Your address

Ybbsstraße 43-45

1020 Wien · 2. Leopoldstadt

The outline marks the neighbourhood Ybbsstraße / Ennsgasse area, with 57 addresses.worksplannedzoning change · projects nearby

The LAGE score

This building

Weak · better than 7 % of all addresses in Vienna

The neighbourhood

Ybbsstraße / Ennsgasse area · Fair · Vienna average: 65.

ScoreThis buildingNeighbourhoodVienna
LQuietness 5 6787
LAir quality 32 3246
APublic transport 100 10090
GGreen space 65 5153
GNatural hazards 100 100100
EEveryday amenities 100 10097

0–100, higher is better. The neighbourhood and city columns show the average score of all their addresses, scored with the same rules.

LAGE stands for Lärm & Luft (noise & air) · Anbindung (transport links) · Grün & Gefahren (green & hazards) · Erledigungen (everyday errands). How it is calculated →

Set your priorities to see your own LAGE for this building →

The neighbourhood in figures

Loud road facade (≥ 65 dB Lden)
42 % of addresses
Free of mapped noise ≥ 55 dB at the building
0 %
Inside a 30- or 100-year flood area
0 %
Public transport class A or B
100 %
Green & open land within 300 m (average)
13 %
Distance to the nearest park or forest (average)
145 m
Residents
2,011 · more densely populated than most of Vienna
The neighbourhood report →

Building works and projects nearby

2 projects reach this address. 11 more projects within 1 km.

Works and changes that reach this address

Further away, within 1 km (11)
  • Building Stadt Wien - Wiener Wohnen - 02., Mexikoplatz 25 - Baumeister
    196 m Contract awarded 25 June 2025 Source: Kerndaten (public tenders) · 9 records · checked 10 October 2026· Found automatically. Check with the source.
    History (9)
    1. award published (Kerndaten)
    2. award published (Kerndaten)
    3. award published (Kerndaten)
    4. award published (Kerndaten)
    5. award published (Kerndaten)
    6. award published (Kerndaten)
    7. award published (Kerndaten)
    8. award published (Kerndaten)
  • Building Generalunternehmerleistungen - PV-Anlage Standort Handelskai 267/Wien
    528 m Contract awarded 12 November 2025 Source: Kerndaten (public tenders) · 3 records · checked 10 October 2026· Found automatically. Check with the source.
    History (3)
    1. award published (Kerndaten)
    2. award published (Kerndaten)
    3. award published (Kerndaten)
  • Pipes and cables Ausstellungsstraße von 21 bis 23 pipe laying
    632 m Under construction · works since 7 June 2026, planned until 31 March 2027 Source: Stadt Wien · 7 records · checked 16 October 2026
  • Building A23 Südosttangente Wien, GE Kn Prater - ASt Handelskai, km 10,596 - km 12,287
    711 m Contract awarded · contract period 8 July 2024 – 31 October 2031 Source: TED (EU tenders) · 24 records · checked 10 October 2026· Found automatically. Check with the source.
    History (24)
    1. award published (TED 197646-2026)
    2. award published (TED 204964-2026)
    3. award published (TED 218285-2026)
    4. award published (TED 239657-2026)
    5. award published (TED 287541-2026)
    6. award published (TED 411646-2026)
    7. award published (TED 524521-2026)
    8. award published (TED 644329-2026)
  • Roads and bridges Praterstern von Kreuzung Franzensbrückenstraße bis Kreuzung Hauptallee works on a special structure
    801 m Under construction · works since 14 September 2026, planned until 30 November 2026 Source: Stadt Wien · 7 records · checked 16 October 2026
  • Building VIECON Messe Wien - Audiovisuelle Systeme (AVS)
    810 m Contract awarded · contract period 1 January 2027 – 31 December 2031 Source: TED (EU tenders) · 2 records · checked 10 October 2026· Found automatically. Check with the source.
    History (2)
    1. tender published (TED 63809-2026)
    2. award published (TED 574128-2026)
  • Building Errichtung eines Kulturkiosk
    817 m Contract awarded 8 December 2023 Source: TED (EU tenders) · 6 records · checked 10 October 2026· Found automatically. Check with the source.
    History (6)
    1. tender published (TED 507205-2023)
    2. tender published (TED 593780-2023)
    3. notice changed (TED 663013-2023)
    4. award published (TED 742795-2023)
    5. tender published (TED 660604-2024)
    6. tender published (TED 661054-2024)
  • Roads and bridges (ProVia-ID 140655) SBW-St; Bau; Baumeisterarbeiten Wien Mitte - Baumeisterarbeiten Wien Mitte - Praterstern (M14,16,17,20,21,22,32,33,38)
    918 m Contract awarded 31 May 2026 Source: TED (EU tenders), Kerndaten (public tenders) · 11 records · checked 15 October 2026· Found automatically. Check with the source.
    History (11)
    1. award published (Kerndaten)
    2. award published (TED 375124-2026)
    3. award published (Kerndaten)
    4. award published (Kerndaten)
    5. award published (Kerndaten)
    6. tender published (Kerndaten)
    7. tender published (Kerndaten)
    8. tender published (Kerndaten)
  • Pipes and cables Nordbahnstraße von Alliiertenstraße bis Am Tabor pipe laying
    937 m Under construction · works since 26 July 2026, planned until 1 November 2026 Source: Stadt Wien · 7 records · checked 16 October 2026
  • Public transport ÖBB Wohnprogramm, 1020 Wien, Mühlfeldgasse 15 & 16 - Generalunternehmerleistungen Bau
    974 m Contract awarded 23 June 2025 Source: Kerndaten (public tenders) · checked 10 October 2026· Found automatically. Check with the source.
  • Zoning change Lößlweg
    988 m Zoning in progress · draft on public display 12 August 2026 – 23 September 2026; building freeze until 12 March 2027 Source: Stadt Wien · 2 records · checked 16 October 2026
    History (2)
    1. building freeze announced
    2. procedure stage: Nach öffentlicher Auflage

