Your address

Strobachgasse 5

1050 Wien · 5. Margareten

The outline marks the neighbourhood Schönbrunner Straße / Strobachgasse area, with 51 addresses.worksplannedzoning change · projects nearby

The LAGE score

This building

Fair · better than 47 % of all addresses in Vienna

The neighbourhood

Schönbrunner Straße / Strobachgasse area · Weak · Vienna average: 65.

ScoreThis buildingNeighbourhoodVienna
LQuietness 67 1787
LAir quality 34 3446
APublic transport 100 10090
GGreen space 47 4753
GNatural hazards 100 100100
EEveryday amenities 100 10097

0–100, higher is better. The neighbourhood and city columns show the average score of all their addresses, scored with the same rules.

LAGE stands for Lärm & Luft (noise & air) · Anbindung (transport links) · Grün & Gefahren (green & hazards) · Erledigungen (everyday errands). How it is calculated →

Set your priorities to see your own LAGE for this building →

The neighbourhood in figures

Loud road facade (≥ 65 dB Lden)
69 % of addresses
Free of mapped noise ≥ 55 dB at the building
2 %
Inside a 30- or 100-year flood area
0 %
Public transport class A or B
100 %
Green & open land within 300 m (average)
9 %
Distance to the nearest park or forest (average)
170 m
Protection zone (Schutzzone)
61 %
Residents
843 · more densely populated than most of Vienna
The neighbourhood report →

Building works and projects nearby

1 new station is planned within walking distance. 12 more projects within 1 km.

New stations nearby

Further away, within 1 km (12)
  • Zoning change Bacherplatz
    220 m Zoning in progress · draft on public display 14 October 2026 – 25 November 2026; building freeze until 14 May 2027 Source: Stadt Wien · 2 records · checked 16 October 2026
    History (2)
    1. building freeze announced
    2. procedure stage: Öffentliche Auflage
  • Public transport Rechte Wienzeile von Kreuzung Ramperstorffergasse bis Kreuzung Pilgramgasse und Pilgrambrücke U-Bahn construction
    275 m Under construction · works since 28 February 2021, planned until 31 May 2028 · part of U2, 4. Ausbauphase Source: Stadt Wien, TED (EU tenders) · 10 records · checked 16 October 2026
    History (4)
    1. award published (TED 475971-2022)
    2. tender published (TED 829936-2025)
    3. tender published (TED 585716-2026)
    4. listed by the city
  • Pipes and cables Zentagasse 22 bis 46 pipe laying
    300 m Under construction · works since 31 August 2026, planned until 30 October 2026 Source: Stadt Wien · 7 records · checked 16 October 2026
  • Zoning change Plandokument 8489: Gebiet zwischen Castelligasse, Gartengasse, Linienzug 1-3, Linienzug 3-4 (Viktor-Christ-Gasse) und Zentagasse
    369 m Zoning in progress 8 June 2026 Source: data.gv.at (information requests) · checked 10 October 2026
  • Public transport U-Bahn-Linie U2, Bauabschnitte U2/17-U2/21; Konstruktiver Ingenieurbau, Tunnelbau, Gleisbau
    388 m Contract awarded 16 September 2025 · part of U2, 4. Ausbauphase Source: TED (EU tenders) · 7 records · checked 10 October 2026· Found automatically. Check with the source.
    History (7)
    1. tender published (TED 116012-2019)
    2. notice changed (TED 142519-2019)
    3. award published (TED 28914-2021)
    4. award published (TED 21980-2022)
    5. award published (TED 239588-2022)
    6. award published (TED 606170-2022)
    7. award published (TED 680150-2025)
  • Pipes and cables Linke Wienzeile 90-92 sewer works
    435 m Under construction · works since 19 May 2026, planned until 18 December 2026 Source: Stadt Wien · 7 records · checked 16 October 2026
  • Building Stadt Wien - Wiener Wohnen - 04., Preßgasse 7 - Baumeister
    473 m Contract awarded 27 November 2025 Source: Kerndaten (public tenders) · 10 records · checked 10 October 2026· Found automatically. Check with the source.
    History (10)
    1. award published (Kerndaten)
    2. award published (Kerndaten)
    3. award published (Kerndaten)
    4. award published (Kerndaten)
    5. award published (Kerndaten)
    6. award published (Kerndaten)
    7. award published (Kerndaten)
    8. award published (Kerndaten)
  • Building Naschmarkt – Ost – Marktraum vorbereitende Maßnahmen Bauphase 1A
    510 m Tendered · contract period 23 October 2024 – 21 February 2027 Source: TED (EU tenders) · 4 records · checked 10 October 2026· Found automatically. Check with the source.
    History (4)
    1. tender published (TED 512553-2024)
    2. tender published (TED 661131-2024)
    3. tender published (TED 718666-2024)
    4. tender published (TED 513099-2026)
  • Building WWSPEN-Wohnhaus Spengergasse 45 - Totalsanierung – Umbau und Aufstockung - Generalunternehmer
    594 m Contract awarded · contract period 27 March 2025 – 15 February 2027 Source: TED (EU tenders), Kerndaten (public tenders) · 3 records · checked 10 October 2026· Found automatically. Check with the source.
    History (3)
    1. tender published (TED 636999-2024)
    2. award published (TED 210517-2025)
    3. award published (Kerndaten)
  • Public transport Bacherplatz von Arbeitergasse bis Schwarzhorngasse U-Bahn construction
    642 m Under construction · works since 28 February 2021, planned until 31 December 2028 · part of U2, 4. Ausbauphase Source: Stadt Wien · 7 records · checked 16 October 2026
  • Building 04., Rechte Wienzeile 25-27
    657 m Contract awarded · contract period 15 March 2025 – 2 April 2028 · end moved 47 days later since first listed Source: TED (EU tenders) · 24 records · checked 10 October 2026· Found automatically. Check with the source.
    History (24)
    1. award published (TED 149259-2025)
    2. award published (TED 187214-2025)
    3. tender published (TED 239094-2025)
    4. award published (TED 269220-2025)
    5. award published (TED 321786-2025)
    6. tender published (TED 471650-2025)
    7. award published (TED 535946-2025)
    8. award published (TED 34015-2026)
  • Roads and bridges 6., Windmühlgasse u.a.
    682 m Contract awarded · contract period 1 September 2026 – 22 October 2027 Source: TED (EU tenders) · 3 records · checked 10 October 2026· Found automatically. Check with the source.
    History (3)
    1. tender published (TED 451515-2026)
    2. tender published (TED 518208-2026)
    3. award published (TED 672839-2026)

