Your address
Walcherstraße 1A
1020 Wien · 2. Leopoldstadt
The LAGE score
This building
Fair · better than 66 % of all addresses in Vienna
The neighbourhood
Bruno-Marek-Allee area · Fair · Vienna average: 65.
| Score | This building | Neighbourhood | Vienna |
|---|---|---|---|
| LQuietness | 95 | 75 | 87 |
| LAir quality | 32 | 32 | 46 |
| APublic transport | 90 | 90 | 90 |
| GGreen space | 56 | 64 | 53 |
| GNatural hazards | 100 | 100 | 100 |
| EEveryday amenities | 100 | 100 | 97 |
0–100, higher is better. The neighbourhood and city columns show the average score of all their addresses, scored with the same rules.
LAGE stands for Lärm & Luft (noise & air) · Anbindung (transport links) · Grün & Gefahren (green & hazards) · Erledigungen (everyday errands). How it is calculated →
Set your priorities to see your own LAGE for this building →
The neighbourhood in figures
- Loud road facade (≥ 65 dB Lden)
- 22 % of addresses
- Free of mapped noise ≥ 55 dB at the building
- 16 %
- Inside a 30- or 100-year flood area
- 0 %
- Public transport class A or B
- 99 %
- Green & open land within 300 m (average)
- 19 %
- Distance to the nearest park or forest (average)
- 75 m
- Residents
- 15,764 · more densely populated than most of Vienna
Building works and projects nearby
This address lies beyond the reach of every construction site, zoning change and planned line. 12 more projects within 1 km.
Further away, within 1 km (12)
-
Public transport ÖBB Wohnprogramm, 1020 Wien, Mühlfeldgasse 15 & 16 - Generalunternehmerleistungen Bau278 m Contract awarded 23 June 2025 Source: Kerndaten (public tenders) · checked 10 October 2026· Found automatically. Check with the source.
-
Pipes and cables Nordbahnstraße von Alliiertenstraße bis Am Tabor pipe laying291 m Under construction · works since 26 July 2026, planned until 1 November 2026 Source: Stadt Wien · 7 records · checked 16 October 2026
-
Roads and bridges (ProVia-ID 140655) SBW-St; Bau; Baumeisterarbeiten Wien Mitte - Baumeisterarbeiten Wien Mitte - Praterstern (M14,16,17,20,21,22,32,33,38)292 m Contract awarded 31 May 2026 Source: TED (EU tenders), Kerndaten (public tenders) · 11 records · checked 15 October 2026· Found automatically. Check with the source.
History (11)
- award published (Kerndaten)
- award published (TED 375124-2026)
- award published (Kerndaten)
- award published (Kerndaten)
- award published (Kerndaten)
- tender published (Kerndaten)
- tender published (Kerndaten)
- tender published (Kerndaten)
-
Roads and bridges Praterstern von Kreuzung Franzensbrückenstraße bis Kreuzung Hauptallee works on a special structure308 m Under construction · works since 14 September 2026, planned until 30 November 2026 Source: Stadt Wien · 7 records · checked 16 October 2026
-
Building A23 Südosttangente Wien, GE Kn Prater - ASt Handelskai, km 10,596 - km 12,287517 m Contract awarded · contract period 8 July 2024 – 31 October 2031 Source: TED (EU tenders) · 24 records · checked 10 October 2026· Found automatically. Check with the source.
History (24)
- award published (TED 197646-2026)
- award published (TED 204964-2026)
- award published (TED 218285-2026)
- award published (TED 239657-2026)
- award published (TED 287541-2026)
- award published (TED 411646-2026)
- award published (TED 524521-2026)
- award published (TED 644329-2026)
-
Pipes and cables Kanalsanierung und Hybridanlage - Schule Wien 2, Vereinsgasse 29620 m Contract awarded 12 December 2025 Source: data.gv.at (information requests) · checked 10 October 2026· Found automatically. Check with the source.
-
Building 02., Radingerstraße 21 - Baumeister- und Fenstertauscharbeiten665 m Contract awarded 21 September 2026 Source: Kerndaten (public tenders) · 7 records · checked 15 October 2026· Found automatically. Check with the source.
