Your address
Seidlgasse 15
1030 Wien · 3. Landstraße
The LAGE score
This building
Modest · better than 24 % of all addresses in Vienna
The neighbourhood
Blattgasse area · Modest · Vienna average: 65.
| Score | This building | Neighbourhood | Vienna |
|---|---|---|---|
| LQuietness | 87 | 67 | 87 |
| LAir quality | 29 | 29 | 46 |
| APublic transport | 90 | 90 | 90 |
| GGreen space | 20 | 24 | 53 |
| GNatural hazards | 100 | 100 | 100 |
| EEveryday amenities | 100 | 100 | 97 |
0–100, higher is better. The neighbourhood and city columns show the average score of all their addresses, scored with the same rules.
LAGE stands for Lärm & Luft (noise & air) · Anbindung (transport links) · Grün & Gefahren (green & hazards) · Erledigungen (everyday errands). How it is calculated →
Set your priorities to see your own LAGE for this building →
The neighbourhood in figures
- Loud road facade (≥ 65 dB Lden)
- 27 % of addresses
- Free of mapped noise ≥ 55 dB at the building
- 1 %
- Inside a 30- or 100-year flood area
- 0 %
- Public transport class A or B
- 100 %
- Green & open land within 300 m (average)
- 4 %
- Distance to the nearest park or forest (average)
- 524 m
- Protection zone (Schutzzone)
- 88 %
- Residents
- 1,649 · very densely populated for Vienna
Building works and projects nearby
This address lies beyond the reach of every construction site, zoning change and planned line. 12 more projects within 1 km.
Further away, within 1 km (12)
-
Building Stadt Wien - Wiener Wohnen - 03., Lorbeergasse 6- Baumeister183 m Contract awarded 23 July 2025 Source: Kerndaten (public tenders) · 6 records · checked 10 October 2026· Found automatically. Check with the source.
History (6)
- award published (Kerndaten)
- award published (Kerndaten)
- award published (Kerndaten)
- award published (Kerndaten)
- award published (Kerndaten)
- award published (Kerndaten)
-
Building 1030 Wien, Hetzgasse 2, Fassadensanierung - Baumeisterarbeiten und WDVS355 m Tendered 14 October 2026 Source: Kerndaten (public tenders) · checked 15 October 2026· Found automatically. Check with the source.
-
Pipes and cables Rotundenbrücke von Kreuzung Schüttelstraße und Wittelsbachstraße bis Kreuzung Erdberger Lände und We pipe laying454 m Under construction · works since 14 September 2026, planned until 31 January 2027 Source: Stadt Wien · 7 records · checked 16 October 2026
-
Public transport Vordere Zollamtsstraße von Marxergasse und Kleine Marxerbrücke bis Unbenannte Verkehrsfläche und Rad track works489 m Under construction · works since 1 February 2026, planned until 30 November 2026 Source: Stadt Wien · 7 records · checked 16 October 2026
-
Roads and bridges Große Ungarbrücke von Kreuzung Rechte Bahngasse und Am Heumarkt und Am Stadtpark bis Kreuzung Ungarg bridge works552 m Under construction · works since 16 August 2026, planned until 31 July 2027 Source: Stadt Wien · 7 records · checked 16 October 2026
-
Building 1020 Wien Böcklinstraße 1- Dekarbonisierung Raus aus Gas Baumeisterarbeiten_Teil-GU557 m Contract awarded 30 June 2025 Source: Kerndaten (public tenders) · 2 records · checked 10 October 2026· Found automatically. Check with the source.
History (2)
- award published (Kerndaten)
- award published (Kerndaten)
-
Pipes and cables (ProVia-ID 146380) Schnellbahn Wien AMU210; HF Montagen Tunnelfunk Wiener Schnellbahn Stammstrecke (Wien HBF-Wien Mitte-St.Marx)565 m Contract awarded · contract period 1 September 2026 – 31 December 2027 Source: TED (EU tenders) · checked 10 October 2026· Found automatically. Check with the source.
