Your address
Turnergasse 15
1150 Wien · 15. Rudolfsheim-Fünfhaus
The LAGE score
This building
Fair · better than 41 % of all addresses in Vienna
The neighbourhood
Herklotzgasse area · Fair · Vienna average: 65.
| Score | This building | Neighbourhood | Vienna |
|---|---|---|---|
| LQuietness | 59 | 67 | 87 |
| LAir quality | 46 | 46 | 46 |
| APublic transport | 100 | 100 | 90 |
| GGreen space | 35 | 38 | 53 |
| GNatural hazards | 100 | 100 | 100 |
| EEveryday amenities | 100 | 100 | 97 |
0–100, higher is better. The neighbourhood and city columns show the average score of all their addresses, scored with the same rules.
LAGE stands for Lärm & Luft (noise & air) · Anbindung (transport links) · Grün & Gefahren (green & hazards) · Erledigungen (everyday errands). How it is calculated →
Set your priorities to see your own LAGE for this building →
The neighbourhood in figures
- Loud road facade (≥ 65 dB Lden)
- 14 % of addresses
- Free of mapped noise ≥ 55 dB at the building
- 0 %
- Inside a 30- or 100-year flood area
- 0 %
- Public transport class A or B
- 100 %
- Green & open land within 300 m (average)
- 4 %
- Distance to the nearest park or forest (average)
- 220 m
- Residents
- 955 · more densely populated than most of Vienna
Building works and projects nearby
This address lies beyond the reach of every construction site, zoning change and planned line. 12 more projects within 1 km.
Further away, within 1 km (12)
-
Roads and bridges Mariahilfer Straße von Linzer Straße und Anschützgasse und Zollernsperggasse bis Sperrgasse und Talg road works229 m Under construction · works since 13 April 2026, planned until 30 April 2027 Source: Stadt Wien, TED (EU tenders), Kerndaten (public tenders) · 30 records · checked 16 October 2026
History (10)
- award published (Kerndaten)
- tender published (TED 862003-2025)
- tender published (TED 247267-2026)
- award published (TED 256589-2026)
- award published (Kerndaten)
- award published (Kerndaten)
- award published (TED 552509-2026)
- listed by the city
-
Zoning change Plandokument 8414: Gebiet zwischen Ullmannstraße, Karl-Walther-Gasse, Graumanngasse und Pfeiffergasse283 m Zoning in progress 18 May 2026 Source: data.gv.at (information requests) · checked 10 October 2026
-
Building Generalunternehmerleistungen für die Generalsanierung einer Schule in der Mittelgasse 24 / Spalowskygasse 5, 1060 Wien; Zusatzleistungen hinsichtlich eines Dachausbaus384 m Contract awarded 4 November 2024 Source: TED (EU tenders) · checked 10 October 2026· Found automatically. Check with the source.
-
Building MOLL - Mollardgasse 87 - brandschutztechnische Verbesserungsmaßnahmen - Gewerk Baumeister520 m Contract awarded 24 October 2024 Source: Kerndaten (public tenders) · 9 records · checked 10 October 2026· Found automatically. Check with the source.
History (9)
- award published (Kerndaten)
- award published (Kerndaten)
- award published (Kerndaten)
- award published (Kerndaten)
- award published (Kerndaten)
- award published (Kerndaten)
- award published (Kerndaten)
- award published (Kerndaten)
-
Building 1150 Wien Avedikstr - Tausch von ca 85 lfm Fernheizleitungen - Tiefbauarbeiten und Fernheizleitungstausch525 m Contract awarded 19 September 2025 Source: Kerndaten (public tenders) · checked 10 October 2026· Found automatically. Check with the source.
-
Building KH BHS - MR - Baumeister784 m Tendered · contract period 1 March 2027 – 30 June 2028 Source: TED (EU tenders) · 3 records · checked 10 October 2026· Found automatically. Check with the source.
