Your address

Siebenbrunnengasse 90 - 92

1050 Wien · 5. Margareten

The outline marks the neighbourhood Margaretengürtel / Johannagasse area, with 34 addresses.worksplannedzoning change · projects nearby

The LAGE score

This building

Weak · better than 7 % of all addresses in Vienna

The neighbourhood

Margaretengürtel / Johannagasse area · Modest · Vienna average: 65.

ScoreThis buildingNeighbourhoodVienna
LQuietness 5 2287
LAir quality 29 2946
APublic transport 100 10090
GGreen space 72 7053
GNatural hazards 100 100100
EEveryday amenities 100 10097

0–100, higher is better. The neighbourhood and city columns show the average score of all their addresses, scored with the same rules.

LAGE stands for Lärm & Luft (noise & air) · Anbindung (transport links) · Grün & Gefahren (green & hazards) · Erledigungen (everyday errands). How it is calculated →

Set your priorities to see your own LAGE for this building →

The neighbourhood in figures

Loud road facade (≥ 65 dB Lden)
71 % of addresses
Free of mapped noise ≥ 55 dB at the building
0 %
Inside a 30- or 100-year flood area
0 %
Public transport class A or B
100 %
Green & open land within 300 m (average)
22 %
Distance to the nearest park or forest (average)
71 m
Residents
1,607 · very densely populated for Vienna
The neighbourhood report →

Building works and projects nearby

This address lies beyond the reach of every construction site, zoning change and planned line. 12 more projects within 1 km.

Further away, within 1 km (12)
  • Building 1050 Wien, Reinprechtsdorfer Str. 24-26, Baumeister Teil GU, abgehängte Decke, Bauphase 2025 und 2026
    553 m Contract awarded 8 April 2026 Source: Kerndaten (public tenders) · 10 records · checked 10 October 2026· Found automatically. Check with the source.
    History (10)
    1. award published (Kerndaten)
    2. award published (Kerndaten)
    3. award published (Kerndaten)
    4. award published (Kerndaten)
    5. award published (Kerndaten)
    6. award published (Kerndaten)
    7. award published (Kerndaten)
    8. award published (Kerndaten)
  • Public transport Siebenbrunnengasse von Kreuzung Siebenbrunnenplatz und Reinprechtsdorfer Straße bis 44 U-Bahn construction
    570 m Under construction · works since 28 February 2021, planned until 31 December 2026 · part of U2, 4. Ausbauphase Source: Stadt Wien · 7 records · checked 16 October 2026
  • Public transport U2, 4. Ausbauphase
    576 m Under construction · opening planned for 2030 Source: Stadt Wien · 42 records · checked 16 October 2026
  • Building 12., Am Fuchsenfeld 1-3, Stiegen 4, 11, 12 und 24
    607 m Contract awarded · contract period 6 October 2025 – 17 February 2028 · end moved 64 days later since first listed Source: TED (EU tenders) · 26 records · checked 10 October 2026· Found automatically. Check with the source.
    History (26)
    1. award published (TED 167517-2025)
    2. award published (TED 169080-2025)
    3. award published (TED 172085-2025)
    4. award published (TED 241803-2025)
    5. award published (TED 391947-2025)
    6. award published (TED 536484-2025)
    7. tender published (TED 849893-2025)
    8. award published (TED 530507-2026)
  • Public transport Zweigleisiger Ausbau der Pottendorfer Linie Abschnitt Wien Meidling - Abzweigung Altmannsdorf (ÖBB Strecken, 10601, 10615, 10616)
    627 m Approved 2021 Source: Umweltbundesamt (environmental impact assessment) · checked 16 October 2026 · route © OpenStreetMap contributors
  • Public transport Flurschützstraße von Kreuzung Aßmayergasse und Wilhelmstraße bis Kreuzung Längenfeldgasse track works
    685 m Under construction · works since 5 October 2026, planned until 27 November 2026 Source: Stadt Wien · 7 records · checked 16 October 2026
  • Zoning change Bacherplatz
    735 m Zoning in progress · draft on public display 14 October 2026 – 25 November 2026; building freeze until 14 May 2027 Source: Stadt Wien · 2 records · checked 16 October 2026
    History (2)
    1. building freeze announced
    2. procedure stage: Öffentliche Auflage
  • Public transport Bacherplatz von Arbeitergasse bis Schwarzhorngasse U-Bahn construction
    735 m Under construction · works since 28 February 2021, planned until 31 December 2028 · part of U2, 4. Ausbauphase Source: Stadt Wien · 7 records · checked 16 October 2026
  • Building GU Baumeisterarbeiten, Berufsschule 1120 Wien, Längenfeldgasse 13-15
    744 m Contract awarded · contract period 26 May 2025 – 1 October 2027 Source: TED (EU tenders), Kerndaten (public tenders) · 18 records · checked 10 October 2026· Found automatically. Check with the source.
    History (18)
    1. award published (TED 480164-2025)
    2. award published (Kerndaten)
    3. tender published (TED 58925-2026)
    4. tender published (TED 103387-2026)
    5. award published (TED 317420-2026)
    6. award published (Kerndaten)
    7. award published (TED 329842-2026)
    8. award published (Kerndaten)
  • Roads and bridges Wende- und Abstellanlage Matzleinsdorfer Platz
    764 m Contract awarded · since 10 January 2024 Source: TED (EU tenders) · 5 records · checked 10 October 2026· Found automatically. Check with the source.
    History (5)
    1. tender published (TED 204996-2022)
    2. tender published (TED 375263-2023)
    3. award published (TED 607779-2023)
    4. tender published (TED 310837-2024)
    5. tender published (TED 243424-2025)
  • Building WWSPEN-Wohnhaus Spengergasse 45 - Totalsanierung – Umbau und Aufstockung - Generalunternehmer
    765 m Contract awarded · contract period 27 March 2025 – 15 February 2027 Source: TED (EU tenders), Kerndaten (public tenders) · 3 records · checked 10 October 2026· Found automatically. Check with the source.
    History (3)
    1. tender published (TED 636999-2024)
    2. award published (TED 210517-2025)
    3. award published (Kerndaten)
  • Public transport Matzleinsdorfer Platz 3-4 bis 5 U-Bahn construction
    784 m Under construction · works since 27 March 2022, planned until 31 December 2028 · part of U2, 4. Ausbauphase Source: Stadt Wien · 7 records · checked 16 October 2026

