Your address
Stuwerstraße 10
1020 Wien · 2. Leopoldstadt
The LAGE score
This building
Fair · better than 58 % of all addresses in Vienna
The neighbourhood
Stuwerstraße / Wolfgang-Schmälzl-Gasse area · Fair · Vienna average: 65.
| Score | This building | Neighbourhood | Vienna |
|---|---|---|---|
| LQuietness | 87 | 87 | 87 |
| LAir quality | 32 | 32 | 46 |
| APublic transport | 90 | 90 | 90 |
| GGreen space | 55 | 61 | 53 |
| GNatural hazards | 100 | 100 | 100 |
| EEveryday amenities | 99 | 99 | 97 |
0–100, higher is better. The neighbourhood and city columns show the average score of all their addresses, scored with the same rules.
LAGE stands for Lärm & Luft (noise & air) · Anbindung (transport links) · Grün & Gefahren (green & hazards) · Erledigungen (everyday errands). How it is calculated →
Set your priorities to see your own LAGE for this building →
The neighbourhood in figures
- Loud road facade (≥ 65 dB Lden)
- 22 % of addresses
- Free of mapped noise ≥ 55 dB at the building
- 2 %
- Inside a 30- or 100-year flood area
- 0 %
- Public transport class A or B
- 100 %
- Green & open land within 300 m (average)
- 16 %
- Distance to the nearest park or forest (average)
- 97 m
- Protection zone (Schutzzone)
- 37 %
- Residents
- 901 · more densely populated than most of Vienna
Building works and projects nearby
This address lies beyond the reach of every construction site, zoning change and planned line. 12 more projects within 1 km.
Further away, within 1 km (12)
-
Pipes and cables Ausstellungsstraße von 21 bis 23 pipe laying167 m Under construction · works since 7 June 2026, planned until 31 March 2027 Source: Stadt Wien · 7 records · checked 16 October 2026
-
Building A23 Südosttangente Wien, GE Kn Prater - ASt Handelskai, km 10,596 - km 12,287180 m Contract awarded · contract period 8 July 2024 – 31 October 2031 Source: TED (EU tenders) · 24 records · checked 10 October 2026· Found automatically. Check with the source.
History (24)
- award published (TED 197646-2026)
- award published (TED 204964-2026)
- award published (TED 218285-2026)
- award published (TED 239657-2026)
- award published (TED 287541-2026)
- award published (TED 411646-2026)
- award published (TED 524521-2026)
- award published (TED 644329-2026)
-
Roads and bridges Praterstern von Kreuzung Franzensbrückenstraße bis Kreuzung Hauptallee works on a special structure377 m Under construction · works since 14 September 2026, planned until 30 November 2026 Source: Stadt Wien · 7 records · checked 16 October 2026
-
Roads and bridges (ProVia-ID 140655) SBW-St; Bau; Baumeisterarbeiten Wien Mitte - Baumeisterarbeiten Wien Mitte - Praterstern (M14,16,17,20,21,22,32,33,38)439 m Contract awarded 31 May 2026 Source: TED (EU tenders), Kerndaten (public tenders) · 11 records · checked 15 October 2026· Found automatically. Check with the source.
History (11)
- award published (Kerndaten)
- award published (TED 375124-2026)
- award published (Kerndaten)
- award published (Kerndaten)
- award published (Kerndaten)
- tender published (Kerndaten)
- tender published (Kerndaten)
- tender published (Kerndaten)
-
Building 02., Radingerstraße 21 - Baumeister- und Fenstertauscharbeiten468 m Contract awarded 21 September 2026 Source: Kerndaten (public tenders) · 7 records · checked 15 October 2026· Found automatically. Check with the source.
History (7)
- award published (Kerndaten)
- award published (Kerndaten)
- award published (Kerndaten)
- award published (Kerndaten)
- award published (Kerndaten)
- award published (Kerndaten)
- tender published (Kerndaten)
-
Building 02., Lassallestraße 40597 m Tendered · contract period 15 March 2027 – 15 May 2030 Source: TED (EU tenders) · 2 records · checked 16 October 2026· Found automatically. Check with the source.