From the City of Vienna (construction sites that affect traffic, zoning procedures, building freezes, planned U-Bahn, tram and major roads), public tenders, the Freedom of Information register and environmental impact assessments. We have recorded these sources every day since 10 October 2026. A moved end date shows as a delay. Private building sites appear only where they affect traffic or were tendered publicly.

The address in figures

Noise

Loudest facade (day–evening–night level)
road ≥ 75 dB
Quiet side
yes

Getting around

Public transport class
A
Nearest stop
Wien Vorgartenstraße, 1 min walk, every 2 min
Frequent service (every 10 min or more often)
Wien Vorgartenstraße, 1 min walk, every 2 min

On foot

Supermarket
2 min
Pharmacy
2 min
Doctor's practice
3 min
Crèche
5 min
Kindergarten
4 min
Primary school
1 min
Middle school
6 min
Playground
4 min

Green and air

Green and open land within 300 m
20 %
Nearest park
Mexikopark, 2 min walk
Nearest forest
–
NO₂ / PM2.5, modelled 2022
30.4 / 12.2 µg/m³
Heat days per year, now → around 2050
–

Hazards and rules

Flooding
outside mapped flood areas
Zoning
residential
Protection zones
outside all zones

Residents

Residents within 300 m
6,498 · more densely populated than most of Vienna
Who lives in the neighbourhood
fewer children

Prices

Apartments, average €/m² by building age
€ 4,603–6,369 (the Leopoldstadt district)

The full report explains every figure, chapter by chapter, with what to check before you sign →

Sources: BEV cadastre and address register, Stadt Wien OGD (zoning, flood and protection zones, facility registers), BMLUK noise and flood maps, WLV hazard zones, ÖROK ÖV-Güteklassen 2025, European Environment Agency, Statistik Austria, © OpenStreetMap contributors. CC BY 4.0 / ODbL. Lagecheck processed the data. All sources and licences →