Your address

Taborstraße 89

1200 Wien · 20. Brigittenau

The outline marks the neighbourhood Taborstraße / Nordwestbahnstraße area, with 16 addresses.worksplannedzoning change · projects nearby

The LAGE score

This building

Modest · better than 27 % of all addresses in Vienna

The neighbourhood

Taborstraße / Nordwestbahnstraße area · Modest · Vienna average: 65.

ScoreThis buildingNeighbourhoodVienna
LQuietness 20 2787
LAir quality 37 3646
APublic transport 100 10090
GGreen space 72 5153
GNatural hazards 100 100100
EEveryday amenities 100 10097

0–100, higher is better. The neighbourhood and city columns show the average score of all their addresses, scored with the same rules.

LAGE stands for Lärm & Luft (noise & air) · Anbindung (transport links) · Grün & Gefahren (green & hazards) · Erledigungen (everyday errands). How it is calculated →

Set your priorities to see your own LAGE for this building →

The neighbourhood in figures

Loud road facade (≥ 65 dB Lden)
69 % of addresses
Free of mapped noise ≥ 55 dB at the building
6 %
Inside a 30- or 100-year flood area
0 %
Public transport class A or B
94 %
Green & open land within 300 m (average)
11 %
Distance to the nearest park or forest (average)
152 m
Protection zone (Schutzzone)
6 %
Residents
438 · about as densely populated as most of Vienna
The neighbourhood report →

Building works and projects nearby

This address lies beyond the reach of every construction site, zoning change and planned line. 12 more projects within 1 km.

Further away, within 1 km (12)
  • Building Heizung, Klimatechnik, Lüftung und Sanitär
    157 m Tendered · contract period 30 March 2026 – 28 June 2027 Source: TED (EU tenders) · 3 records · checked 10 October 2026· Found automatically. Check with the source.
    History (3)
    1. tender published (TED 629712-2025)
    2. tender published (TED 701861-2025)
    3. tender published (TED 705095-2025)
  • Building 20., Nordwestbahnhof – Phase A.2
    172 m Tendered · 100 flats Source: Stadt Wien · checked 16 October 2026
  • Building BAUI.IM6009: Technische Freimachung Wien Nordwestbahnhof - Abbrucharbeiten
    204 m Contract awarded 28 September 2026 Source: Kerndaten (public tenders) · 4 records · checked 12 October 2026· Found automatically. Check with the source.
    History (4)
    1. award published (Kerndaten)
    2. award published (Kerndaten)
    3. award published (Kerndaten)
    4. award published (Kerndaten)
  • Building PPP-Projekt Bildungscampus Nordwestbahnhof (BC NWBHF Planung, Errichtung, Finanzierung und Verfügbarhaltung) Adresse: 20., Rebhanngasse
    204 m Contract awarded · since 1 June 2026 Source: TED (EU tenders) · 2 records · checked 10 October 2026· Found automatically. Check with the source.
    History (2)
    1. tender published (TED 587888-2024)
    2. award published (TED 326240-2026)
  • Pipes and cables Kanalsanierung und Hybridanlage - Schule Wien 2, Vereinsgasse 29
    212 m Contract awarded 12 December 2025 Source: data.gv.at (information requests) · checked 10 October 2026· Found automatically. Check with the source.
  • Roads and bridges (ProVia-ID 116375) Technische Freimachung Wien Nordwestbahnhof; Abbrucharbeiten
    234 m Contract awarded · contract period 2 September 2024 – 1 September 2028 Source: TED (EU tenders) · 2 records · checked 10 October 2026· Found automatically. Check with the source.
    History (2)
    1. tender published (TED 281451-2024)
    2. award published (TED 492315-2024)
  • New quarter 20., Nordwestbahnhof – Phase A.1
    363 m Planned · developer competition 2025 · 520 flats Source: Stadt Wien · checked 16 October 2026
  • Pipes and cables Nordbahnstraße von Alliiertenstraße bis Am Tabor pipe laying
    405 m Under construction · works since 26 July 2026, planned until 1 November 2026 Source: Stadt Wien · 7 records · checked 16 October 2026
  • New quarter Nordwestbahnstraße 59-39
    424 m Approved 2022 Source: Stadt Wien · checked 16 October 2026
  • Zoning change Plandokument 8461: Gebiet zwischen Innstraße (Bezirksgrenze), Linienzug 1-2 (Trasse ÖBB Nordbahn), Linienzug 2-3, Nordbahnstraße (Bezirksgrenze) und Dresdner St
    562 m Zoning in progress 25 November 2025 Source: data.gv.at (information requests) · checked 10 October 2026
  • New quarter 20., Nordwestbahnhof
    607 m Tendered · 5700 flats Source: Stadt Wien · checked 16 October 2026
  • Zoning change Nordbahnhof-Innstraße
    645 m Zoning in progress · draft on public display 12 August 2026 – 23 September 2026; building freeze until 12 March 2027 Source: Stadt Wien · 2 records · checked 16 October 2026
    History (2)
    1. building freeze announced
    2. procedure stage: Nach öffentlicher Auflage

From the City of Vienna (construction sites that affect traffic, zoning procedures, building freezes, planned U-Bahn, tram and major roads), public tenders, the Freedom of Information register and environmental impact assessments. We have recorded these sources every day since 10 October 2026. A moved end date shows as a delay. Private building sites appear only where they affect traffic or were tendered publicly.

The address in figures

Noise

Loudest facade (day–evening–night level)
road 65–69 dB, rail 60–64 dB
Quiet side
no

Getting around

Public transport class
A
Nearest stop
Wien Am Tabor, 1 min walk, every 3 min
Frequent service (every 10 min or more often)
Wien Am Tabor, 1 min walk, every 3 min

On foot

Supermarket
2 min
Pharmacy
5 min
Doctor's practice
3 min
Crèche
3 min
Kindergarten
2 min
Primary school
3 min
Middle school
5 min
Playground
3 min

Green and air

Green and open land within 300 m
24 %
Nearest park
Augarten, 1 min walk
Nearest forest
unnamed, 3 min walk
NO₂ / PM2.5, modelled 2022
28.9 / 11.6 µg/m³
Heat days per year, now → around 2050
–

Hazards and rules

Flooding
outside mapped flood areas
Zoning
core / mixed use
Protection zones
outside all zones

Residents

Residents within 300 m
3,387 · about as densely populated as most of Vienna
Who lives in the neighbourhood
older residents than in most of Vienna; more older people; fewer children and people between 15 and 29

Prices

Apartments, average €/m² by building age
€ 3,569–5,058 (the Brigittenau district)

The full report explains every figure, chapter by chapter, with what to check before you sign →

Sources: BEV cadastre and address register, Stadt Wien OGD (zoning, flood and protection zones, facility registers), BMLUK noise and flood maps, WLV hazard zones, ÖROK ÖV-Güteklassen 2025, European Environment Agency, Statistik Austria, © OpenStreetMap contributors. CC BY 4.0 / ODbL. Lagecheck processed the data. All sources and licences →