Your address

Siccardsburggasse 18

1100 Wien · 10. Favoriten

The outline marks the neighbourhood Hasengasse area, with 111 addresses.worksplannedzoning change · projects nearby

The LAGE score

This building

Weak · better than 17 % of all addresses in Vienna

The neighbourhood

Hasengasse area · Modest · Vienna average: 65.

ScoreThis buildingNeighbourhoodVienna
LQuietness 17 6787
LAir quality 41 1246
APublic transport 100 9090
GGreen space 39 4853
GNatural hazards 100 100100
EEveryday amenities 100 10097

0–100, higher is better. The neighbourhood and city columns show the average score of all their addresses, scored with the same rules.

LAGE stands for Lärm & Luft (noise & air) · Anbindung (transport links) · Grün & Gefahren (green & hazards) · Erledigungen (everyday errands). How it is calculated →

Set your priorities to see your own LAGE for this building →

The neighbourhood in figures

Loud road facade (≥ 65 dB Lden)
30 % of addresses
Free of mapped noise ≥ 55 dB at the building
0 %
Inside a 30- or 100-year flood area
0 %
Public transport class A or B
100 %
Green & open land within 300 m (average)
8 %
Distance to the nearest park or forest (average)
127 m
Residents
1,923 · very densely populated for Vienna
The neighbourhood report →

Building works and projects nearby

1 project reaches this address. 12 more projects within 1 km.

Works and changes that reach this address

Further away, within 1 km (12)
  • Building Favoritenstraße 2026 - U1 Abdichtungssanierung Landgutgasse bis Gudrunstraße – Baumeisterarbeiten, 1100 Wien - WLI62-fpro-14-25
    277 m Tendered · contract period 7 January 2026 – 13 November 2026 Source: TED (EU tenders) · checked 10 October 2026· Found automatically. Check with the source.
  • Roads and bridges Favoritenstraße von Kreuzung Landgutgasse bis Kreuzung Keplerplatz und Keplergasse road works
    381 m Under construction · works since 19 April 2026, planned until 15 November 2026 Source: Stadt Wien · 7 records · checked 16 October 2026
  • Public transport (ProVia-ID 143384) ÖBB Inventarhalle - 1100 Wien Neues Landgut; Generalunternehmerleistungen
    384 m Contract awarded · contract period 6 April 2026 – 29 November 2027 Source: TED (EU tenders) · 3 records · checked 10 October 2026· Found automatically. Check with the source.
    History (3)
    1. tender published (TED 759744-2025)
    2. tender published (TED 794248-2025)
    3. award published (TED 654425-2026)
  • Public transport (ProVia-ID 135222) ÖBB Wohnprogramm, 1100 Wien, Karl-Merkatz-Gasse 8-10, NLBF11; Generalunternehmerleistungen
    415 m Contract awarded · contract period 7 January 2026 – 22 December 2027 Source: TED (EU tenders), Kerndaten (public tenders) · 4 records · checked 10 October 2026· Found automatically. Check with the source.
    History (4)
    1. tender published (TED 273526-2025)
    2. award published (Kerndaten)
    3. award published (Kerndaten)
    4. award published (TED 20293-2026)
  • Building 1100 Wien, Keplergasse 10, BMI / PI Keplerg. 10 - Abbruch/Neubau; Teil-GU Baumeisterarbeiten, Zimmererarbeiten
    450 m Contract awarded · contract period 29 April 2026 – 31 October 2027 Source: TED (EU tenders), Kerndaten (public tenders) · 37 records · checked 15 October 2026· Found automatically. Check with the source.
    History (37)
    1. award published (Kerndaten)
    2. award published (Kerndaten)
    3. award published (Kerndaten)
    4. award published (Kerndaten)
    5. award published (TED 663188-2026)
    6. award published (Kerndaten)
    7. tender published (Kerndaten)
    8. tender published (Kerndaten)
  • Public transport Zweigleisiger Ausbau der Pottendorfer Linie Abschnitt Wien Meidling - Abzweigung Altmannsdorf (ÖBB Strecken, 10601, 10615, 10616)
    550 m Approved 2021 Source: Umweltbundesamt (environmental impact assessment) · checked 16 October 2026 · route © OpenStreetMap contributors
  • Public transport U2, 4. Ausbauphase
    891 m Under construction · opening planned for 2030 Source: Stadt Wien · 42 records · checked 16 October 2026
  • Public transport U2, 5. Ausbauphase
    895 m Planned · opening planned for 2035 Source: Stadt Wien · 21 records · checked 16 October 2026
  • Building Stadt Wien - Wiener Wohnen - 10., Friesenplatz 1-2 - Baumeister
    915 m Contract awarded · contract period 5 August 2024 – 1 November 2027 · end moved 995 days later since first listed Source: TED (EU tenders), Kerndaten (public tenders) · 36 records · checked 10 October 2026· Found automatically. Check with the source.
    History (36)
    1. award published (Kerndaten)
    2. award published (TED 148035-2025)
    3. award published (Kerndaten)
    4. award published (TED 310710-2025)
    5. award published (Kerndaten)
    6. tender published (TED 701413-2025)
    7. award published (Kerndaten)
    8. award published (TED 373598-2026)
  • Building 1050 Wien, Kriehubergasse 26, Zubau Turnsaalzentrum, Fenstersanierung Bestand
    949 m Contract awarded · contract period 3 March 2025 – 2 July 2027 Source: TED (EU tenders), Kerndaten (public tenders) · 56 records · checked 10 October 2026· Found automatically. Check with the source.
    History (56)
    1. award published (Kerndaten)
    2. tender published (TED 749897-2025)
    3. tender published (TED 783968-2025)
    4. award published (TED 166000-2026)
    5. award published (TED 166602-2026)
    6. award published (Kerndaten)
    7. award published (Kerndaten)
    8. award published (Kerndaten)
  • Roads and bridges Wende- und Abstellanlage Matzleinsdorfer Platz
    954 m Contract awarded · since 10 January 2024 Source: TED (EU tenders) · 5 records · checked 10 October 2026· Found automatically. Check with the source.
    History (5)
    1. tender published (TED 204996-2022)
    2. tender published (TED 375263-2023)
    3. award published (TED 607779-2023)
    4. tender published (TED 310837-2024)
    5. tender published (TED 243424-2025)
  • Public transport Matzleinsdorfer Platz 3-4 bis 5 U-Bahn construction
    955 m Under construction · works since 27 March 2022, planned until 31 December 2028 · part of U2, 4. Ausbauphase Source: Stadt Wien · 7 records · checked 16 October 2026

