Your address
Linzer Straße 237
1140 Wien · 14. Penzing
The LAGE score
This building
Modest · better than 31 % of all addresses in Vienna
The neighbourhood
Linzer Straße / Zehetnergasse area · Weak · Vienna average: 65.
| Score | This building | Neighbourhood | Vienna |
|---|---|---|---|
| LQuietness | 32 | 17 | 87 |
| LAir quality | 42 | 24 | 46 |
| APublic transport | 100 | 90 | 90 |
| GGreen space | 52 | 54 | 53 |
| GNatural hazards | 100 | 100 | 100 |
| EEveryday amenities | 97 | 97 | 97 |
0–100, higher is better. The neighbourhood and city columns show the average score of all their addresses, scored with the same rules.
LAGE stands for Lärm & Luft (noise & air) · Anbindung (transport links) · Grün & Gefahren (green & hazards) · Erledigungen (everyday errands). How it is calculated →
Set your priorities to see your own LAGE for this building →
The neighbourhood in figures
- Loud road facade (≥ 65 dB Lden)
- 89 % of addresses
- Free of mapped noise ≥ 55 dB at the building
- 0 %
- Inside a 30- or 100-year flood area
- 0 %
- Public transport class A or B
- 98 %
- Green & open land within 300 m (average)
- 12 %
- Distance to the nearest park or forest (average)
- 110 m
- Residents
- 975 · more densely populated than most of Vienna
Building works and projects nearby
1 project reaches this address. 11 more projects within 1 km.
Works and changes that reach this address
-
Public transport Attraktivierung der Verbindungsbahn (ÖBB-Strecke 12201 Wien Hütteldorf - Wien Praterstern, ÖBB-Strecke 12101 Wien Penzing - Abzweigung Hütteldorf, ÖBB-Strecke 10615 Wien Maxing - Wien Matzleinsdorf-Altmannsdorf)119 m Approval pending Source: Umweltbundesamt (environmental impact assessment) · checked 16 October 2026 · route © OpenStreetMap contributors
Further away, within 1 km (11)
-
Pipes and cables Hadikgasse von ggü. 162 bis ggü. 172 sewer works294 m Under construction · works since 22 June 2025, planned until 31 December 2027 Source: Stadt Wien · 7 records · checked 16 October 2026
-
Zoning change Plandokument 8436: Gebiet zwischen Hietzinger Kai, Fleschgasse, Auhofstraße und St.-Veit-Gasse446 m Zoning in progress 25 November 2025 Source: data.gv.at (information requests) · checked 10 October 2026
-
Building Bauträgerwettbewerb für Baugruppen493 m Planned · developer competition 2020 Source: Stadt Wien · checked 16 October 2026
-
Building Stadt Wien - Wiener Wohnen - 14., Hütteldorfer Straße 268-274 - Baumeister514 m Contract awarded · contract period 23 July 2024 – 28 September 2028 · end moved 1436 days later since first listed Source: TED (EU tenders) · 24 records · checked 10 October 2026· Found automatically. Check with the source.
History (24)
- award published (TED 468738-2026)
- award published (TED 470183-2026)
- award published (TED 470239-2026)
- award published (TED 470297-2026)
- award published (TED 470525-2026)
- award published (TED 471319-2026)
- award published (TED 471674-2026)
- award published (TED 509727-2026)
-
Building Bildungsdirektion für Wien - Teil-Generalunternehmerarbeiten für WC-Gruppen Sanierung in 1140 Wien, Linzerstraße 146636 m Contract awarded 8 June 2026 Source: Kerndaten (public tenders) · 5 records · checked 10 October 2026· Found automatically. Check with the source.
History (5)
- award published (Kerndaten)
- award published (Kerndaten)
- award published (Kerndaten)
- award published (Kerndaten)
- award published (Kerndaten)
-
Roads and bridges (ProVia-ID 131281) Attraktivierung der Verbindungsbahn; Baumeisterarbeiten Baulos Mitte649 m Contract awarded · contract period 8 September 2025 – 10 May 2030 Source: TED (EU tenders) · 8 records · checked 10 October 2026· Found automatically. Check with the source.
