Your address

Talkengasse 5

1230 Wien · 23. Liesing

The outline marks the neighbourhood Rudolf-Zeller-Gasse / Dirmhirngasse area, with 127 addresses.worksplannedzoning change · projects nearby

The LAGE score

This building

Weak · better than 10 % of all addresses in Vienna

The neighbourhood

Rudolf-Zeller-Gasse / Dirmhirngasse area · Good · Vienna average: 65.

ScoreThis buildingNeighbourhoodVienna
LQuietness 5 8787
LAir quality 52 5246
APublic transport 90 9090
GGreen space 63 5853
GNatural hazards 100 100100
EEveryday amenities 99 9997

0–100, higher is better. The neighbourhood and city columns show the average score of all their addresses, scored with the same rules.

LAGE stands for Lärm & Luft (noise & air) · Anbindung (transport links) · Grün & Gefahren (green & hazards) · Erledigungen (everyday errands). How it is calculated →

Set your priorities to see your own LAGE for this building →

The neighbourhood in figures

Loud road facade (≥ 65 dB Lden)
28 % of addresses
Free of mapped noise ≥ 55 dB at the building
16 %
Inside a 30- or 100-year flood area
0 %
Public transport class A or B
96 %
Green & open land within 300 m (average)
14 %
Distance to the nearest park or forest (average)
99 m
Protection zone (Schutzzone)
2 %
Residents
4,820 · about as densely populated as most of Vienna
The neighbourhood report →

Building works and projects nearby

This address lies beyond the reach of every construction site, zoning change and planned line. 6 more projects within 1 km.

Further away, within 1 km (6)
  • Zoning change Paul-Katzberger-Gasse
    646 m Zoning in progress · building freeze since 5 February 2025 Source: Stadt Wien · checked 16 October 2026
  • Roads and bridges Lehmanngasse von Liesinger Platz und Perchtoldsdorfer Straße bis Fabergasse und Brauereisteg road works
    651 m Under construction · works since 12 October 2026, planned until 14 May 2027 Source: Stadt Wien · 7 records · checked 16 October 2026
  • Pipes and cables Knotzenbachgasse von Kreuzung Endresstraße und Khemetergasse bis Kreuzung Dirmhirngasse pipe laying
    662 m Under construction · works since 28 June 2026, planned until 27 November 2026 Source: Stadt Wien · 7 records · checked 16 October 2026
  • Pipes and cables Endresstraße von 24-26 bis ggü. 24-26 pipe laying
    676 m Under construction · works since 28 June 2026, planned until 27 November 2026 Source: Stadt Wien · 7 records · checked 16 October 2026
  • Building Errichtung von Aufzugsanlagen für die neue Schwimmhalle
    712 m Contract awarded · contract period 1 September 2025 – 29 October 2027 Source: TED (EU tenders) · 10 records · checked 10 October 2026· Found automatically. Check with the source.
    History (10)
    1. tender published (TED 447195-2025)
    2. tender published (TED 456614-2025)
    3. tender published (TED 501066-2025)
    4. tender published (TED 508680-2025)
    5. tender published (TED 509817-2025)
    6. tender published (TED 510561-2025)
    7. award published (TED 691560-2025)
    8. award published (TED 694055-2025)
  • Roads and bridges 23., Elisenstraße 24 - 26
    866 m Contract awarded · contract period 13 April 2026 – 17 June 2028 · end moved 63 days later since first listed Source: TED (EU tenders) · 20 records · checked 10 October 2026· Found automatically. Check with the source.
    History (20)
    1. award published (TED 81718-2026)
    2. award published (TED 108555-2026)
    3. award published (TED 144422-2026)
    4. award published (TED 153021-2026)
    5. award published (TED 181853-2026)
    6. award published (TED 183592-2026)
    7. award published (TED 226366-2026)
    8. award published (TED 421389-2026)

From the City of Vienna (construction sites that affect traffic, zoning procedures, building freezes, planned U-Bahn, tram and major roads), public tenders, the Freedom of Information register and environmental impact assessments. We have recorded these sources every day since 10 October 2026. A moved end date shows as a delay. Private building sites appear only where they affect traffic or were tendered publicly.

The address in figures

Noise

Loudest facade (day–evening–night level)
road 70–74 dB
Quiet side
no

Getting around

Public transport class
B
Nearest stop
Wien Liesing Schulzentrum, 3 min walk, every 7 min
Frequent service (every 10 min or more often)
Wien Liesing Schulzentrum, 3 min walk, every 7 min

On foot

Supermarket
8 min
Pharmacy
9 min
Doctor's practice
2 min
Crèche
8 min
Kindergarten
6 min
Primary school
6 min
Middle school
11 min
Playground
4 min

Green and air

Green and open land within 300 m
17 %
Nearest park
Fridtjof-Nansen-Park, 1 min walk
Nearest forest
–
NO₂ / PM2.5, modelled 2022
24.5 / 11.3 µg/m³
Heat days per year, now → around 2050
–

Hazards and rules

Flooding
outside mapped flood areas
Zoning
residential
Protection zones
outside all zones

Residents

Residents within 300 m
3,043 · about as densely populated as most of Vienna
Who lives in the neighbourhood
more older people

Prices

Apartments, average €/m² by building age
€ 3,251–4,810 (the Liesing district)

The full report explains every figure, chapter by chapter, with what to check before you sign →

Sources: BEV cadastre and address register, Stadt Wien OGD (zoning, flood and protection zones, facility registers), BMLUK noise and flood maps, WLV hazard zones, ÖROK ÖV-Güteklassen 2025, European Environment Agency, Statistik Austria, © OpenStreetMap contributors. CC BY 4.0 / ODbL. Lagecheck processed the data. All sources and licences →