History (7)
- award published (Kerndaten)
- award published (Kerndaten)
- award published (Kerndaten)
- award published (Kerndaten)
- award published (Kerndaten)
- award published (Kerndaten)
- tender published (Kerndaten)
-
Building 02., Lassallestraße 40706 m Tendered · contract period 15 March 2027 – 15 May 2030 Source: TED (EU tenders) · 2 records · checked 16 October 2026· Found automatically. Check with the source.
History (2)
- tender published (TED 617155-2026)
- tender published (TED 707498-2026)
-
Roads and bridges (ProVia-ID 116375) Technische Freimachung Wien Nordwestbahnhof; Abbrucharbeiten714 m Contract awarded · contract period 2 September 2024 – 1 September 2028 Source: TED (EU tenders) · 2 records · checked 10 October 2026· Found automatically. Check with the source.
History (2)
- tender published (TED 281451-2024)
- award published (TED 492315-2024)
-
Building 20., Nordwestbahnhof – Phase A.2739 m Tendered · 100 flats Source: Stadt Wien · checked 16 October 2026
-
Pipes and cables Ausstellungsstraße von 21 bis 23 pipe laying753 m Under construction · works since 7 June 2026, planned until 31 March 2027 Source: Stadt Wien · 7 records · checked 16 October 2026
-
Building Stadt Wien - Wiener Wohnen - 02., Mexikoplatz 25 - Baumeister758 m Contract awarded 25 June 2025 Source: Kerndaten (public tenders) · 9 records · checked 10 October 2026· Found automatically. Check with the source.
History (9)
- award published (Kerndaten)
- award published (Kerndaten)
- award published (Kerndaten)
- award published (Kerndaten)
- award published (Kerndaten)
- award published (Kerndaten)
- award published (Kerndaten)
- award published (Kerndaten)
From the City of Vienna (construction sites that affect traffic, zoning procedures, building freezes, planned U-Bahn, tram and major roads), public tenders, the Freedom of Information register and environmental impact assessments. We have recorded these sources every day since 10 October 2026. A moved end date shows as a delay. Private building sites appear only where they affect traffic or were tendered publicly.
All projects in Vienna → Know of a project that is missing? Tell us
The address in figures
Noise
- Loudest facade (day–evening–night level)
- below 55 dB
- Quiet side
- –
Getting around
- Public transport class
- B
- Nearest stop
- Wien Joseph-Roth-Gasse, 2 min walk, every 17 min
- Frequent service (every 10 min or more often)
- Wien Krakauer Straße, 4 min walk, every 6 min
On foot
- Supermarket
- 3 min
- Pharmacy
- 1 min
- Doctor's practice
- 1 min
- Crèche
- 1 min
- Kindergarten
- 1 min
- Primary school
- 6 min
- Middle school
- 8 min
- Playground
- 2 min
Green and air
- Green and open land within 300 m
- 14 %
- Nearest park
- Franziska-Löw-Park, 2 min walk
- Nearest forest
- unnamed, 12 min walk
- NO₂ / PM2.5, modelled 2022
- 30.4 / 11.6 µg/m³
- Heat days per year, now → around 2050
- –
Hazards and rules
- Flooding
- outside mapped flood areas
- Zoning
- core / mixed use
- Protection zones
- outside all zones
Residents
- Residents within 300 m
- 2,413 · about as densely populated as most of Vienna
- Who lives in the neighbourhood
- younger residents than in most of Vienna; more children; fewer older people
Prices
- Apartments, average €/m² by building age
- € 4,603–6,369 (the Leopoldstadt district)
The full report explains every figure, chapter by chapter, with what to check before you sign →
Sources: BEV cadastre and address register, Stadt Wien OGD (zoning, flood and protection zones, facility registers), BMLUK noise and flood maps, WLV hazard zones, ÖROK ÖV-Güteklassen 2025, European Environment Agency, Statistik Austria, © OpenStreetMap contributors. CC BY 4.0 / ODbL. Lagecheck processed the data. All sources and licences →