History (2)
- tender published (TED 617155-2026)
- tender published (TED 707498-2026)
-
Building VIECON Messe Wien - Audiovisuelle Systeme (AVS)690 m Contract awarded · contract period 1 January 2027 – 31 December 2031 Source: TED (EU tenders) · 2 records · checked 10 October 2026· Found automatically. Check with the source.
History (2)
- tender published (TED 63809-2026)
- award published (TED 574128-2026)
-
Building 1020 Wien Böcklinstraße 1- Dekarbonisierung Raus aus Gas Baumeisterarbeiten_Teil-GU698 m Contract awarded 30 June 2025 Source: Kerndaten (public tenders) · 2 records · checked 10 October 2026· Found automatically. Check with the source.
History (2)
- award published (Kerndaten)
- award published (Kerndaten)
-
Public transport ÖBB Wohnprogramm, 1020 Wien, Mühlfeldgasse 15 & 16 - Generalunternehmerleistungen Bau725 m Contract awarded 23 June 2025 Source: Kerndaten (public tenders) · checked 10 October 2026· Found automatically. Check with the source.
-
Roads and bridges Schüttelstraße von 9 bis 3 works on a special structure732 m Under construction · works since 14 September 2026, planned until 15 November 2026 Source: Stadt Wien · 7 records · checked 16 October 2026
-
Building Stadt Wien - Wiener Wohnen - 02., Mexikoplatz 25 - Baumeister774 m Contract awarded 25 June 2025 Source: Kerndaten (public tenders) · 9 records · checked 10 October 2026· Found automatically. Check with the source.
History (9)
- award published (Kerndaten)
- award published (Kerndaten)
- award published (Kerndaten)
- award published (Kerndaten)
- award published (Kerndaten)
- award published (Kerndaten)
- award published (Kerndaten)
- award published (Kerndaten)
-
Pipes and cables Nordbahnstraße von Alliiertenstraße bis Am Tabor pipe laying878 m Under construction · works since 26 July 2026, planned until 1 November 2026 Source: Stadt Wien · 7 records · checked 16 October 2026
From the City of Vienna (construction sites that affect traffic, zoning procedures, building freezes, planned U-Bahn, tram and major roads), public tenders, the Freedom of Information register and environmental impact assessments. We have recorded these sources every day since 10 October 2026. A moved end date shows as a delay. Private building sites appear only where they affect traffic or were tendered publicly.
All projects in Vienna → Know of a project that is missing? Tell us
The address in figures
Noise
- Loudest facade (day–evening–night level)
- road 55–59 dB
- Quiet side
- yes
Getting around
- Public transport class
- B
- Nearest stop
- Wien Molkereistraße, 3 min walk, every 34 min
- Frequent service (every 10 min or more often)
- Wien Praterstern, 7 min walk, every 1 min
On foot
- Supermarket
- 2 min
- Pharmacy
- 1 min
- Doctor's practice
- 1 min
- Crèche
- 2 min
- Kindergarten
- 2 min
- Primary school
- 3 min
- Middle school
- 3 min
- Playground
- 3 min
Green and air
- Green and open land within 300 m
- 13 %
- Nearest park
- Venediger-Au-Park, 2 min walk
- Nearest forest
- unnamed, 7 min walk
- NO₂ / PM2.5, modelled 2022
- 30.4 / 12.2 µg/m³
- Heat days per year, now → around 2050
- –
Hazards and rules
- Flooding
- outside mapped flood areas
- Zoning
- residential
- Protection zones
- old-town zone
Residents
- Residents within 300 m
- 4,852 · more densely populated than most of Vienna
- Who lives in the neighbourhood
- fewer children
Prices
- Apartments, average €/m² by building age
- € 4,603–6,369 (the Leopoldstadt district)
The full report explains every figure, chapter by chapter, with what to check before you sign →
Sources: BEV cadastre and address register, Stadt Wien OGD (zoning, flood and protection zones, facility registers), BMLUK noise and flood maps, WLV hazard zones, ÖROK ÖV-Güteklassen 2025, European Environment Agency, Statistik Austria, © OpenStreetMap contributors. CC BY 4.0 / ODbL. Lagecheck processed the data. All sources and licences →