History (8)
- tender published (TED 128478-2025)
- tender published (TED 227365-2025)
- award published (TED 542988-2025)
- tender published (TED 56300-2026)
- tender published (TED 77108-2026)
- tender published (TED 183076-2026)
- tender published (TED 211874-2026)
- award published (TED 592567-2026)
-
Building Teil-GU Baumeisterarbeiten: Lüftungsanlage und NSHV Pav.3 Mein Hanusch-Krankenhaus, Heinrich-Collin-Straße 30,1140 Wien712 m Contract awarded 7 November 2024 Source: Kerndaten (public tenders) · 24 records · checked 10 October 2026· Found automatically. Check with the source.
History (24)
- award published (Kerndaten)
- award published (Kerndaten)
- award published (Kerndaten)
- award published (Kerndaten)
- award published (Kerndaten)
- award published (Kerndaten)
- award published (Kerndaten)
- award published (Kerndaten)
-
Pipes and cables Hietzinger Kai Kreuzung Braunschweiggasse water main works736 m Under construction · works since 11 October 2026, planned until 27 November 2026 Source: Stadt Wien · 7 records · checked 16 October 2026
-
Pipes and cables Hietzinger Kai Kreuzung Hietzinger Kai und Braunschweiggasse sewer works736 m Under construction · works since 29 July 2026, planned until 13 November 2026 Source: Stadt Wien · 7 records · checked 16 October 2026
-
Zoning change Hackinger Straße774 m Zoning in progress · building freeze since 7 May 2025 Source: Stadt Wien · checked 16 October 2026
-
Pipes and cables V15 Wientalquerung Düker 1. HL, 13., Preindlgasse 35786 m Tendered · contract period 20 July 2026 – 20 December 2026 Source: TED (EU tenders) · checked 10 October 2026· Found automatically. Check with the source.
From the City of Vienna (construction sites that affect traffic, zoning procedures, building freezes, planned U-Bahn, tram and major roads), public tenders, the Freedom of Information register and environmental impact assessments. We have recorded these sources every day since 10 October 2026. A moved end date shows as a delay. Private building sites appear only where they affect traffic or were tendered publicly.
All projects in Vienna → Know of a project that is missing? Tell us
The address in figures
Noise
- Loudest facade (day–evening–night level)
- road 55–59 dB, rail 70–74 dB
- Quiet side
- yes
Getting around
- Public transport class
- A
- Nearest stop
- Wien Zehetnergasse, 2 min walk, every 5 min
- Frequent service (every 10 min or more often)
- Wien Zehetnergasse, 2 min walk, every 5 min
On foot
- Supermarket
- 2 min
- Pharmacy
- 5 min
- Doctor's practice
- 4 min
- Crèche
- 5 min
- Kindergarten
- 5 min
- Primary school
- 7 min
- Middle school
- 16 min
- Playground
- 5 min
Green and air
- Green and open land within 300 m
- 13 %
- Nearest park
- Gustav-Klimt-Park, 3 min walk
- Nearest forest
- –
- NO₂ / PM2.5, modelled 2022
- 27.4 / 11.6 µg/m³
- Heat days per year, now → around 2050
- –
Hazards and rules
- Flooding
- outside mapped flood areas
- Zoning
- commercial
- Protection zones
- outside all zones
Residents
- Residents within 300 m
- 3,665 · about as densely populated as most of Vienna
- Who lives in the neighbourhood
- younger residents than in most of Vienna; more people between 15 and 29; fewer children and older people
Prices
- Apartments, average €/m² by building age
- € 3,694–5,796 (the Penzing district)
The full report explains every figure, chapter by chapter, with what to check before you sign →
Sources: BEV cadastre and address register, Stadt Wien OGD (zoning, flood and protection zones, facility registers), BMLUK noise and flood maps, WLV hazard zones, ÖROK ÖV-Güteklassen 2025, European Environment Agency, Statistik Austria, © OpenStreetMap contributors. CC BY 4.0 / ODbL. Lagecheck processed the data. All sources and licences →