Your address
Thimiggasse 49
1180 Wien · 18. Währing
The LAGE score
This building
Fair · better than 62 % of all addresses in Vienna
The neighbourhood
Schindlergasse area · Good · Vienna average: 65.
| Score | This building | Neighbourhood | Vienna |
|---|---|---|---|
| LQuietness | 75 | 87 | 87 |
| LAir quality | 40 | 40 | 46 |
| APublic transport | 90 | 78 | 90 |
| GGreen space | 52 | 60 | 53 |
| GNatural hazards | 100 | 100 | 100 |
| EEveryday amenities | 100 | 100 | 97 |
0–100, higher is better. The neighbourhood and city columns show the average score of all their addresses, scored with the same rules.
LAGE stands for Lärm & Luft (noise & air) · Anbindung (transport links) · Grün & Gefahren (green & hazards) · Erledigungen (everyday errands). How it is calculated →
Set your priorities to see your own LAGE for this building →
The neighbourhood in figures
- Loud road facade (≥ 65 dB Lden)
- 0 % of addresses
- Free of mapped noise ≥ 55 dB at the building
- 10 %
- Inside a 30- or 100-year flood area
- 0 %
- Public transport class A or B
- 46 %
- Green & open land within 300 m (average)
- 21 %
- Distance to the nearest park or forest (average)
- 268 m
- Residents
- 1,071 · about as densely populated as most of Vienna
Building works and projects nearby
This address lies beyond the reach of every construction site, zoning change and planned line. 11 more projects within 1 km.
Further away, within 1 km (11)
-
Building 1180 Wien, Bastiengasse 26, Funktionsadaptierung und Sanierung des historischen Bestandes Semmelweisareal Haus 1, Gefährlicher Abbruch368 m Contract awarded 24 June 2026 Source: Kerndaten (public tenders) · 31 records · checked 10 October 2026· Found automatically. Check with the source.
History (31)
- award published (Kerndaten)
- award published (Kerndaten)
- award published (Kerndaten)
- award published (Kerndaten)
- award published (Kerndaten)
- award published (Kerndaten)
- award published (Kerndaten)
- award published (Kerndaten)
-
Building 1180 Wien, Bastiengasse 36, Funktionsadaptierung und Sanierung des historischen Bestandes Semmelweisareal Haus 1, Baumeisterarbeiten467 m Contract awarded · contract period 15 July 2024 – 16 October 2026 Source: TED (EU tenders) · 18 records · checked 10 October 2026· Found automatically. Check with the source.
History (18)
- tender published (TED 508153-2024)
- award published (TED 648303-2024)
- tender published (TED 718469-2024)
- award published (TED 59140-2025)
- tender published (TED 346904-2025)
- award published (TED 407324-2025)
- tender published (TED 800384-2025)
- award published (TED 146886-2026)
-
Building Stadt Wien - Wiener Wohnen - 18., Hockegasse 9 - Baumeister479 m Contract awarded 10 February 2025 Source: Kerndaten (public tenders) · 7 records · checked 10 October 2026· Found automatically. Check with the source.
History (7)
- award published (Kerndaten)
- award published (Kerndaten)
- award published (Kerndaten)
- award published (Kerndaten)
- award published (Kerndaten)
- award published (Kerndaten)
- award published (Kerndaten)
-
Zoning change Gersthofer Straße540 m Zoning in progress · draft on public display 6 May 2026 – 17 June 2026; building freeze until 6 December 2026 Source: Stadt Wien · 2 records · checked 16 October 2026
History (2)
- building freeze announced
- procedure stage: Vor Genehmigt
-
Building Transportrohrstrang 5. HL-BA02 PH01 DN/ID 800 - 1170 Wien, Wattgasse - Lidlgasse 1-7567 m Tendered · contract period 23 February 2026 – 1 September 2027 Source: TED (EU tenders) · 4 records · checked 10 October 2026· Found automatically. Check with the source.
