Your address
Westbahnstraße 37
1070 Wien · 7. Neubau
The LAGE score
This building
Weak · better than 2 % of all addresses in Vienna
The neighbourhood
Kaiserstraße / Seidengasse area · Weak · Vienna average: 65.
| Score | This building | Neighbourhood | Vienna |
|---|---|---|---|
| LQuietness | 5 | 5 | 87 |
| LAir quality | 13 | 13 | 46 |
| APublic transport | 100 | 100 | 90 |
| GGreen space | 49 | 52 | 53 |
| GNatural hazards | 100 | 100 | 100 |
| EEveryday amenities | 100 | 100 | 97 |
0–100, higher is better. The neighbourhood and city columns show the average score of all their addresses, scored with the same rules.
LAGE stands for Lärm & Luft (noise & air) · Anbindung (transport links) · Grün & Gefahren (green & hazards) · Erledigungen (everyday errands). How it is calculated →
Set your priorities to see your own LAGE for this building →
The neighbourhood in figures
- Loud road facade (≥ 65 dB Lden)
- 71 % of addresses
- Free of mapped noise ≥ 55 dB at the building
- 0 %
- Inside a 30- or 100-year flood area
- 0 %
- Public transport class A or B
- 100 %
- Green & open land within 300 m (average)
- 12 %
- Distance to the nearest park or forest (average)
- 108 m
- Protection zone (Schutzzone)
- 40 %
- Residents
- 665 · more densely populated than most of Vienna
Building works and projects nearby
This address lies beyond the reach of every construction site, zoning change and planned line. 11 more projects within 1 km.
Further away, within 1 km (11)
-
Building 07., Apollogasse409 m Planned · developer competition 2020 · 159 flats Source: Stadt Wien · checked 16 October 2026
-
Building 1070 Wien, Neustiftgasse 95-99, Dämmung oberste Geschoßdecke - Baumeisterarbeiten495 m Contract awarded 8 January 2025 Source: Kerndaten (public tenders) · 4 records · checked 10 October 2026· Found automatically. Check with the source.
History (4)
- award published (Kerndaten)
- award published (Kerndaten)
- award published (Kerndaten)
- award published (Kerndaten)
-
Building Mein Gesundheitszentrum Neubau - Teil-Generalunternehmer Rohbau671 m Tendered · contract period 15 September 2026 – 4 December 2030 Source: TED (EU tenders) · 6 records · checked 16 October 2026· Found automatically. Check with the source.
History (6)
- tender published (TED 465942-2026)
- tender published (TED 487766-2026)
- tender published (TED 490200-2026)
- tender published (TED 496163-2026)
- tender published (TED 593204-2026)
- tender published (TED 704637-2026)
-
Roads and bridges Burggasse 67 road works675 m Under construction · works since 27 July 2026, planned until 30 October 2026 Source: Stadt Wien · 7 records · checked 16 October 2026
-
Roads and bridges Albertgasse von Kreuzung Josef-Matthias-Hauer-Platz und Josefstädter Straße bis Kreuzung Florianigas road works699 m Under construction · works since 12 October 2026, planned until 1 September 2027 Source: Stadt Wien · 14 records · checked 16 October 2026
-
Building Stadt Wien - Wiener Wohnen - 08., Pfeilgasse 47-49 - Baumeister833 m Contract awarded · contract period 19 February 2025 – 1 May 2027 Source: TED (EU tenders), Kerndaten (public tenders) · 36 records · checked 10 October 2026· Found automatically. Check with the source.
History (36)
- award published (TED 318339-2025)
- award published (Kerndaten)
- award published (TED 435301-2025)
- award published (TED 435576-2025)
- award published (Kerndaten)
- award published (Kerndaten)
- award published (TED 622720-2025)
- award published (Kerndaten)
-
Public transport U2, 4. Ausbauphase843 m Under construction · opening planned for 2030 Source: Stadt Wien · 42 records · checked 16 October 2026
-
Public transport Kirchengasse 1 bis 30 U-Bahn construction874 m Under construction · works since 28 February 2021, planned until 31 December 2029 · part of U2, 4. Ausbauphase Source: Stadt Wien · 7 records · checked 16 October 2026
-
Building 1060 Wien, Amerlingstraße 6 / Küchenumbau / Baumeisterarbeiten966 m Contract awarded 27 May 2025 Source: Kerndaten (public tenders) · 12 records · checked 10 October 2026· Found automatically. Check with the source.
History (12)
- award published (Kerndaten)
- award published (Kerndaten)
- award published (Kerndaten)
- award published (Kerndaten)
- award published (Kerndaten)
- award published (Kerndaten)
- award published (Kerndaten)
- award published (Kerndaten)
-
Public transport Mariahilfer Straße von Stiftgasse bis Erika-Weinzierl-Platz und Kirchengasse track works985 m Under construction · works since 28 February 2021, planned until 31 December 2029 Source: Stadt Wien · 7 records · checked 16 October 2026
-
Building Generalunternehmerleistungen für die Generalsanierung einer Schule in der Mittelgasse 24 / Spalowskygasse 5, 1060 Wien; Zusatzleistungen hinsichtlich eines Dachausbaus996 m Contract awarded 4 November 2024 Source: TED (EU tenders) · checked 10 October 2026· Found automatically. Check with the source.
From the City of Vienna (construction sites that affect traffic, zoning procedures, building freezes, planned U-Bahn, tram and major roads), public tenders, the Freedom of Information register and environmental impact assessments. We have recorded these sources every day since 10 October 2026. A moved end date shows as a delay. Private building sites appear only where they affect traffic or were tendered publicly.
All projects in Vienna → Know of a project that is missing? Tell us
The address in figures
Noise
- Loudest facade (day–evening–night level)
- road ≥ 75 dB, rail 65–69 dB
- Quiet side
- yes
Getting around
- Public transport class
- A
- Nearest stop
- Wien Westbahnstraße/Kaiserstraße, 1 min walk, every 3 min
- Frequent service (every 10 min or more often)
- Wien Westbahnstraße/Kaiserstraße, 1 min walk, every 3 min
On foot
- Supermarket
- 1 min
- Pharmacy
- 4 min
- Doctor's practice
- 3 min
- Crèche
- 3 min
- Kindergarten
- 3 min
- Primary school
- 4 min
- Middle school
- 4 min
- Playground
- 2 min
Green and air
- Green and open land within 300 m
- 9 %
- Nearest park
- Mizzi-Langer-Kauba-Park, 2 min walk
- Nearest forest
- –
- NO₂ / PM2.5, modelled 2022
- 36.0 / 11.3 µg/m³
- Heat days per year, now → around 2050
- –
Hazards and rules
- Flooding
- outside mapped flood areas
- Zoning
- core / mixed use
- Protection zones
- old-town zone
Residents
- Residents within 300 m
- 6,088 · more densely populated than most of Vienna
- Who lives in the neighbourhood
- younger residents than in most of Vienna; fewer children
Prices
- Apartments, average €/m² by building age
- € 4,849–6,214 (the Neubau district)
The full report explains every figure, chapter by chapter, with what to check before you sign →
Sources: BEV cadastre and address register, Stadt Wien OGD (zoning, flood and protection zones, facility registers), BMLUK noise and flood maps, WLV hazard zones, ÖROK ÖV-Güteklassen 2025, European Environment Agency, Statistik Austria, © OpenStreetMap contributors. CC BY 4.0 / ODbL. Lagecheck processed the data. All sources and licences →