Your address
Zollergasse 16
1070 Wien · 7. Neubau
The LAGE score
This building
Modest · better than 33 % of all addresses in Vienna
The neighbourhood
Mondscheingasse area · Modest · Vienna average: 65.
| Score | This building | Neighbourhood | Vienna |
|---|---|---|---|
| LQuietness | 87 | 67 | 87 |
| LAir quality | 20 | 20 | 46 |
| APublic transport | 100 | 100 | 90 |
| GGreen space | 41 | 38 | 53 |
| GNatural hazards | 100 | 100 | 100 |
| EEveryday amenities | 100 | 100 | 97 |
0–100, higher is better. The neighbourhood and city columns show the average score of all their addresses, scored with the same rules.
LAGE stands for Lärm & Luft (noise & air) · Anbindung (transport links) · Grün & Gefahren (green & hazards) · Erledigungen (everyday errands). How it is calculated →
Set your priorities to see your own LAGE for this building →
The neighbourhood in figures
- Loud road facade (≥ 65 dB Lden)
- 37 % of addresses
- Free of mapped noise ≥ 55 dB at the building
- 0 %
- Inside a 30- or 100-year flood area
- 0 %
- Public transport class A or B
- 100 %
- Green & open land within 300 m (average)
- 8 %
- Distance to the nearest park or forest (average)
- 334 m
- Protection zone (Schutzzone)
- 60 %
- Residents
- 605 · more densely populated than most of Vienna
Building works and projects nearby
1 project reaches this address. 1 new station is planned within walking distance. 12 more projects within 1 km.
New stations nearby
-
Public transport New station Neubaugasse (U2)163 m U2, 4. Ausbauphase · Under construction · opening planned for 2030 Source: Stadt Wien · 42 records · checked 16 October 2026
Works and changes that reach this address
-
Public transport Kirchengasse 1 bis 30 U-Bahn construction122 m Under construction · works since 28 February 2021, planned until 31 December 2029 · part of U2, 4. Ausbauphase Source: Stadt Wien · 7 records · checked 16 October 2026
Further away, within 1 km (12)
-
Public transport Mariahilfer Straße von Stiftgasse bis Erika-Weinzierl-Platz und Kirchengasse track works211 m Under construction · works since 28 February 2021, planned until 31 December 2029 Source: Stadt Wien · 7 records · checked 16 October 2026
-
Roads and bridges 6., Windmühlgasse u.a.347 m Contract awarded · contract period 1 September 2026 – 22 October 2027 Source: TED (EU tenders) · 3 records · checked 10 October 2026· Found automatically. Check with the source.
History (3)
- tender published (TED 451515-2026)
- tender published (TED 518208-2026)
- award published (TED 672839-2026)
-
Building E90094/196/0-Dion7/2025, 1070 Wien, Stiftgasse 2-2A, Stift Kaserne, Obj. 001 - Mosertrakt, Instandsetzung - Trockenlegung, Baumeisterarbeiten359 m Contract awarded 3 February 2026 Source: Kerndaten (public tenders) · 3 records · checked 10 October 2026· Found automatically. Check with the source.
History (3)
- award published (Kerndaten)
- award published (Kerndaten)
- award published (Kerndaten)
-
Building 1060 Wien, Amerlingstraße 6 / Küchenumbau / Baumeisterarbeiten375 m Contract awarded 27 May 2025 Source: Kerndaten (public tenders) · 12 records · checked 10 October 2026· Found automatically. Check with the source.
History (12)
- award published (Kerndaten)
- award published (Kerndaten)
- award published (Kerndaten)
- award published (Kerndaten)
- award published (Kerndaten)
- award published (Kerndaten)
- award published (Kerndaten)
- award published (Kerndaten)
-
Building Mein Gesundheitszentrum Neubau - Teil-Generalunternehmer Rohbau379 m Tendered · contract period 15 September 2026 – 4 December 2030 Source: TED (EU tenders) · 6 records · checked 16 October 2026· Found automatically. Check with the source.