-
Pipes and cables Wittelsbachstraße von Kreuzung Schüttelstraße und Rotundenbrücke bis Kreuzung Böcklinstraße pipe laying567 m Under construction · works since 14 September 2026, planned until 31 January 2027 Source: Stadt Wien · 7 records · checked 16 October 2026
-
Building Wien 2., Wittelsbachstr. v. Rotundenbrücke b. Böcklinstraße u. 3., Plateau Rasumofskyg. / Rotundenbrücke / Weißgerberlände - Erd- u. Baumeisterarbeiten584 m Contract awarded 17 August 2026 Source: data.gv.at (information requests) · 2 records · checked 10 October 2026· Found automatically. Check with the source.
History (2)
- award published (IFG)
- award published (IFG)
-
Building 1020 Wien, Wittelsbachstraße 5, Thermische Sanierung inkl. Dekabonisierung, Bundes-Blindeninstitut, Baumeister Teil-GU645 m Contract awarded 25 September 2026 Source: Kerndaten (public tenders) · 3 records · checked 10 October 2026· Found automatically. Check with the source.
History (3)
- award published (Kerndaten)
- award published (Kerndaten)
- award published (Kerndaten)
-
Roads and bridges Schüttelstraße von 9 bis 3 works on a special structure667 m Under construction · works since 14 September 2026, planned until 15 November 2026 Source: Stadt Wien · 7 records · checked 16 October 2026
-
Building 1010 Wien, Wollzeile 27A, ASCC – Austrian Science Communication Center - Teil-GU Bau970 m Contract awarded · contract period 10 April 2026 – 28 February 2027 · end moved 6 days later since first listed Source: TED (EU tenders) · 9 records · checked 10 October 2026· Found automatically. Check with the source.
History (9)
- tender published (TED 109035-2026)
- tender published (TED 133461-2026)
- tender published (TED 229603-2026)
- tender published (TED 292148-2026)
- tender published (TED 310314-2026)
- award published (TED 470005-2026)
- award published (TED 504962-2026)
- award published (TED 505127-2026)
From the City of Vienna (construction sites that affect traffic, zoning procedures, building freezes, planned U-Bahn, tram and major roads), public tenders, the Freedom of Information register and environmental impact assessments. We have recorded these sources every day since 10 October 2026. A moved end date shows as a delay. Private building sites appear only where they affect traffic or were tendered publicly.
All projects in Vienna → Know of a project that is missing? Tell us
The address in figures
Noise
- Loudest facade (day–evening–night level)
- road 55–59 dB
- Quiet side
- yes
Getting around
- Public transport class
- B
- Nearest stop
- Wien Hetzgasse, 3 min walk, every 7 min
- Frequent service (every 10 min or more often)
- Wien Hetzgasse, 3 min walk, every 7 min
On foot
- Supermarket
- 4 min
- Pharmacy
- 2 min
- Doctor's practice
- 3 min
- Crèche
- 1 min
- Kindergarten
- 1 min
- Primary school
- 5 min
- Middle school
- 7 min
- Playground
- 1 min
Green and air
- Green and open land within 300 m
- 3 %
- Nearest park
- Herrmannpark, 9 min walk
- Nearest forest
- unnamed, 12 min walk
- NO₂ / PM2.5, modelled 2022
- 31.2 / 11.7 µg/m³
- Heat days per year, now → around 2050
- –
Hazards and rules
- Flooding
- outside mapped flood areas
- Zoning
- residential
- Protection zones
- outside all zones
Residents
- Residents within 300 m
- 6,618 · more densely populated than most of Vienna
- Who lives in the neighbourhood
- a typical age mix for Vienna
Prices
- Apartments, average €/m² by building age
- € 4,538–5,655 (the Landstraße district)
The full report explains every figure, chapter by chapter, with what to check before you sign →
Sources: BEV cadastre and address register, Stadt Wien OGD (zoning, flood and protection zones, facility registers), BMLUK noise and flood maps, WLV hazard zones, ÖROK ÖV-Güteklassen 2025, European Environment Agency, Statistik Austria, © OpenStreetMap contributors. CC BY 4.0 / ODbL. Lagecheck processed the data. All sources and licences →