From the City of Vienna (construction sites that affect traffic, zoning procedures, building freezes, planned U-Bahn, tram and major roads), public tenders, the Freedom of Information register and environmental impact assessments. We have recorded these sources every day since 10 October 2026. A moved end date shows as a delay. Private building sites appear only where they affect traffic or were tendered publicly.

The address in figures

Noise

Loudest facade (day–evening–night level)
road 70–74 dB
Quiet side
yes

Getting around

Public transport class
A
Nearest stop
Wien Erlachplatz, 2 min walk, every 6 min
Frequent service (every 10 min or more often)
Wien Erlachplatz, 2 min walk, every 6 min

On foot

Supermarket
1 min
Pharmacy
2 min
Doctor's practice
3 min
Crèche
2 min
Kindergarten
2 min
Primary school
4 min
Middle school
5 min
Playground
3 min

Green and air

Green and open land within 300 m
3 %
Nearest park
Erlachpark, 2 min walk
Nearest forest
–
NO₂ / PM2.5, modelled 2022
27.6 / 11.4 µg/m³
Heat days per year, now → around 2050
–

Hazards and rules

Flooding
outside mapped flood areas
Zoning
commercial
Protection zones
outside all zones

Residents

Residents within 300 m
6,955 · very densely populated for Vienna
Who lives in the neighbourhood
younger residents than in most of Vienna; more people between 15 and 29

Prices

Apartments, average €/m² by building age
€ 3,024–4,354 (the Favoriten district)

The full report explains every figure, chapter by chapter, with what to check before you sign →

Sources: BEV cadastre and address register, Stadt Wien OGD (zoning, flood and protection zones, facility registers), BMLUK noise and flood maps, WLV hazard zones, ÖROK ÖV-Güteklassen 2025, European Environment Agency, Statistik Austria, © OpenStreetMap contributors. CC BY 4.0 / ODbL. Lagecheck processed the data. All sources and licences →