Your address

Tegelweg 23A

1220 Wien · 22. Donaustadt

The outline marks the neighbourhood Brabbéegasse area, with 308 addresses.worksplannedzoning change · projects nearby

The LAGE score

This building

Fair · better than 66 % of all addresses in Vienna

The neighbourhood

Brabbéegasse area · Good · Vienna average: 65.

ScoreThis buildingNeighbourhoodVienna
LQuietness 95 8787
LAir quality 47 5046
APublic transport 90 9090
GGreen space 40 4153
GNatural hazards 100 100100
EEveryday amenities 100 10097

0–100, higher is better. The neighbourhood and city columns show the average score of all their addresses, scored with the same rules.

LAGE stands for Lärm & Luft (noise & air) · Anbindung (transport links) · Grün & Gefahren (green & hazards) · Erledigungen (everyday errands). How it is calculated →

Set your priorities to see your own LAGE for this building →

The neighbourhood in figures

Loud road facade (≥ 65 dB Lden)
6 % of addresses
Free of mapped noise ≥ 55 dB at the building
44 %
Inside a 30- or 100-year flood area
0 %
Public transport class A or B
100 %
Green & open land within 300 m (average)
5 %
Distance to the nearest park or forest (average)
211 m
Residents
2,440 · about as densely populated as most of Vienna
The neighbourhood report →

Building works and projects nearby

This address lies beyond the reach of every construction site, zoning change and planned line. 8 more projects within 1 km.

Further away, within 1 km (8)
  • Building Totalunternehmerleistungen, Schule 1220 Wien, Brioschiweg
    207 m Contract awarded · contract period 28 February 2026 – 31 August 2027 Source: TED (EU tenders), Kerndaten (public tenders) · 3 records · checked 10 October 2026· Found automatically. Check with the source.
    History (3)
    1. tender published (TED 725866-2025)
    2. award published (Kerndaten)
    3. award published (TED 234736-2026)
  • Building 22., Rennbahnweg 27 - Garagen Objekt 910-913
    539 m Contract awarded · contract period 15 June 2026 – 17 January 2027 · end moved 63 days later since first listed Source: TED (EU tenders) · 11 records · checked 10 October 2026· Found automatically. Check with the source.
    History (11)
    1. tender published (TED 460833-2023)
    2. award published (TED 490983-2023)
    3. tender published (TED 653896-2023)
    4. award published (TED 692505-2023)
    5. award published (TED 736389-2023)
    6. award published (TED 519755-2024)
    7. tender published (TED 22413-2026)
    8. award published (TED 592943-2026)
  • Building WIGEBA – 1220 Wien, Melangasse 1A, Eipeldauerstraße 31 - Generalunternehmerleistungen
    548 m Contract awarded · contract period 1 March 2026 – 1 November 2028 · end moved 61 days later since first listed Source: TED (EU tenders), Kerndaten (public tenders) · 3 records · checked 10 October 2026· Found automatically. Check with the source.
    History (3)
    1. tender published (TED 529020-2025)
    2. award published (Kerndaten)
    3. award published (TED 288314-2026)
  • Roads and bridges B 229 (Neubau)
    629 m Planned Source: Stadt Wien · checked 16 October 2026
  • Roads and bridges B 229 (Neubau)
    629 m Planned Source: Stadt Wien · checked 13 October 2026
  • Zoning change Wagramer Straße
    929 m Zoning in progress · building freeze since 7 May 2025 Source: Stadt Wien · checked 16 October 2026
  • Roads and bridges B 229 (Neubau)
    966 m Planned Source: Stadt Wien · checked 16 October 2026
  • Roads and bridges B 229 (Neubau)
    966 m Planned Source: Stadt Wien · checked 13 October 2026

From the City of Vienna (construction sites that affect traffic, zoning procedures, building freezes, planned U-Bahn, tram and major roads), public tenders, the Freedom of Information register and environmental impact assessments. We have recorded these sources every day since 10 October 2026. A moved end date shows as a delay. Private building sites appear only where they affect traffic or were tendered publicly.

The address in figures

Noise

Loudest facade (day–evening–night level)
below 55 dB
Quiet side
–

Getting around

Public transport class
B
Nearest stop
Wien Sebaldgasse, 4 min walk, every 10 min
Frequent service (every 10 min or more often)
Wien Sebaldgasse, 4 min walk, every 10 min

On foot

Supermarket
5 min
Pharmacy
4 min
Doctor's practice
7 min
Crèche
2 min
Kindergarten
2 min
Primary school
4 min
Middle school
4 min
Playground
9 min

Green and air

Green and open land within 300 m
6 %
Nearest park
Ingeborg-Bachmann-Park, 3 min walk
Nearest forest
–
NO₂ / PM2.5, modelled 2022
25.8 / 11.6 µg/m³
Heat days per year, now → around 2050
–

Hazards and rules

Flooding
outside mapped flood areas
Zoning
residential
Protection zones
outside all zones

Residents

Residents within 300 m
2,594 · about as densely populated as most of Vienna
Who lives in the neighbourhood
older residents than in most of Vienna; more older people; fewer people between 15 and 29

Prices

Apartments, average €/m² by building age
€ 3,653–5,214 (the Donaustadt district)

The full report explains every figure, chapter by chapter, with what to check before you sign →

Sources: BEV cadastre and address register, Stadt Wien OGD (zoning, flood and protection zones, facility registers), BMLUK noise and flood maps, WLV hazard zones, ÖROK ÖV-Güteklassen 2025, European Environment Agency, Statistik Austria, © OpenStreetMap contributors. CC BY 4.0 / ODbL. Lagecheck processed the data. All sources and licences →