Your address

Wallensteinstraße 68 - 72

1200 Wien · 20. Brigittenau

The outline marks the neighbourhood Heistergasse area, with 9 addresses.worksplannedzoning change · projects nearby

The LAGE score

This building

Fair · better than 41 % of all addresses in Vienna

The neighbourhood

Heistergasse area · Fair · Vienna average: 65.

ScoreThis buildingNeighbourhoodVienna
LQuietness 67 5587
LAir quality 29 2946
APublic transport 100 10090
GGreen space 48 4953
GNatural hazards 100 100100
EEveryday amenities 100 10097

0–100, higher is better. The neighbourhood and city columns show the average score of all their addresses, scored with the same rules.

LAGE stands for Lärm & Luft (noise & air) · Anbindung (transport links) · Grün & Gefahren (green & hazards) · Erledigungen (everyday errands). How it is calculated →

Set your priorities to see your own LAGE for this building →

The neighbourhood in figures

Loud road facade (≥ 65 dB Lden)
33 % of addresses
Free of mapped noise ≥ 55 dB at the building
0 %
Inside a 30- or 100-year flood area
0 %
Public transport class A or B
100 %
Green & open land within 300 m (average)
10 %
Distance to the nearest park or forest (average)
104 m
Residents
342 · more densely populated than most of Vienna
The neighbourhood report →

Building works and projects nearby

4 projects reach this address. 12 more projects within 1 km.

Works and changes that reach this address

Further away, within 1 km (12)
  • Building 1200 Wien, Unterbergergasse 1, Sanierung WCs - Baumeister / Ausbau
    245 m Contract awarded 6 July 2026 Source: Kerndaten (public tenders) · 23 records · checked 10 October 2026· Found automatically. Check with the source.
    History (23)
    1. award published (Kerndaten)
    2. award published (Kerndaten)
    3. award published (Kerndaten)
    4. award published (Kerndaten)
    5. award published (Kerndaten)
    6. award published (Kerndaten)
    7. award published (Kerndaten)
    8. award published (Kerndaten)
  • New quarter 20., Nordwestbahnhof
    304 m Tendered · 5700 flats Source: Stadt Wien · checked 16 October 2026
  • Pipes and cables Donaueschingenstraße von Dresdner Straße bis Leystraße pipe laying
    522 m Under construction · works since 31 May 2026, planned until 30 October 2026 Source: Stadt Wien · 7 records · checked 16 October 2026
  • Building Stadt Wien - Wiener Wohnen - 20., Brigittaplatz 1 -2 - Blitzschutz
    556 m Contract awarded · contract period 21 June 2024 – 2 July 2028 · end moved 175 days later since first listed Source: TED (EU tenders), Kerndaten (public tenders) · 34 records · checked 10 October 2026· Found automatically. Check with the source.
    History (34)
    1. award published (Kerndaten)
    2. award published (TED 771326-2024)
    3. award published (TED 772328-2024)
    4. award published (Kerndaten)
    5. award published (TED 798528-2024)
    6. tender published (TED 569494-2025)
    7. award published (TED 68047-2026)
    8. award published (Kerndaten)
  • Building BAUI.IM6009: Technische Freimachung Wien Nordwestbahnhof - Abbrucharbeiten
    639 m Contract awarded 28 September 2026 Source: Kerndaten (public tenders) · 4 records · checked 12 October 2026· Found automatically. Check with the source.
    History (4)
    1. award published (Kerndaten)
    2. award published (Kerndaten)
    3. award published (Kerndaten)
    4. award published (Kerndaten)
  • Building PPP-Projekt Bildungscampus Nordwestbahnhof (BC NWBHF Planung, Errichtung, Finanzierung und Verfügbarhaltung) Adresse: 20., Rebhanngasse
    639 m Contract awarded · since 1 June 2026 Source: TED (EU tenders) · 2 records · checked 10 October 2026· Found automatically. Check with the source.
    History (2)
    1. tender published (TED 587888-2024)
    2. award published (TED 326240-2026)
  • Roads and bridges 20., Jägerstraße 62-64, Stromstraße 14-16
    671 m Contract awarded · contract period 15 September 2025 – 3 May 2030 · end moved 687 days later since first listed Source: TED (EU tenders) · 4 records · checked 10 October 2026· Found automatically. Check with the source.
    History (4)
    1. tender published (TED 159194-2025)
    2. tender published (TED 258653-2025)
    3. tender published (TED 305702-2025)
    4. award published (TED 311376-2026)
  • Zoning change Plandokument 8461: Gebiet zwischen Innstraße (Bezirksgrenze), Linienzug 1-2 (Trasse ÖBB Nordbahn), Linienzug 2-3, Nordbahnstraße (Bezirksgrenze) und Dresdner St
    711 m Zoning in progress 25 November 2025 Source: data.gv.at (information requests) · checked 10 October 2026
  • New quarter 20., Nordwestbahnhof – Phase A.1
    717 m Planned · developer competition 2025 · 520 flats Source: Stadt Wien · checked 16 October 2026
  • Building Heizung, Klimatechnik, Lüftung und Sanitär
    736 m Tendered · contract period 30 March 2026 – 28 June 2027 Source: TED (EU tenders) · 3 records · checked 10 October 2026· Found automatically. Check with the source.
    History (3)
    1. tender published (TED 629712-2025)
    2. tender published (TED 701861-2025)
    3. tender published (TED 705095-2025)
  • Building 20., Nordwestbahnhof – Phase A.2
    759 m Tendered · 100 flats Source: Stadt Wien · checked 16 October 2026
  • Zoning change Nordbahnhof-Innstraße
    762 m Zoning in progress · draft on public display 12 August 2026 – 23 September 2026; building freeze until 12 March 2027 Source: Stadt Wien · 2 records · checked 16 October 2026
    History (2)
    1. building freeze announced
    2. procedure stage: Nach öffentlicher Auflage

