Your address

Waldmüllergasse 27

1200 Wien · 20. Brigittenau

The outline marks the neighbourhood Sachsenplatz area, with 70 addresses.worksplannedzoning change · projects nearby

The LAGE score

This building

Weak · better than 4 % of all addresses in Vienna

The neighbourhood

Sachsenplatz area · Modest · Vienna average: 65.

ScoreThis buildingNeighbourhoodVienna
LQuietness 5 3987
LAir quality 29 2946
APublic transport 90 10090
GGreen space 46 4753
GNatural hazards 100 100100
EEveryday amenities 100 10097

0–100, higher is better. The neighbourhood and city columns show the average score of all their addresses, scored with the same rules.

LAGE stands for Lärm & Luft (noise & air) · Anbindung (transport links) · Grün & Gefahren (green & hazards) · Erledigungen (everyday errands). How it is calculated →

Set your priorities to see your own LAGE for this building →

The neighbourhood in figures

Loud road facade (≥ 65 dB Lden)
64 % of addresses
Free of mapped noise ≥ 55 dB at the building
3 %
Inside a 30- or 100-year flood area
0 %
Public transport class A or B
100 %
Green & open land within 300 m (average)
6 %
Distance to the nearest park or forest (average)
65 m
Protection zone (Schutzzone)
24 %
Residents
1,982 · more densely populated than most of Vienna
The neighbourhood report →

Building works and projects nearby

1 project reaches this address. 12 more projects within 1 km.

Works and changes that reach this address

Further away, within 1 km (12)
  • Public transport Linie 12: Stufe 2 Nordwestbahnhof
    164 m Planned Source: Stadt Wien · 7 records · checked 16 October 2026
  • Building Generalunternehmervertrag: 20., Wallensteinstraße 68-72
    204 m Tendered · contract period 1 March 2027 – 31 August 2029 Source: TED (EU tenders) · checked 10 October 2026· Found automatically. Check with the source.
  • New quarter Städtebauvorhaben Nordwestbahnhof
    373 m Approved 2022 Source: Umweltbundesamt (environmental impact assessment) · checked 16 October 2026
  • Building 1200 Wien, Unterbergergasse 1, Sanierung WCs - Baumeister / Ausbau
    402 m Contract awarded 6 July 2026 Source: Kerndaten (public tenders) · 23 records · checked 10 October 2026· Found automatically. Check with the source.
    History (23)
    1. award published (Kerndaten)
    2. award published (Kerndaten)
    3. award published (Kerndaten)
    4. award published (Kerndaten)
    5. award published (Kerndaten)
    6. award published (Kerndaten)
    7. award published (Kerndaten)
    8. award published (Kerndaten)
  • Pipes and cables Donaueschingenstraße von Dresdner Straße bis Leystraße pipe laying
    417 m Under construction · works since 31 May 2026, planned until 30 October 2026 Source: Stadt Wien · 7 records · checked 16 October 2026
  • New quarter 20., Nordwestbahnhof
    422 m Tendered · 5700 flats Source: Stadt Wien · checked 16 October 2026
  • Building Stadt Wien - Wiener Wohnen - 20., Brigittaplatz 1 -2 - Blitzschutz
    516 m Contract awarded · contract period 21 June 2024 – 2 July 2028 · end moved 175 days later since first listed Source: TED (EU tenders), Kerndaten (public tenders) · 34 records · checked 10 October 2026· Found automatically. Check with the source.
    History (34)
    1. award published (Kerndaten)
    2. award published (TED 771326-2024)
    3. award published (TED 772328-2024)
    4. award published (Kerndaten)
    5. award published (TED 798528-2024)
    6. tender published (TED 569494-2025)
    7. award published (TED 68047-2026)
    8. award published (Kerndaten)
  • Roads and bridges 20., Jägerstraße 62-64, Stromstraße 14-16
    538 m Contract awarded · contract period 15 September 2025 – 3 May 2030 · end moved 687 days later since first listed Source: TED (EU tenders) · 4 records · checked 10 October 2026· Found automatically. Check with the source.
    History (4)
    1. tender published (TED 159194-2025)
    2. tender published (TED 258653-2025)
    3. tender published (TED 305702-2025)
    4. award published (TED 311376-2026)
  • Zoning change Plandokument 8461: Gebiet zwischen Innstraße (Bezirksgrenze), Linienzug 1-2 (Trasse ÖBB Nordbahn), Linienzug 2-3, Nordbahnstraße (Bezirksgrenze) und Dresdner St
    813 m Zoning in progress 25 November 2025 Source: data.gv.at (information requests) · checked 10 October 2026
  • Building BAUI.IM6009: Technische Freimachung Wien Nordwestbahnhof - Abbrucharbeiten
    819 m Contract awarded 28 September 2026 Source: Kerndaten (public tenders) · 4 records · checked 12 October 2026· Found automatically. Check with the source.
    History (4)
    1. award published (Kerndaten)
    2. award published (Kerndaten)
    3. award published (Kerndaten)
    4. award published (Kerndaten)
  • Building PPP-Projekt Bildungscampus Nordwestbahnhof (BC NWBHF Planung, Errichtung, Finanzierung und Verfügbarhaltung) Adresse: 20., Rebhanngasse
    819 m Contract awarded · since 1 June 2026 Source: TED (EU tenders) · 2 records · checked 10 October 2026· Found automatically. Check with the source.
    History (2)
    1. tender published (TED 587888-2024)
    2. award published (TED 326240-2026)
  • Pipes and cables Kanal-Instandsetzung inkl. Einbau von vier Hybridpumpenanlagen und Baumeister Erdbauarbeiten, Amtshaus 20., Stromstraße 34
    819 m Contract awarded 20 July 2026 Source: data.gv.at (information requests) · checked 10 October 2026· Found automatically. Check with the source.