History (3)
- tender published (TED 523155-2026)
- tender published (TED 523852-2026)
- tender published (TED 525201-2026)
-
Building 07., Apollogasse811 m Planned · developer competition 2020 · 159 flats Source: Stadt Wien · checked 16 October 2026
-
Building REIC | Generalunternehmerleistungen für die Generalsanierung der Ganztagsvolksschule in 1150 Wien, Reichsapfelgasse 30822 m Contract awarded · contract period 6 May 2025 – 21 January 2028 Source: TED (EU tenders), Kerndaten (public tenders) · 3 records · checked 10 October 2026· Found automatically. Check with the source.
History (3)
- tender published (TED 689725-2024)
- award published (Kerndaten)
- award published (TED 303483-2025)
-
Pipes and cables Schönbrunner Straße von 247 bis 257 sewer works917 m Under construction · works since 5 July 2026, planned until 31 December 2027 Source: Stadt Wien · 7 records · checked 16 October 2026
-
Building 1060 Wien, Webg. 2a - Sanierung, Bestandssanierung, Generalsanierung ME 4 / Top 10947 m Contract awarded 16 June 2025 Source: Kerndaten (public tenders) · checked 10 October 2026· Found automatically. Check with the source.
-
Public transport Märzstraße 49 bis Kreuzung Huglgasse sowie Kreuzung Huglgasse bis Kreuzung Hütteldorfer Straße track works974 m Under construction · works since 14 September 2026, planned until 15 November 2026 Source: Stadt Wien · 7 records · checked 16 October 2026
-
Building GU Baumeisterarbeiten, Berufsschule 1120 Wien, Längenfeldgasse 13-15982 m Contract awarded · contract period 26 May 2025 – 1 October 2027 Source: TED (EU tenders), Kerndaten (public tenders) · 18 records · checked 10 October 2026· Found automatically. Check with the source.
History (18)
- award published (TED 480164-2025)
- award published (Kerndaten)
- tender published (TED 58925-2026)
- tender published (TED 103387-2026)
- award published (TED 317420-2026)
- award published (Kerndaten)
- award published (TED 329842-2026)
- award published (Kerndaten)
From the City of Vienna (construction sites that affect traffic, zoning procedures, building freezes, planned U-Bahn, tram and major roads), public tenders, the Freedom of Information register and environmental impact assessments. We have recorded these sources every day since 10 October 2026. A moved end date shows as a delay. Private building sites appear only where they affect traffic or were tendered publicly.
All projects in Vienna → Know of a project that is missing? Tell us
The address in figures
Noise
- Loudest facade (day–evening–night level)
- road 60–64 dB, rail 65–69 dB
- Quiet side
- yes
Getting around
- Public transport class
- A
- Nearest stop
- Wien Gumpendorfer Straße, 2 min walk, every 1 min
- Frequent service (every 10 min or more often)
- Wien Gumpendorfer Straße, 2 min walk, every 1 min
On foot
- Supermarket
- 3 min
- Pharmacy
- 3 min
- Doctor's practice
- 1 min
- Crèche
- 2 min
- Kindergarten
- 2 min
- Primary school
- 2 min
- Middle school
- 2 min
- Playground
- 4 min
Green and air
- Green and open land within 300 m
- 4 %
- Nearest park
- Franz-Schwarz-Park, 4 min walk
- Nearest forest
- –
- NO₂ / PM2.5, modelled 2022
- 26.1 / 11.0 µg/m³
- Heat days per year, now → around 2050
- –
Hazards and rules
- Flooding
- outside mapped flood areas
- Zoning
- residential
- Protection zones
- outside all zones
Residents
- Residents within 300 m
- 6,669 · more densely populated than most of Vienna
- Who lives in the neighbourhood
- younger residents than in most of Vienna; more people between 15 and 29; fewer children
Prices
- Apartments, average €/m² by building age
- € 3,591–4,905 (the Rudolfsheim-Fünfhaus district)
The full report explains every figure, chapter by chapter, with what to check before you sign →
Sources: BEV cadastre and address register, Stadt Wien OGD (zoning, flood and protection zones, facility registers), BMLUK noise and flood maps, WLV hazard zones, ÖROK ÖV-Güteklassen 2025, European Environment Agency, Statistik Austria, © OpenStreetMap contributors. CC BY 4.0 / ODbL. Lagecheck processed the data. All sources and licences →