From the City of Vienna (construction sites that affect traffic, zoning procedures, building freezes, planned U-Bahn, tram and major roads), public tenders, the Freedom of Information register and environmental impact assessments. We have recorded these sources every day since 10 October 2026. A moved end date shows as a delay. Private building sites appear only where they affect traffic or were tendered publicly.

The address in figures

Noise

Loudest facade (day–evening–night level)
road 60–64 dB
Quiet side
yes

Getting around

Public transport class
A
Nearest stop
Wien Rauscherstraße, 3 min walk, every 4 min
Frequent service (every 10 min or more often)
Wien Rauscherstraße, 3 min walk, every 4 min

On foot

Supermarket
3 min
Pharmacy
1 min
Doctor's practice
1 min
Crèche
6 min
Kindergarten
5 min
Primary school
4 min
Middle school
4 min
Playground
2 min

Green and air

Green and open land within 300 m
7 %
Nearest park
Sachsenpark, 1 min walk
Nearest forest
unnamed, 6 min walk
NO₂ / PM2.5, modelled 2022
31.2 / 11.6 µg/m³
Heat days per year, now → around 2050
–

Hazards and rules

Flooding
outside mapped flood areas
Zoning
core / mixed use
Protection zones
outside all zones

Residents

Residents within 300 m
4,519 · more densely populated than most of Vienna
Who lives in the neighbourhood
younger residents than in most of Vienna; more children

Prices

Apartments, average €/m² by building age
€ 3,569–5,058 (the Brigittenau district)

The full report explains every figure, chapter by chapter, with what to check before you sign →

Sources: BEV cadastre and address register, Stadt Wien OGD (zoning, flood and protection zones, facility registers), BMLUK noise and flood maps, WLV hazard zones, ÖROK ÖV-Güteklassen 2025, European Environment Agency, Statistik Austria, © OpenStreetMap contributors. CC BY 4.0 / ODbL. Lagecheck processed the data. All sources and licences →