History (6)
- tender published (TED 465942-2026)
- tender published (TED 487766-2026)
- tender published (TED 490200-2026)
- tender published (TED 496163-2026)
- tender published (TED 593204-2026)
- tender published (TED 704637-2026)
-
Roads and bridges Burggasse 67 road works446 m Under construction · works since 27 July 2026, planned until 30 October 2026 Source: Stadt Wien · 7 records · checked 16 October 2026
-
Roads and bridges Burggasse 25 bis 45 road works455 m Under construction · works since 27 July 2026, planned until 30 October 2026 Source: Stadt Wien · 7 records · checked 16 October 2026
-
Building 1070 Wien, Neustiftgasse 95-99, Dämmung oberste Geschoßdecke - Baumeisterarbeiten666 m Contract awarded 8 January 2025 Source: Kerndaten (public tenders) · 4 records · checked 10 October 2026· Found automatically. Check with the source.
History (4)
- award published (Kerndaten)
- award published (Kerndaten)
- award published (Kerndaten)
- award published (Kerndaten)
-
Pipes and cables Linke Wienzeile 90-92 sewer works697 m Under construction · works since 19 May 2026, planned until 18 December 2026 Source: Stadt Wien · 7 records · checked 16 October 2026
-
Building Naschmarkt – Ost – Marktraum vorbereitende Maßnahmen Bauphase 1A773 m Tendered · contract period 23 October 2024 – 21 February 2027 Source: TED (EU tenders) · 4 records · checked 10 October 2026· Found automatically. Check with the source.
History (4)
- tender published (TED 512553-2024)
- tender published (TED 661131-2024)
- tender published (TED 718666-2024)
- tender published (TED 513099-2026)
-
Building 1060 Wien, Getreidemarkt 9- Baumeisterarbeiten (Zaunsanierung)829 m Contract awarded 2 September 2026 Source: Kerndaten (public tenders) · 13 records · checked 10 October 2026· Found automatically. Check with the source.
History (13)
- award published (Kerndaten)
- award published (Kerndaten)
- award published (Kerndaten)
- award published (Kerndaten)
- award published (Kerndaten)
- award published (Kerndaten)
- award published (Kerndaten)
- award published (Kerndaten)
-
Public transport Volksgartenstraße 2 U-Bahn construction829 m Under construction · works since 28 February 2021, planned until 31 December 2029 Source: Stadt Wien · 7 records · checked 16 October 2026
From the City of Vienna (construction sites that affect traffic, zoning procedures, building freezes, planned U-Bahn, tram and major roads), public tenders, the Freedom of Information register and environmental impact assessments. We have recorded these sources every day since 10 October 2026. A moved end date shows as a delay. Private building sites appear only where they affect traffic or were tendered publicly.
All projects in Vienna → Know of a project that is missing? Tell us
The address in figures
Noise
- Loudest facade (day–evening–night level)
- road 55–59 dB
- Quiet side
- yes
Getting around
- Public transport class
- A
- Nearest stop
- Wien Westbahnstraße/Neubaugasse, 3 min walk, every 2 min
- Frequent service (every 10 min or more often)
- Wien Westbahnstraße/Neubaugasse, 3 min walk, every 2 min
On foot
- Supermarket
- 1 min
- Pharmacy
- 3 min
- Doctor's practice
- 2 min
- Crèche
- 3 min
- Kindergarten
- 3 min
- Primary school
- 6 min
- Middle school
- 3 min
- Playground
- 4 min
Green and air
- Green and open land within 300 m
- 7 %
- Nearest park
- Andreaspark, 4 min walk
- Nearest forest
- –
- NO₂ / PM2.5, modelled 2022
- 25.9 / 11.0 µg/m³
- Heat days per year, now → around 2050
- –
Hazards and rules
- Flooding
- outside mapped flood areas
- Zoning
- core / mixed use
- Protection zones
- outside all zones
Residents
- Residents within 300 m
- 5,289 · more densely populated than most of Vienna
- Who lives in the neighbourhood
- fewer children
Prices
- Apartments, average €/m² by building age
- € 4,849–6,214 (the Neubau district)
The full report explains every figure, chapter by chapter, with what to check before you sign →
Sources: BEV cadastre and address register, Stadt Wien OGD (zoning, flood and protection zones, facility registers), BMLUK noise and flood maps, WLV hazard zones, ÖROK ÖV-Güteklassen 2025, European Environment Agency, Statistik Austria, © OpenStreetMap contributors. CC BY 4.0 / ODbL. Lagecheck processed the data. All sources and licences →