From the City of Vienna (construction sites that affect traffic, zoning procedures, building freezes, planned U-Bahn, tram and major roads), public tenders, the Freedom of Information register and environmental impact assessments. We have recorded these sources every day since 10 October 2026. A moved end date shows as a delay. Private building sites appear only where they affect traffic or were tendered publicly.

The address in figures

Noise

Loudest facade (day–evening–night level)
road 60–64 dB
Quiet side
yes

Getting around

Public transport class
A
Nearest stop
Wien Ziegelofengasse, 2 min walk, every 4 min
Frequent service (every 10 min or more often)
Wien Ziegelofengasse, 2 min walk, every 4 min

On foot

Supermarket
1 min
Pharmacy
1 min
Doctor's practice
1 min
Crèche
2 min
Kindergarten
2 min
Primary school
8 min
Middle school
8 min
Playground
2 min

Green and air

Green and open land within 300 m
9 %
Nearest park
Willi-Frank-Park, 2 min walk
Nearest forest
–
NO₂ / PM2.5, modelled 2022
29.7 / 11.7 µg/m³
Heat days per year, now → around 2050
–

Hazards and rules

Flooding
outside mapped flood areas
Zoning
residential
Protection zones
old-town zone

Residents

Residents within 300 m
6,894 · more densely populated than most of Vienna
Who lives in the neighbourhood
fewer children

Prices

Apartments, average €/m² by building age
€ 4,325–5,370 (the Margareten district)

The full report explains every figure, chapter by chapter, with what to check before you sign →

Sources: BEV cadastre and address register, Stadt Wien OGD (zoning, flood and protection zones, facility registers), BMLUK noise and flood maps, WLV hazard zones, ÖROK ÖV-Güteklassen 2025, European Environment Agency, Statistik Austria, © OpenStreetMap contributors. CC BY 4.0 / ODbL. Lagecheck processed the data. All sources and licences →