Your address

Spitalgasse 23

1090 Wien · 9. Alsergrund

The outline marks the neighbourhood Borschkegasse area, with 46 addresses.worksplannedzoning change · projects nearby

The LAGE score

This building

Weak · better than 14 % of all addresses in Vienna

The neighbourhood

Borschkegasse area · Modest · Vienna average: 65.

ScoreThis buildingNeighbourhoodVienna
LQuietness 17 3987
LAir quality 22 2746
APublic transport 100 10090
GGreen space 66 4453
GNatural hazards 100 100100
EEveryday amenities 97 10097

0–100, higher is better. The neighbourhood and city columns show the average score of all their addresses, scored with the same rules.

LAGE stands for Lärm & Luft (noise & air) · Anbindung (transport links) · Grün & Gefahren (green & hazards) · Erledigungen (everyday errands). How it is calculated →

Set your priorities to see your own LAGE for this building →

The neighbourhood in figures

Loud road facade (≥ 65 dB Lden)
56 % of addresses
Free of mapped noise ≥ 55 dB at the building
9 %
Inside a 30- or 100-year flood area
0 %
Public transport class A or B
100 %
Green & open land within 300 m (average)
6 %
Distance to the nearest park or forest (average)
126 m
Residents
294 · about as densely populated as most of Vienna
The neighbourhood report →

Building works and projects nearby

1 project reaches this address. 1 new station is planned within walking distance. 12 more projects within 1 km.

New stations nearby

Works and changes that reach this address

Further away, within 1 km (12)
  • Building 1090 Wien, Michelbeuerngasse 6-10, HLMW 9, Abbrucharbeiten
    228 m Contract awarded 24 September 2025 Source: Kerndaten (public tenders) · 10 records · checked 10 October 2026· Found automatically. Check with the source.
    History (10)
    1. award published (Kerndaten)
    2. award published (Kerndaten)
    3. award published (Kerndaten)
    4. award published (Kerndaten)
    5. award published (Kerndaten)
    6. award published (Kerndaten)
    7. award published (Kerndaten)
    8. award published (Kerndaten)
  • Building 25-011.843 Campus Quantum Cube – 02a Rohbau STB Hülle dicht
    333 m Contract awarded · contract period 28 May 2026 – 22 December 2027 Source: TED (EU tenders) · 2 records · checked 10 October 2026· Found automatically. Check with the source.
    History (2)
    1. tender published (TED 248273-2026)
    2. award published (TED 563058-2026)
  • Public transport U5, 4. Ausbauphase
    561 m Planned · opening planned for 2030 Source: Stadt Wien · 21 records · checked 16 October 2026
  • Building 1090 Wien, Garnisong. 3, Sanierung, Bestandssanierung, Geschäftslokal EG, Abbruch_Arbeiten_Lokal
    607 m Contract awarded 15 May 2026 Source: Kerndaten (public tenders) · 10 records · checked 15 October 2026· Found automatically. Check with the source.
    History (10)
    1. award published (Kerndaten)
    2. award published (Kerndaten)
    3. award published (Kerndaten)
    4. award published (Kerndaten)
    5. award published (Kerndaten)
    6. award published (Kerndaten)
    7. tender published (Kerndaten)
    8. tender published (Kerndaten)
  • Building Dr. Eduard Kaufmann´sche Armenstiftung / Investorensuche zum Erwerb eines Baurechts
    644 m Contract awarded 7 November 2025 Source: TED (EU tenders) · 3 records · checked 10 October 2026· Found automatically. Check with the source.
    History (3)
    1. tender published (TED 484350-2024)
    2. tender published (TED 626975-2024)
    3. award published (TED 739467-2025)
  • Building 1080 Wien, Landesgerichtsstraße 9a-11 und Wickenburggasse 18-20, Funktions- und Bestandssanierung des Justizzentrums für Strafsachen Wien, Baumeisterarbeiten, Teil-GU
    649 m Contract awarded 22 July 2026 Source: Kerndaten (public tenders) · 39 records · checked 10 October 2026· Found automatically. Check with the source.
    History (39)
    1. award published (Kerndaten)
    2. award published (Kerndaten)
    3. award published (Kerndaten)
    4. award published (Kerndaten)
    5. award published (Kerndaten)
    6. award published (Kerndaten)
    7. award published (Kerndaten)
    8. award published (Kerndaten)
  • Roads and bridges Universitätsstraße Kreuzung Landesgerichtsstraße und Garnisongasse road works
    664 m Under construction · works since 3 May 2026, planned until 18 December 2026 Source: Stadt Wien · 7 records · checked 16 October 2026
  • Building 1080 Wien, Laudongasse 15-19, Sanierung des Palais Schönborn (VKM WIEN) - Mauerwerkstrockenlegung und Abbruch inkl. TGA-Anteil
    699 m Contract awarded · contract period 16 January 2025 – 31 October 2026 · end moved 219 days later since first listed Source: TED (EU tenders), Kerndaten (public tenders) · 27 records · checked 10 October 2026· Found automatically. Check with the source.
    History (27)
    1. award published (TED 420996-2025)
    2. tender published (TED 428933-2025)
    3. award published (Kerndaten)
    4. award published (TED 2989-2026)
    5. award published (Kerndaten)
    6. award published (Kerndaten)
    7. award published (TED 646469-2026)
    8. award published (TED 648130-2026)
  • Building Baumeisterarbeiten, Schule 1180 Wien, Klettenhofergasse 3
    699 m Contract awarded 26 May 2026 Source: data.gv.at (information requests) · checked 10 October 2026· Found automatically. Check with the source.
  • Zoning change Schulgasse 27
    728 m Zoning in progress · draft on public display 6 May 2026 – 17 June 2026; building freeze until 6 December 2026 Source: Stadt Wien · 2 records · checked 16 October 2026
    History (2)
    1. building freeze announced
    2. procedure stage: Vor Genehmigt
  • Building 08., Schlösselgasse 14 - Baumeisterarbeiten
    729 m Contract awarded · contract period 15 June 2026 – 15 August 2029 · end moved 338 days later since first listed Source: TED (EU tenders), Kerndaten (public tenders) · 22 records · checked 16 October 2026· Found automatically. Check with the source.
    History (22)
    1. tender published (TED 132388-2026)
    2. tender published (TED 133526-2026)
    3. tender published (TED 136073-2026)
    4. tender published (TED 144892-2026)
    5. tender published (TED 672752-2026)
    6. award published (Kerndaten)
    7. tender published (Kerndaten)
    8. award published (TED 703150-2026)
  • Building 1080 Wien, Landesgerichtsstraße 9a-11, Justizzentrum für Strafsachen (JZS) Wien, Funktions- und Bestandsanierung, Teil-Generalunternehmer
    740 m Contract awarded 22 May 2026 Source: Kerndaten (public tenders) · 30 records · checked 10 October 2026· Found automatically. Check with the source.
    History (30)
    1. award published (Kerndaten)
    2. award published (Kerndaten)
    3. award published (Kerndaten)
    4. award published (Kerndaten)
    5. award published (Kerndaten)
    6. award published (Kerndaten)
    7. award published (Kerndaten)
    8. award published (Kerndaten)

