Your address

Schweidlgasse 38

1020 Wien · 2. Leopoldstadt

The outline marks the neighbourhood Bruno-Marek-Allee area, with 294 addresses.worksplannedzoning change · projects nearby

The LAGE score

This building

Good · better than 77 % of all addresses in Vienna

The neighbourhood

Bruno-Marek-Allee area · Fair · Vienna average: 65.

ScoreThis buildingNeighbourhoodVienna
LQuietness 95 7587
LAir quality 32 3246
APublic transport 90 9090
GGreen space 72 6453
GNatural hazards 100 100100
EEveryday amenities 99 10097

0–100, higher is better. The neighbourhood and city columns show the average score of all their addresses, scored with the same rules.

LAGE stands for Lärm & Luft (noise & air) · Anbindung (transport links) · Grün & Gefahren (green & hazards) · Erledigungen (everyday errands). How it is calculated →

Set your priorities to see your own LAGE for this building →

The neighbourhood in figures

Loud road facade (≥ 65 dB Lden)
22 % of addresses
Free of mapped noise ≥ 55 dB at the building
16 %
Inside a 30- or 100-year flood area
0 %
Public transport class A or B
99 %
Green & open land within 300 m (average)
19 %
Distance to the nearest park or forest (average)
75 m
Residents
15,764 · more densely populated than most of Vienna
The neighbourhood report →

Building works and projects nearby

This address lies beyond the reach of every construction site, zoning change and planned line. 12 more projects within 1 km.

Further away, within 1 km (12)
  • Pipes and cables Nordbahnstraße von Alliiertenstraße bis Am Tabor pipe laying
    445 m Under construction · works since 26 July 2026, planned until 1 November 2026 Source: Stadt Wien · 7 records · checked 16 October 2026
  • Zoning change Nordbahnhof-Innstraße
    544 m Zoning in progress · draft on public display 12 August 2026 – 23 September 2026; building freeze until 12 March 2027 Source: Stadt Wien · 2 records · checked 16 October 2026
    History (2)
    1. building freeze announced
    2. procedure stage: Nach öffentlicher Auflage
  • Building Stadt Wien - Wiener Wohnen - 02., Mexikoplatz 25 - Baumeister
    564 m Contract awarded 25 June 2025 Source: Kerndaten (public tenders) · 9 records · checked 10 October 2026· Found automatically. Check with the source.
    History (9)
    1. award published (Kerndaten)
    2. award published (Kerndaten)
    3. award published (Kerndaten)
    4. award published (Kerndaten)
    5. award published (Kerndaten)
    6. award published (Kerndaten)
    7. award published (Kerndaten)
    8. award published (Kerndaten)
  • Zoning change Plandokument 8461: Gebiet zwischen Innstraße (Bezirksgrenze), Linienzug 1-2 (Trasse ÖBB Nordbahn), Linienzug 2-3, Nordbahnstraße (Bezirksgrenze) und Dresdner St
    579 m Zoning in progress 25 November 2025 Source: data.gv.at (information requests) · checked 10 October 2026
  • New quarter 20., Nordwestbahnhof – Phase A.1
    633 m Planned · developer competition 2025 · 520 flats Source: Stadt Wien · checked 16 October 2026
  • Roads and bridges (ProVia-ID 116375) Technische Freimachung Wien Nordwestbahnhof; Abbrucharbeiten
    640 m Contract awarded · contract period 2 September 2024 – 1 September 2028 Source: TED (EU tenders) · 2 records · checked 10 October 2026· Found automatically. Check with the source.
    History (2)
    1. tender published (TED 281451-2024)
    2. award published (TED 492315-2024)
  • Building 02., Lassallestraße 40
    670 m Tendered · contract period 15 March 2027 – 15 May 2030 Source: TED (EU tenders) · 2 records · checked 16 October 2026· Found automatically. Check with the source.
    History (2)
    1. tender published (TED 617155-2026)
    2. tender published (TED 707498-2026)
  • Building 20., Nordwestbahnhof – Phase A.2
    700 m Tendered · 100 flats Source: Stadt Wien · checked 16 October 2026
  • Building 02., Radingerstraße 21 - Baumeister- und Fenstertauscharbeiten
    737 m Contract awarded 21 September 2026 Source: Kerndaten (public tenders) · 7 records · checked 15 October 2026· Found automatically. Check with the source.
    History (7)
    1. award published (Kerndaten)
    2. award published (Kerndaten)
    3. award published (Kerndaten)
    4. award published (Kerndaten)
    5. award published (Kerndaten)
    6. award published (Kerndaten)
    7. tender published (Kerndaten)
  • Building BAUI.IM6009: Technische Freimachung Wien Nordwestbahnhof - Abbrucharbeiten
    777 m Contract awarded 28 September 2026 Source: Kerndaten (public tenders) · 4 records · checked 12 October 2026· Found automatically. Check with the source.
    History (4)
    1. award published (Kerndaten)
    2. award published (Kerndaten)
    3. award published (Kerndaten)
    4. award published (Kerndaten)
  • Building PPP-Projekt Bildungscampus Nordwestbahnhof (BC NWBHF Planung, Errichtung, Finanzierung und Verfügbarhaltung) Adresse: 20., Rebhanngasse
    777 m Contract awarded · since 1 June 2026 Source: TED (EU tenders) · 2 records · checked 10 October 2026· Found automatically. Check with the source.
    History (2)
    1. tender published (TED 587888-2024)
    2. award published (TED 326240-2026)
  • Public transport ÖBB Wohnprogramm, 1020 Wien, Mühlfeldgasse 15 & 16 - Generalunternehmerleistungen Bau
    784 m Contract awarded 23 June 2025 Source: Kerndaten (public tenders) · checked 10 October 2026· Found automatically. Check with the source.

