324-2025)
    7. tender published (TED 800384-2025)
    8. award published (TED 146886-2026)
  • Building Stadt Wien - Wiener Wohnen - 18., Lacknergasse 96 - Baumeister
    706 m Contract awarded 25 June 2026 Source: Kerndaten (public tenders) · 20 records · checked 10 October 2026· Found automatically. Check with the source.
    History (20)
    1. award published (Kerndaten)
    2. award published (Kerndaten)
    3. award published (Kerndaten)
    4. award published (Kerndaten)
    5. award published (Kerndaten)
    6. award published (Kerndaten)
    7. award published (Kerndaten)
    8. award published (Kerndaten)
  • Building 1180 Wien, Klostergasse 25, Funktionssanierung und Erweiterung AHS Klostergasse, Baumeisterarbeiten
    769 m Contract awarded · contract period 1 September 2024 – 30 October 2026 · end moved 183 days later since first listed Source: TED (EU tenders) · 22 records · checked 10 October 2026· Found automatically. Check with the source.
    History (22)
    1. tender published (TED 110884-2025)
    2. award published (TED 233865-2025)
    3. tender published (TED 381244-2025)
    4. tender published (TED 429755-2025)
    5. award published (TED 500364-2025)
    6. award published (TED 500427-2025)
    7. award published (TED 635578-2025)
    8. award published (TED 635897-2025)
  • Pipes and cables Wien 16., /17., Sandleiteng. # Nietzschepl. über Güpferlingstr. b. Alszeile # Grünbeckweg + 17., Alszeile v. # Güpferlingstr. b. # Alsg. – Wasserrohrausw.
    795 m Tendered · contract period 11 January 2027 – 30 November 2027 Source: TED (EU tenders) · 2 records · checked 16 October 2026· Found automatically. Check with the source.
    History (2)
    1. tender published (TED 716974-2026)
    2. tender published (TED 717965-2026)
  • Public transport U5, 5. Ausbauphase
    893 m Planned · opening planned for 2035 Source: Stadt Wien · 42 records · checked 16 October 2026
  • Public transport Linie 10: Hernals
    988 m Planned Source: Stadt Wien · 7 records · checked 16 October 2026

From the City of Vienna (construction sites that affect traffic, zoning procedures, building freezes, planned U-Bahn, tram and major roads), public tenders, the Freedom of Information register and environmental impact assessments. We have recorded these sources every day since 10 October 2026. A moved end date shows as a delay. Private building sites appear only where they affect traffic or were tendered publicly.

The address in figures

Noise

Loudest facade (day–evening–night level)
road 55–59 dB
Quiet side
yes

Getting around

Public transport class
B
Nearest stop
Wien Alsegger Straße/Czartoryskigasse, 1 min walk, every 19 min
Frequent service (every 10 min or more often)
Wien Alsegger Straße, 4 min walk, every 9 min

On foot

Supermarket
3 min
Pharmacy
4 min
Doctor's practice
4 min
Crèche
5 min
Kindergarten
5 min
Primary school
4 min
Middle school
9 min
Playground
6 min

Green and air

Green and open land within 300 m
5 %
Nearest park
Christine-Nöstlinger-Park, 6 min walk
Nearest forest
unnamed, 9 min walk
NO₂ / PM2.5, modelled 2022
27.9 / 11.3 µg/m³
Heat days per year, now → around 2050
–

Hazards and rules

Flooding
outside mapped flood areas
Zoning
residential
Protection zones
outside all zones

Residents

Residents within 300 m
2,413 · about as densely populated as most of Vienna
Who lives in the neighbourhood
older residents than in most of Vienna; more older people

Prices

Apartments, average €/m² by building age
€ 4,470–5,735 (the Währing district)

The full report explains every figure, chapter by chapter, with what to check before you sign →

Sources: BEV cadastre and address register, Stadt Wien OGD (zoning, flood and protection zones, facility registers), BMLUK noise and flood maps, WLV hazard zones, ÖROK ÖV-Güteklassen 2025, European Environment Agency, Statistik Austria, © OpenStreetMap contributors. CC BY 4.0 / ODbL. Lagecheck processed the data. All sources and licences →