History (4)
- tender published (TED 798007-2025)
- tender published (TED 839822-2025)
- tender published (TED 108964-2026)
- tender published (TED 158861-2026)
-
Pipes and cables Lidlgasse 1 bis 7 pipe laying578 m Under construction · works since 13 July 2026, planned until 17 September 2027 Source: Stadt Wien · 7 records · checked 16 October 2026
-
Pipes and cables Wien 16., /17., Sandleiteng. # Nietzschepl. über Güpferlingstr. b. Alszeile # Grünbeckweg + 17., Alszeile v. # Güpferlingstr. b. # Alsg. – Wasserrohrausw.666 m Tendered · contract period 11 January 2027 – 30 November 2027 Source: TED (EU tenders) · 2 records · checked 16 October 2026· Found automatically. Check with the source.
History (2)
- tender published (TED 716974-2026)
- tender published (TED 717965-2026)
-
Building Stadt Wien - Wiener Wohnen - 18., Lacknergasse 96 - Baumeister917 m Contract awarded 25 June 2026 Source: Kerndaten (public tenders) · 20 records · checked 10 October 2026· Found automatically. Check with the source.
History (20)
- award published (Kerndaten)
- award published (Kerndaten)
- award published (Kerndaten)
- award published (Kerndaten)
- award published (Kerndaten)
- award published (Kerndaten)
- award published (Kerndaten)
- award published (Kerndaten)
-
Building 1180 Wien, Klostergasse 25, Funktionssanierung und Erweiterung AHS Klostergasse, Baumeisterarbeiten980 m Contract awarded · contract period 1 September 2024 – 30 October 2026 · end moved 183 days later since first listed Source: TED (EU tenders) · 22 records · checked 10 October 2026· Found automatically. Check with the source.
History (22)
- tender published (TED 110884-2025)
- award published (TED 233865-2025)
- tender published (TED 381244-2025)
- tender published (TED 429755-2025)
- award published (TED 500364-2025)
- award published (TED 500427-2025)
- award published (TED 635578-2025)
- award published (TED 635897-2025)
-
Building WSC I Generalunternehmerleistungen +999 m Contract awarded 4 December 2025 Source: TED (EU tenders) · 2 records · checked 10 October 2026· Found automatically. Check with the source.
History (2)
- tender published (TED 100126-2024)
- award published (TED 836051-2025)
-
Public transport U5, 5. Ausbauphase1,000 m Planned · opening planned for 2035 Source: Stadt Wien · 42 records · checked 16 October 2026
From the City of Vienna (construction sites that affect traffic, zoning procedures, building freezes, planned U-Bahn, tram and major roads), public tenders, the Freedom of Information register and environmental impact assessments. We have recorded these sources every day since 10 October 2026. A moved end date shows as a delay. Private building sites appear only where they affect traffic or were tendered publicly.
All projects in Vienna → Know of a project that is missing? Tell us
The address in figures
Noise
- Loudest facade (day–evening–night level)
- road 55–59 dB
- Quiet side
- no
Getting around
- Public transport class
- B
- Nearest stop
- Wien Alsegger Straße, 2 min walk, every 9 min
- Frequent service (every 10 min or more often)
- Wien Alsegger Straße, 2 min walk, every 9 min
On foot
- Supermarket
- 1 min
- Pharmacy
- 2 min
- Doctor's practice
- 3 min
- Crèche
- 3 min
- Kindergarten
- 3 min
- Primary school
- 5 min
- Middle school
- 12 min
- Playground
- 6 min
Green and air
- Green and open land within 300 m
- 13 %
- Nearest park
- Turnplatz Turnverein Gersthof, 3 min walk
- Nearest forest
- unnamed, 10 min walk
- NO₂ / PM2.5, modelled 2022
- 27.9 / 11.3 µg/m³
- Heat days per year, now → around 2050
- –
Hazards and rules
- Flooding
- outside mapped flood areas
- Zoning
- residential
- Protection zones
- outside all zones
Residents
- Residents within 300 m
- 2,850 · about as densely populated as most of Vienna
- Who lives in the neighbourhood
- a typical age mix for Vienna
Prices
- Apartments, average €/m² by building age
- € 4,470–5,735 (the Währing district)
The full report explains every figure, chapter by chapter, with what to check before you sign →
Sources: BEV cadastre and address register, Stadt Wien OGD (zoning, flood and protection zones, facility registers), BMLUK noise and flood maps, WLV hazard zones, ÖROK ÖV-Güteklassen 2025, European Environment Agency, Statistik Austria, © OpenStreetMap contributors. CC BY 4.0 / ODbL. Lagecheck processed the data. All sources and licences →