Your address

Wiesengasse 14

1090 Wien · 9. Alsergrund

The outline marks the neighbourhood Badgasse area, with 69 addresses.worksplannedzoning change · projects nearby

The LAGE score

This building

Modest · better than 29 % of all addresses in Vienna

The neighbourhood

Badgasse area · Modest · Vienna average: 65.

ScoreThis buildingNeighbourhoodVienna
LQuietness 67 6787
LAir quality 18 1846
APublic transport 100 10090
GGreen space 49 4353
GNatural hazards 100 100100
EEveryday amenities 100 10097

0–100, higher is better. The neighbourhood and city columns show the average score of all their addresses, scored with the same rules.

LAGE stands for Lärm & Luft (noise & air) · Anbindung (transport links) · Grün & Gefahren (green & hazards) · Erledigungen (everyday errands). How it is calculated →

Set your priorities to see your own LAGE for this building →

The neighbourhood in figures

Loud road facade (≥ 65 dB Lden)
39 % of addresses
Free of mapped noise ≥ 55 dB at the building
1 %
Inside a 30- or 100-year flood area
0 %
Public transport class A or B
100 %
Green & open land within 300 m (average)
5 %
Distance to the nearest park or forest (average)
107 m
Residents
1,452 · more densely populated than most of Vienna
The neighbourhood report →

Building works and projects nearby

1 project reaches this address. 9 more projects within 1 km.

Works and changes that reach this address

Further away, within 1 km (9)
  • Public transport Althanstraße 21-25 bis Augasse und Newaldgasse track works
    138 m Under construction · works since 21 September 2026, planned until 15 November 2026 Source: Stadt Wien · 7 records · checked 16 October 2026
  • Public transport ESTW Wien Franz-Josefs-Bahnhof, Errichtung Technikgebäude - Generalunternehmer, ESTW Wien Franz-Josefs-Bahnhof, Errichtung Technikgebäude
    218 m Contract awarded 30 April 2025 Source: Kerndaten (public tenders) · 5 records · checked 10 October 2026· Found automatically. Check with the source.
    History (5)
    1. award published (Kerndaten)
    2. award published (Kerndaten)
    3. award published (Kerndaten)
    4. award published (Kerndaten)
    5. award published (Kerndaten)
  • Building 1090 Wien, Althanstraße 14 / Augasse 2-6, Rückbau UZA 1 - Schadstoffentfrachtung Hörsäle
    241 m Contract awarded · contract period 7 January 2026 – 29 June 2029 · end moved 27 days later since first listed Source: TED (EU tenders) · 6 records · checked 12 October 2026· Found automatically. Check with the source.
    History (6)
    1. tender published (TED 644531-2025)
    2. award published (TED 24013-2026)
    3. tender published (TED 63634-2026)
    4. tender published (TED 113344-2026)
    5. tender published (TED 672864-2026)
    6. tender published (TED 682198-2026)
  • Building 20., Treustraße 61-69
    669 m Contract awarded · contract period 2 March 2026 – 2 April 2028 Source: TED (EU tenders) · 8 records · checked 14 October 2026· Found automatically. Check with the source.
    History (8)
    1. tender published (TED 216940-2022)
    2. award published (TED 472916-2022)
    3. tender published (TED 666724-2024)
    4. tender published (TED 699498-2024)
    5. tender published (TED 711235-2024)
    6. award published (TED 616730-2025)
    7. tender published (TED 603680-2026)
    8. tender published (TED 691881-2026)
  • Public transport U5, 5. Ausbauphase
    689 m Planned · opening planned for 2035 Source: Stadt Wien · 42 records · checked 16 October 2026
  • Building 1090 Wien, Sensengasse 2a-Universitätszahnklinik Wien - Schaden Akustikdecke- Baumeisterarbeiten
    780 m Contract awarded 26 May 2026 Source: Kerndaten (public tenders) · 16 records · checked 10 October 2026· Found automatically. Check with the source.
    History (16)
    1. award published (Kerndaten)
    2. award published (Kerndaten)
    3. award published (Kerndaten)
    4. award published (Kerndaten)
    5. award published (Kerndaten)
    6. award published (Kerndaten)
    7. award published (Kerndaten)
    8. award published (Kerndaten)
  • Building 1090 Wien, Michelbeuerngasse 6-10, HLMW 9, Abbrucharbeiten
    783 m Contract awarded 24 September 2025 Source: Kerndaten (public tenders) · 10 records · checked 10 October 2026· Found automatically. Check with the source.
    History (10)
    1. award published (Kerndaten)
    2. award published (Kerndaten)
    3. award published (Kerndaten)
    4. award published (Kerndaten)
    5. award published (Kerndaten)
    6. award published (Kerndaten)
    7. award published (Kerndaten)
    8. award published (Kerndaten)
  • Building Dr. Eduard Kaufmann´sche Armenstiftung / Investorensuche zum Erwerb eines Baurechts
    823 m Contract awarded 7 November 2025 Source: TED (EU tenders) · 3 records · checked 10 October 2026· Found automatically. Check with the source.
    History (3)
    1. tender published (TED 484350-2024)
    2. tender published (TED 626975-2024)
    3. award published (TED 739467-2025)
  • New quarter Obere Donaustraße 23-29
    952 m Approved 2022 Source: Stadt Wien · checked 16 October 2026

From the City of Vienna (construction sites that affect traffic, zoning procedures, building freezes, planned U-Bahn, tram and major roads), public tenders, the Freedom of Information register and environmental impact assessments. We have recorded these sources every day since 10 October 2026. A moved end date shows as a delay. Private building sites appear only where they affect traffic or were tendered publicly.

The address in figures

Noise

Loudest facade (day–evening–night level)
road 60–64 dB
Quiet side
yes

Getting around

Public transport class
A
Nearest stop
Wien Althanstraße, 3 min walk, every 7 min
Frequent service (every 10 min or more often)
Wien Althanstraße, 3 min walk, every 7 min

On foot

Supermarket
3 min
Pharmacy
3 min
Doctor's practice
1 min
Crèche
2 min
Kindergarten
1 min
Primary school
1 min
Middle school
7 min
Playground
1 min

Green and air

Green and open land within 300 m
7 %
Nearest park
Lichtentalerpark, 1 min walk
Nearest forest
unnamed, 4 min walk
NO₂ / PM2.5, modelled 2022
34.6 / 11.3 µg/m³
Heat days per year, now → around 2050
–

Hazards and rules

Flooding
outside mapped flood areas
Zoning
residential
Protection zones
outside all zones

Residents

Residents within 300 m
6,997 · very densely populated for Vienna
Who lives in the neighbourhood
younger residents than in most of Vienna; more people between 15 and 29; fewer children

Prices

Apartments, average €/m² by building age
€ 4,750–6,404 (the Alsergrund district)

The full report explains every figure, chapter by chapter, with what to check before you sign →

Sources: BEV cadastre and address register, Stadt Wien OGD (zoning, flood and protection zones, facility registers), BMLUK noise and flood maps, WLV hazard zones, ÖROK ÖV-Güteklassen 2025, European Environment Agency, Statistik Austria, © OpenStreetMap contributors. CC BY 4.0 / ODbL. Lagecheck processed the data. All sources and licences →