From the City of Vienna (construction sites that affect traffic, zoning procedures, building freezes, planned U-Bahn, tram and major roads), public tenders, the Freedom of Information register and environmental impact assessments. We have recorded these sources every day since 10 October 2026. A moved end date shows as a delay. Private building sites appear only where they affect traffic or were tendered publicly.

The address in figures

Noise

Loudest facade (day–evening–night level)
road 70–74 dB, rail 60–64 dB
Quiet side
yes

Getting around

Public transport class
A
Nearest stop
Wien Lazarettgasse, 1 min walk, every 4 min
Frequent service (every 10 min or more often)
Wien Lazarettgasse, 1 min walk, every 4 min

On foot

Supermarket
6 min
Pharmacy
5 min
Doctor's practice
2 min
Crèche
1 min
Kindergarten
1 min
Primary school
4 min
Middle school
15 min
Playground
2 min

Green and air

Green and open land within 300 m
21 %
Nearest park
Garnisonshof, 2 min walk
Nearest forest
unnamed, 10 min walk
NO₂ / PM2.5, modelled 2022
23.1 / 11.3 µg/m³
Heat days per year, now → around 2050
–

Hazards and rules

Flooding
outside mapped flood areas
Zoning
core / mixed use
Protection zones
outside all zones

Residents

Residents within 300 m
2,188 · about as densely populated as most of Vienna
Who lives in the neighbourhood
younger residents than in most of Vienna; fewer children

Prices

Apartments, average €/m² by building age
€ 4,750–6,404 (the Alsergrund district)

The full report explains every figure, chapter by chapter, with what to check before you sign →

Sources: BEV cadastre and address register, Stadt Wien OGD (zoning, flood and protection zones, facility registers), BMLUK noise and flood maps, WLV hazard zones, ÖROK ÖV-Güteklassen 2025, European Environment Agency, Statistik Austria, © OpenStreetMap contributors. CC BY 4.0 / ODbL. Lagecheck processed the data. All sources and licences →