From the City of Vienna (construction sites that affect traffic, zoning procedures, building freezes, planned U-Bahn, tram and major roads), public tenders, the Freedom of Information register and environmental impact assessments. We have recorded these sources every day since 10 October 2026. A moved end date shows as a delay. Private building sites appear only where they affect traffic or were tendered publicly.

The address in figures

Noise

Loudest facade (day–evening–night level)
road 70–74 dB
Quiet side
no

Getting around

Public transport class
B
Nearest stop
Wien Brigittagasse, 3 min walk, every 10 min
Frequent service (every 10 min or more often)
Wien Brigittagasse, 3 min walk, every 10 min

On foot

Supermarket
4 min
Pharmacy
2 min
Doctor's practice
3 min
Crèche
5 min
Kindergarten
4 min
Primary school
4 min
Middle school
4 min
Playground
2 min

Green and air

Green and open land within 300 m
6 %
Nearest park
Sachsenpark, 1 min walk
Nearest forest
unnamed, 9 min walk
NO₂ / PM2.5, modelled 2022
31.2 / 11.6 µg/m³
Heat days per year, now → around 2050
–

Hazards and rules

Flooding
outside mapped flood areas
Zoning
core / mixed use
Protection zones
outside all zones

Residents

Residents within 300 m
5,539 · more densely populated than most of Vienna
Who lives in the neighbourhood
younger residents than in most of Vienna

Prices

Apartments, average €/m² by building age
€ 3,569–5,058 (the Brigittenau district)

The full report explains every figure, chapter by chapter, with what to check before you sign →

Sources: BEV cadastre and address register, Stadt Wien OGD (zoning, flood and protection zones, facility registers), BMLUK noise and flood maps, WLV hazard zones, ÖROK ÖV-Güteklassen 2025, European Environment Agency, Statistik Austria, © OpenStreetMap contributors. CC BY 4.0 / ODbL. Lagecheck processed the data. All sources and licences →