From the City of Vienna (construction sites that affect traffic, zoning procedures, building freezes, planned U-Bahn, tram and major roads), public tenders, the Freedom of Information register and environmental impact assessments. We have recorded these sources every day since 10 October 2026. A moved end date shows as a delay. Private building sites appear only where they affect traffic or were tendered publicly.

The address in figures

Noise

Loudest facade (day–evening–night level)
road ≥ 75 dB, rail 65–69 dB
Quiet side
yes

Getting around

Public transport class
A
Nearest stop
Wien Eichenstraße, 3 min walk, every 2 min
Frequent service (every 10 min or more often)
Wien Eichenstraße, 3 min walk, every 2 min

On foot

Supermarket
3 min
Pharmacy
1 min
Doctor's practice
4 min
Crèche
1 min
Kindergarten
1 min
Primary school
4 min
Middle school
8 min
Playground
1 min

Green and air

Green and open land within 300 m
23 %
Nearest park
Parkanlage Mittelzone, 1 min walk
Nearest forest
–
NO₂ / PM2.5, modelled 2022
31.2 / 10.9 µg/m³
Heat days per year, now → around 2050
–

Hazards and rules

Flooding
outside mapped flood areas
Zoning
residential
Protection zones
outside all zones

Residents

Residents within 300 m
8,765 · very densely populated for Vienna
Who lives in the neighbourhood
more older people

Prices

Apartments, average €/m² by building age
€ 4,325–5,370 (the Margareten district)

The full report explains every figure, chapter by chapter, with what to check before you sign →

Sources: BEV cadastre and address register, Stadt Wien OGD (zoning, flood and protection zones, facility registers), BMLUK noise and flood maps, WLV hazard zones, ÖROK ÖV-Güteklassen 2025, European Environment Agency, Statistik Austria, © OpenStreetMap contributors. CC BY 4.0 / ODbL. Lagecheck processed the data. All sources and licences →