Your address
Trogergasse 3
1140 Wien · 14. Penzing
The LAGE score
This building
Modest · better than 24 % of all addresses in Vienna
The neighbourhood
Linzer Straße / Pfadenhauergasse area · Weak · Vienna average: 65.
| Score | This building | Neighbourhood | Vienna |
|---|---|---|---|
| LQuietness | 32 | 17 | 87 |
| LAir quality | 50 | 29 | 46 |
| APublic transport | 90 | 100 | 90 |
| GGreen space | 32 | 43 | 53 |
| GNatural hazards | 100 | 100 | 100 |
| EEveryday amenities | 97 | 97 | 97 |
0–100, higher is better. The neighbourhood and city columns show the average score of all their addresses, scored with the same rules.
LAGE stands for Lärm & Luft (noise & air) · Anbindung (transport links) · Grün & Gefahren (green & hazards) · Erledigungen (everyday errands). How it is calculated →
Set your priorities to see your own LAGE for this building →
The neighbourhood in figures
- Loud road facade (≥ 65 dB Lden)
- 55 % of addresses
- Free of mapped noise ≥ 55 dB at the building
- 0 %
- Inside a 30- or 100-year flood area
- 0 %
- Public transport class A or B
- 100 %
- Green & open land within 300 m (average)
- 8 %
- Distance to the nearest park or forest (average)
- 214 m
- Residents
- 1,268 · more densely populated than most of Vienna
Building works and projects nearby
This address lies beyond the reach of every construction site, zoning change and planned line. 12 more projects within 1 km.
Further away, within 1 km (12)
-
New quarter Cumberlandstraße 38323 m Approved 2018 Source: Stadt Wien · checked 16 October 2026
-
Building Generalunternehmerleistungen für das Projekt „Wohnhausanlage Penzinger Straße 72, 1140 Wien“413 m Contract awarded 27 November 2025 Source: Kerndaten (public tenders) · checked 10 October 2026· Found automatically. Check with the source.
-
New quarter Penzinger Straße 76 (5,5 MB)420 m Approved 2018 Source: Stadt Wien · checked 16 October 2026
-
Public transport Attraktivierung der Verbindungsbahn (ÖBB-Strecke 12201 Wien Hütteldorf - Wien Praterstern, ÖBB-Strecke 12101 Wien Penzing - Abzweigung Hütteldorf, ÖBB-Strecke 10615 Wien Maxing - Wien Matzleinsdorf-Altmannsdorf)427 m Approval pending Source: Umweltbundesamt (environmental impact assessment) · checked 16 October 2026 · route © OpenStreetMap contributors
-
Zoning change Meiselstraße586 m Zoning in progress · draft on public display 5 August 2026 – 16 September 2026; building freeze until 5 March 2027 Source: Stadt Wien · 2 records · checked 16 October 2026
History (2)
- building freeze announced
- procedure stage: Nach öffentlicher Auflage
-
Pipes and cables 14., Hadikgasse von Kennedybrücke bis Einwanggasse sewer works634 m Under construction · works since 10 June 2025, planned until 2 July 2027 Source: Stadt Wien · 7 records · checked 16 October 2026
-
New quarter Kendlerstraße687 m Approved 2020 Source: Stadt Wien · checked 16 October 2026
-
New quarter Kendlerstraße - Nachtrag687 m Approved 2025 Source: Stadt Wien · checked 16 October 2026
-
Zoning change Johnstraße697 m Approved · draft on public display 6 May 2026 – 17 June 2026; building freeze until 6 December 2026 Source: Stadt Wien · 2 records · checked 15 October 2026
History (2)
- building freeze announced
- procedure stage: Genehmigt
-
New quarter Spallartgasse791 m Approved 2018 Source: Stadt Wien · checked 16 October 2026
-
Building Bildungsdirektion für Wien - Teil-Generalunternehmerarbeiten für WC-Gruppen Sanierung in 1140 Wien, Linzerstraße 146905 m Contract awarded 8 June 2026 Source: Kerndaten (public tenders) · 5 records · checked 10 October 2026· Found automatically. Check with the source.
History (5)
- award published (Kerndaten)
- award published (Kerndaten)
- award published (Kerndaten)
- award published (Kerndaten)
- award published (Kerndaten)
-
Building 1150 Wien Avedikstr - Tausch von ca 85 lfm Fernheizleitungen - Tiefbauarbeiten und Fernheizleitungstausch916 m Contract awarded 19 September 2025 Source: Kerndaten (public tenders) · checked 10 October 2026· Found automatically. Check with the source.
From the City of Vienna (construction sites that affect traffic, zoning procedures, building freezes, planned U-Bahn, tram and major roads), public tenders, the Freedom of Information register and environmental impact assessments. We have recorded these sources every day since 10 October 2026. A moved end date shows as a delay. Private building sites appear only where they affect traffic or were tendered publicly.
All projects in Vienna → Know of a project that is missing? Tell us
The address in figures
Noise
- Loudest facade (day–evening–night level)
- road 60–64 dB, rail 70–74 dB
- Quiet side
- yes
Getting around
- Public transport class
- B
- Nearest stop
- Wien Diesterweggasse, 3 min walk, every 6 min
- Frequent service (every 10 min or more often)
- Wien Diesterweggasse, 3 min walk, every 6 min
On foot
- Supermarket
- 1 min
- Pharmacy
- 4 min
- Doctor's practice
- 6 min
- Crèche
- 6 min
- Kindergarten
- 5 min
- Primary school
- 4 min
- Middle school
- 10 min
- Playground
- 6 min
Green and air
- Green and open land within 300 m
- 5 %
- Nearest park
- Reinlpark, 6 min walk
- Nearest forest
- unnamed, 9 min walk
- NO₂ / PM2.5, modelled 2022
- 25.0 / 10.7 µg/m³
- Heat days per year, now → around 2050
- –
Hazards and rules
- Flooding
- outside mapped flood areas
- Zoning
- core / mixed use
- Protection zones
- outside all zones
Residents
- Residents within 300 m
- 4,656 · more densely populated than most of Vienna
- Who lives in the neighbourhood
- a typical age mix for Vienna
Prices
- Apartments, average €/m² by building age
- € 3,694–5,796 (the Penzing district)
The full report explains every figure, chapter by chapter, with what to check before you sign →
Sources: BEV cadastre and address register, Stadt Wien OGD (zoning, flood and protection zones, facility registers), BMLUK noise and flood maps, WLV hazard zones, ÖROK ÖV-Güteklassen 2025, European Environment Agency, Statistik Austria, © OpenStreetMap contributors. CC BY 4.0 / ODbL. Lagecheck processed the data. All sources and licences →