From the City of Vienna (construction sites that affect traffic, zoning procedures, building freezes, planned U-Bahn, tram and major roads), public tenders, the Freedom of Information register and environmental impact assessments. We have recorded these sources every day since 10 October 2026. A moved end date shows as a delay. Private building sites appear only where they affect traffic or were tendered publicly.

The address in figures

Noise

Loudest facade (day–evening–night level)
below 55 dB
Quiet side
–

Getting around

Public transport class
B
Nearest stop
Wien Haussteinstraße, 3 min walk, every 8 min
Frequent service (every 10 min or more often)
Wien Haussteinstraße, 3 min walk, every 8 min

On foot

Supermarket
3 min
Pharmacy
4 min
Doctor's practice
3 min
Crèche
2 min
Kindergarten
2 min
Primary school
3 min
Middle school
3 min
Playground
1 min

Green and air

Green and open land within 300 m
22 %
Nearest park
unnamed, 1 min walk
Nearest forest
unnamed, 7 min walk
NO₂ / PM2.5, modelled 2022
30.4 / 11.6 µg/m³
Heat days per year, now → around 2050
–

Hazards and rules

Flooding
outside mapped flood areas
Zoning
residential
Protection zones
outside all zones

Residents

Residents within 300 m
7,522 · very densely populated for Vienna
Who lives in the neighbourhood
younger residents than in most of Vienna; more children; fewer older people

Prices

Apartments, average €/m² by building age
€ 4,603–6,369 (the Leopoldstadt district)

The full report explains every figure, chapter by chapter, with what to check before you sign →

Sources: BEV cadastre and address register, Stadt Wien OGD (zoning, flood and protection zones, facility registers), BMLUK noise and flood maps, WLV hazard zones, ÖROK ÖV-Güteklassen 2025, European Environment Agency, Statistik Austria, © OpenStreetMap contributors. CC BY 4.0 / ODbL. Lagecheck processed the data. All sources and licences →